Abstract

Maturity models are credited with raising project management awareness, but no conclusive evidence supports their use as a tool for performance enhancement in construction project settings. The present study thus examined the influence of time, cost, and quality management maturity on performance indices of building construction projects in Myanmar. The study further assessed how maturity in time, cost, and quality varied between public and private construction organizations. Four building construction projects, i.e., two operated by private construction organizations and two operated by public construction organizations in Myanmar, have been chosen for the data collection. The project manager and an individual from the upper management of each project were interviewed in three stages to obtain the maturity level. The performance indices of each project were evaluated quantitatively. The study’s findings revealed a positive relationship between project management maturity and project performance. Specifically, a higher time management maturity contributed to greater time performance, and elevated cost management maturity projected higher cost performance. Contrary to the expectations, the study could not find a significant relationship between quality management maturity and quality performance. The results further revealed that the average time management maturity of public construction organizations was significantly higher. Still, the average cost and quality management maturity were considerably lower than that of private construction organizations. The construction organizations aiming to enhance the project performance should focus on reaching a higher maturity in time and cost management knowledge areas.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abbasi, O., E. Noorzai, K. Gharouni Jafari, and M. Golabchi. 2020. “Exploring the causes of delays in construction industry using a cause-and-effect diagram: Case study for Iran.” J. Archit. Eng. 26 (3): 05020008. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431.
Alaloul, W. S., M. S. Liew, N. A. W. Zawawi, B. S. Mohammed, M. Adamu, and M. A. Musharat. 2020. “Structural equation modelling of construction project performance based on coordination factors.” Cogent Eng. 7 (1): 1726069. https://doi.org/10.1080/23311916.2020.1726069.
Anantatmula, V. S., and P. F. Rad. 2018. “Role of organizational project management maturity factors on project success.” Eng. Manage. J. 30 (3): 165–178. https://doi.org/10.1080/10429247.2018.1458208.
Atkinson, R. 1999. “Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria.” Int. J. Project Manage. 17 (6): 337–342. https://doi.org/10.1016/S0263-7863(98)00069-6.
Brookes, N., M. Butler, P. Dey, and R. Clark. 2014. “The use of maturity models in improving project management performance.” Int. J. Managing Projects Bus. 7 (2): 231–246. https://doi.org/10.1108/IJMPB-03-2013-0007.
Cacamis, M. E., and M. El Asmar. 2014. “Improving project performance through partnering and emotional intelligence.” Pract. Period. Struct. Des. Constr. 19 (1): 50–56. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000180.
Chokor, A., M. El Asmar, and B. Sai Paladugu. 2017. “Quantifying the impact of cost-based incentives on the performance of building projects in the United States.” Pract. Period. Struct. Des. Constr. 22 (2): 04016024. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000312.
Crawford, J. K. 2014. Project management maturity model. Boca Raton, FL: Auerbach Publications.
Crosby, P. B. 1979. Quality is free: The art of making quality certain. New York: Penguin.
Demir, C., and İ. Kocabaş. 2010. “Project management maturity model (PMMM) in educational organizations.” Procedia Soc. Behav. Sci. 9 (Jan): 1641–1645. https://doi.org/10.1016/j.sbspro.2010.12.379.
Denicol, J., A. Davies, and I. Krystallis. 2020. “What are the causes and cures of poor megaproject performance? A systematic literature review and research agenda.” Project Manage. J. 51 (3): 328–345. https://doi.org/10.1177/8756972819896113.
Dodanwala, T. C., D. S. Santoso, and P. Shrestha. 2022. “The mediating role of work–family conflict on role overload and job stress linkage.” Built Environ. Project Asset Manage. 12 (6): 924–939. https://doi.org/10.1108/BEPAM-12-2021-0153.
Dodanwala, T. C., and P. Shrestha. 2021. “Work–family conflict and job satisfaction among construction professionals: The mediating role of emotional exhaustion.” On Horizon 29 (2): 62–75. https://doi.org/10.1108/OTH-11-2020-0042.
Durdyev, S. 2021. “Review of construction journals on causes of project cost overruns.” Eng. Constr. Archit. Manage. 28 (4): 1241–1260. https://doi.org/10.1108/ECAM-02-2020-0137.
Fahrenkrog, S., F. Abrams, W. Haeck, and D. Whelbourn. 2003. “Project management institute’s organizational project management maturity model (OPM3).” In Proc., PMI North American Congress. Newtown Square, PA: Project Management Institute.
GlobalData. 2022. Myanmar construction market size, trends and forecasts by sector—Commercial, industrial, infrastructure, energy and utilities, institutional and residential market analysis, 2022-2026. London: John Carpenter House.
Grant, K. P., and J. S. Pennypacker. 2006. “Project management maturity: An assessment of project management capabilities among and between selected industries.” IEEE Trans. Eng. Manage. 53 (1): 59–68. https://doi.org/10.1109/TEM.2005.861802.
Hartono, B., D. F. Wijaya, and H. M. Arini. 2019. “The impact of project risk management maturity on performance: Complexity as a moderating variable.” Int. J. Eng. Bus. Manage. 11 (Jun): 184797901985550. https://doi.org/10.1177/1847979019855504.
Hermano, V. 2021. “Rethinking maturity models: From project management to project-based.” In Project management and engineering research, 63–73. New York: Springer.
