Hierarchical Rule‐Based Activity Duration Estimation
Publication: Journal of Construction Engineering and Management
Volume 113, Issue 2
Abstract
Activity durations are often estimated by modifying standard work productivities for specific site and job characteristics. Modifications are typically developed from engineering judgment and past experience. In this paper, an explicit hierarchical rule‐based framework for making such modifications is investigated. By explicitly formulating estimation rules, the factors felt to influence work productivity can be identified and the accuracy of particular modification rules assessed. Alternative estimation methods such as statistical techniques and a hybrid rule‐and‐statistical framework are discussed. A prototype expert system for masonry construction duration estimation, MASON, is described and used to illustrate the rule‐based estimation approach. Facilities in MASON for explanation and productivity improvement analysis are also described.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ang, A. H.‐S., and Tang, W. H., Probability Concepts in Engineering Planning and Design, John Wiley, New York, N.Y., 1975.
2.
Au, T., Shane, R. M., and Hoel, L. A., Fundamentals of Systems Engineering: Probabilistic Models, Addison‐Wesley Publishing Company, Reading, Mass., 1971.
3.
Ayyub, B. M., and Haldar, A., “Project Scheduling Using Fuzzy Set Concepts,” Journal of Construction Engineering and Management, ASCE, Vol. 110, No. 2, Jun., 1984, pp. 189–204.
4.
Brownston, L., et al., Programming Expert Systems in OPS5, Addison‐Wesley, Reading, Mass., 1985.
5.
Dagostino, F. R., Estimation in Building Construction, Reston Publishing Company, Reston, Va., 1978.
6.
Diekmann, J. E., “Probabilistic Estimating: Mathematics and Applications,” Journal of Construction Engineering and Management, ASCE, Vol. 109, No. 3, Sep., 1983, pp. 297–308.
7.
Forgy, C. L., “OPS5 User's Manual,” Technical Report CMU‐CS‐84‐133, Dept. of Computer Science, Carnegie‐Mellon University, Pittsburgh, Pa., Jul., 1981.
8.
Harmon, P., and King, D., Expert Systems: Artificial Intelligence in Business, John Wiley and Sons, New York, N.Y., 1985.
9.
King, W. R., and Wilson, T. A., “Subjective Time Estimates in Critical Path Planning—A Preliminary Analysis,” Management Science, Vol. 13, No. 5, Jan., 1967, pp. 307–320.
10.
King, W. R., Wittevrongel, D. M., and Hezel, K. D., “On the Analysis of Critical Path Time Estimating Behavior,” Management Science, Vol. 14, No. 1, Sep., 1967, pp. 79–84.
11.
Kostem, C., and Maher, M. L., Eds., Applications of Expert Systems in Civil Engineering, ASCE, New York, N.Y., 1985.
12.
Levitt, R. E., and Kunz, J. C., “Using Knowlege of Construction and Project Management for Automated Schedule Updating,” Project Management Journal, Vol. 16, No. 5, Dec., 1985, pp. 57–76.
13.
Martinelli, D., “MASON: An Expert System for Masonry Activity Duration Estimation,” Technical Report, Department of Civil Engineering, Carnegie‐Mellon University, Pittsburgh, Pa., 1986.
14.
McGartland, M., and Hendrickson, C. T., “Expert Systems for Construction Project Monitoring,” Journal of Construction Engineering and Management, ASCE, Vol. 111, No. 3, Sep., 1985, pp. 293–307.
15.
Moder, J. J., Phillips, C. R., and Davis, E. W., Project Management with CPM, PERT and Precedence Diagramming, Van Nostrand Reinhold Company, New York, N.Y., 1983.
16.
Rehak, D. R., and Fenves, S. J., “Expert Systems in Civil Engineering, Construction and Construction Robotics,” in 1984 Annual Research Review, Technical Report, Robotics Institute, Carnegie‐Mellon University, Pittsburgh, Pa., 1985.
17.
Smith, L. A., and Mandakovic, T., “Estimating: The Input into Good Project Planning,” IEEE Transactions on Engineering Management, Vol. EM‐32, No. 4, Nov., 1985, pp. 181–185.
18.
Sriram, D., and Adey, R., Eds., Applications of Artificial Intelligence in Engineering Problems, Springer‐Verlag, New York, N.Y., 1986.
19.
Wass, A., Building Construction Estimating, Prentice‐Hall, Inc., Englewood Cliffs, N.J., 1970.
20.
Willis, E. M., Scheduling Construction Projects, John Wiley and Sons, New York, N.Y., 1986.
Information & Authors
Information
Published In
Copyright
Copyright © 1987 ASCE.
History
Published online: Jun 1, 1987
Published in print: Jun 1987
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.