Hurt, M., and J. L. Thomas. 2009. “Building value through sustainable project management offices.” Project Manage. J. 40 (1): 55–72. https://doi.org/10.1002/pmj.20095.
Ibbs, C. W., and Y. H. Kwak. 2000. “Assessing project management maturity.” Project Manage. J. 31 (1): 32–43. https://doi.org/10.1177/875697280003100106.
Jergeas, G. F., and J. Ruwanpura. 2010. “Why cost and schedule overruns on mega oil sands projects?” Pract. Period. Struct. Des. Constr. 15 (1): 40–43. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000024.
Jugdev, K., and J. Thomas. 2002. “Project management maturity models: The silver bullets of competitive advantage?” Project Manage. J. 33 (4): 4–14. https://doi.org/10.1177/875697280203300402.
Kermanshachi, S., B. Dao, J. Shane, and S. Anderson. 2016. “Project complexity indicators and management strategies—A Delphi study.” Procedia Eng. 145 (Jan): 587–594. https://doi.org/10.1016/j.proeng.2016.04.048.
Kerzner, H. 2002. Strategic planning for project management using a project management maturity model. New York: Wiley.
Kim, D. Y., S. H. Han, H. Kim, and H. Park. 2009. “Structuring the prediction model of project performance for international construction projects: A comparative analysis.” Expert Syst. Appl. 36 (2): 1961–1971. https://doi.org/10.1016/j.eswa.2007.12.048.
Kwak, Y. H., and C. W. Ibbs. 2002. “Project management process maturity (PM)2 model.” J. Manage. Eng. 18 (3): 150–155. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(150).
Kwak, Y. H., and C. William. 2000. “The Berkeley project management process maturity model: Measuring the value of project management.” In Proc., 2000 IEEE Engineering Management Society. EMS—2000 (Cat. No.00CH37139), 1–5. New York: IEEE.
Lo, T. Y., I. W. Fung, and K. C. Tung. 2006. “Construction delays in Hong Kong civil engineering projects.” J. Constr. Eng. Manage. 132 (6): 636–649. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636).
Meng, X. 2012. “The effect of relationship management on project performance in construction.” Int. J. Project Manage. 30 (2): 188–198. https://doi.org/10.1016/j.ijproman.2011.04.002.
Miller, G., R. Dingwall, and E. Murphy. 2004. “Using qualitative data and analysis: Reflections on organizational research.” In Qualitative research: Theory, method and practice, 324–340. London: SAGE.
Mullaly, M. 2006. “Longitudinal analysis of project management maturity.” Project Manage. J. 37 (3): 62–73. https://doi.org/10.1177/875697280603700307.
Mullaly, M. 2014. “If maturity is the answer, then exactly what was the question?” Int. J. Managing Projects Bus. 7 (2): 169–185. https://doi.org/10.1108/IJMPB-09-2013-0047.
Nguyen, L. D., L. Le-Hoai, D. Q. Tran, C. N. Dang, and C. v. Nguyen. 2019. “Effect of project complexity on cost and schedule performance in transportation projects.” Construct. Manage. Econ. 37 (7): 384–399. https://doi.org/10.1080/01446193.2018.1532592.
Olsen, R. P. 1971. “Can project management be defined?” Project Manage. Q. 2 (1): 12–14.
Oxford Business Group. 2018. The report: Myanmar 2018. London: Oxford Business Group.
Parsamehr, M., U. S. Perera, T. C. Dodanwala, P. Perera, and R. Ruparathna. 2022. “A review of construction management challenges and BIM-based solutions: Perspectives from the schedule, cost, quality, and safety management.” Asian J. Civ. Eng. 1–37. https://doi.org/10.1007/s42107-022-00501-4.
Paulk, M. C., B. Curtis, M. B. Chrissis, and C. V. Weber. 1993. “Capability maturity model, version 1.1.” IEEE Software 10 (4): 18–27. https://doi.org/10.1109/52.219617.
Pretorius, S., H. Steyn, and J. C. Jordaan. 2012. “Project management maturity and project management success in the engineering and construction industries in Southern Africa.” South Afr. J. Ind. Eng. 23 (3): 1–12. https://doi.org/10.7166/23-3-507.
Project Management Institute. 2013. A guide to the project management body of knowledge. Newtown Square, PA: Project Management Institute.
Sambasivan, M., and Y. W. Soon. 2007. “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Manage. 25 (5): 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007.
Sanchez, F., E. Bonjour, J.-P. Micaelli, and D. Monticolo. 2020. “An approach based on Bayesian network for improving project management maturity: An application to reduce cost overrun risks in engineering projects.” Comput. Ind. 119 (Aug): 103227. https://doi.org/10.1016/j.compind.2020.103227.
Santoso, D. S., and P. G. M. P. Gallage. 2019. “Critical factors affecting the performance of large construction projects in developing countries.” J. Eng. Des. Technol. 18 (3): 531–556. https://doi.org/10.1108/JEDT-05-2019-0130.
Santoso, D. S., and S. Soeng. 2016. “Analyzing delays of road construction projects in Cambodia: Causes and effects.” J. Manage. Eng. 32 (6): 05016020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000467.
Schoch, K. 2020. “Case study research.” In Research design and methods: An applied guide for the scholar-practitioner, 245–258. London: SAGE.
Tabish, S. Z. S., and K. N. Jha. 2018. “Beyond the iron triangle in public construction projects.” J. Constr. Eng. Manage. 144 (8): 04018067. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001517.
The Myanmar Times. 2018. “FDI forecast to hit US$ 5.8B in 2018-19.” Accessed July 8, 2022. https://www.mmtimes.com/news/fdi-forecast-hitus-5-8b-2018-19.html.
Willis, C. J., and J. H. Rankin. 2012. “Demonstrating a linkage between construction industry maturity and performance: A case study of Guyana and New Brunswick.” Can. J. Civ. Eng. 39 (5): 565–578. https://doi.org/10.1139/l2012-029.
Woo, J., and J. T. O’Connor. 2021. “Causal factors for engineering design defects and their impacts.” Pract. Period. Struct. Des. Constr. 26 (2): 04020071. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000562.
Yazici, H. J. 2009. “The role of project management maturity and organizational culture in perceived performance.” Project Manage. J. 40 (3): 14–33. https://doi.org/10.1002/pmj.20121.

Information & Authors

Information

Published In

Go to Practice Periodical on Structural Design and Construction
Practice Periodical on Structural Design and Construction
Volume 28Issue 1February 2023

History

Received: Mar 22, 2022
Accepted: Oct 18, 2022
Published online: Dec 9, 2022
Published in print: Feb 1, 2023
Discussion open until: May 9, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Graduate Student, Dept. of Civil and Infrastructure Engineering, School of Engineering and Technology, Asian Institute of Technology, 58 Moo 9, Km. 42, Paholyothin Hwy., Klong Luang, Pathumthani 12120, Thailand. ORCID: https://orcid.org/0000-0002-7149-1893. Email: [email protected]
Graduate Student, Dept. of Civil and Infrastructure Engineering, School of Engineering and Technology, Asian Institute of Technology, 58 Moo 9, Km. 42, Paholyothin Hwy., Klong Luang, Pathumthani 12120, Thailand. ORCID: https://orcid.org/0000-0002-8824-0097. Email: [email protected]
Associate Professor, Dept. of Civil and Infrastructure Engineering, School of Engineering and Technology, Asian Institute of Technology, 58 Moo 9, Km. 42, Paholyothin Hwy., Klong Luang, Pathumthani 12120, Thailand (corresponding author). ORCID: https://orcid.org/0000-0002-5560-6718. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share