Abstract

This study investigated the myriad risk factors contributing to cost overruns in healthcare construction projects. It determined the impact of managerial, financial, workerpower, and environmental considerations, focusing on the intricacies of healthcare facilities. By employing a modified fuzzy group decision-making approach (MFGDMA), the research methodically quantified the subjective perceptions of diverse stakeholders involved in project execution. Results reveal that labor-related issues—such as shortages, productivity, and skill deficits—along with managerial delays, particularly in decision-making and change orders, significantly contribute to cost escalations. The study’s novelty lies in its integration of fuzzy logic to defuzzify risk perceptions, providing a clear hierarchy of risk factors, which assists in the strategic prioritization of risk mitigation efforts. Additionally, it demonstrates a risk response plan considering the fuzzy-based risk assessment findings, which can serve as a hands-on tool guiding healthcare project practitioners to develop their risk management plans and monitor cost overrun risks throughout the execution phases of a project. The application of the research findings suggests policy implications for improved risk management frameworks toward the development of more-resilient and -efficient strategies for managing healthcare construction projects without prohibitive cost overruns.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

This study was conducted in accordance with the principles of research ethics. Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abdelgawad, M., and A. R. Fayek. 2010. “Risk management in the construction industry using combined fuzzy FMEA and Fuzzy AHP.” J. Constr. Eng. Manage. 136 (9): 1028–1036. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000210.
Abdellatif, H., and A. Alshibani. 2019. “Major factors causing delay in the delivery of manufacturing and building projects in Saudi Arabia.” Buildings 9 (4): 93. https://doi.org/10.3390/buildings9040093.
Aboshady, A. M., M. M. G. Elbarkouky, and M. Mohamed. 2013. “A fuzzy risk management framework for the Egyptian real estate development projects.” In Proc., AEI 2013: Building Solutions for Architectural Engineering Conf., 343–352. Reston, VA: ASCE.
Acerete, B., A. Stafford, and P. Stapleton. 2011. “Critical perspectives on accounting Spanish healthcare public private partnerships: The ‘Alzira model.’” Crit. Perspect. Account. 22 (6): 533–549. https://doi.org/10.1016/j.cpa.2011.06.004.
Al Mansoor, H. M., A. B. Alsaud, and H. Yas. 2021. “The impact of Covid 19 on increasing the cost of labor and project price in the United Arab Emirates.” Int. J. Pharm. Res. 13 (1). https://doi.org/10.31838/ijpr/2021.13.01.691.
Alnuaimi, A. S., R. A. Taha, M. Al Mohsin, and A. S. Al-Harthi. 2014. “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.” J. Constr. Eng. Manage. 136 (5): 615–622. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000154.
Ameyaw, E. E., A. P. C. Chan, D.-G. Owusu-Manu, and E. Coleman. 2015. “A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects.” J. Facil. Manage. 13 (1): 45–69. https://doi.org/10.1108/JFM-11-2013-0055.
Arif, F., S. H. Lodi, and N. Azhar. 2015. “Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality.” Int. J. Constr. Manage. 15 (1): 59–70. https://doi.org/10.1080/15623599.2015.1012141.
Asiedu, R. O., and C. Ameyaw. 2021. “A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries.” Int. J. Build. Pathol. Adapt. 39 (5): 831–851. https://doi.org/10.1108/IJBPA-05-2020-0043.
Assaf, S., M. A. Hassanain, and A. Abdallah. 2018. “Review and assessment of the causes of deficiencies in design documents for large construction projects.” Int. J. Build. Pathol. Adapt. 36 (3): 300–317. https://doi.org/10.1108/IJBPA-10-2017-0050.
Balali, A., R. C. Moehler, and A. Valipour. 2020. “Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: An Iranian case study.” Int. J. Constr. Manage. 22 (13): 2577–2585. https://doi.org/10.1080/15623599.2020.1811465.
Boran, F. E., S. Genç, M. Kurt, and D. Akay. 2009. “A multi-criteria intuitionistic fuzzy group decision making for supplier selection with TOPSIS method.” Expert Syst. Appl. 36 (8): 11363–11368. https://doi.org/10.1016/j.eswa.2009.03.039.
Bosch-Rekveldt, M., Y. Jongkind, H. Mooi, H. Bakker, and A. Verbraeck. 2011. “Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework.” Int. J. Project Manage. 29 (6): 728–739. https://doi.org/10.1016/j.ijproman.2010.07.008.
Carr, V., and J. H. M. Tah. 2001. “A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system.” Adv. Eng. Software 32 (10–11): 847–857. https://doi.org/10.1016/S0965-9978(01)00036-9.
Coffie, G. H., C. O. Aigbavboa, and W. D. Thwala. 2019. “Modelling construction completion cost in Ghana public sector building projects.” Asian J. Civ. Eng. 20 (7): 1063–1070. https://doi.org/10.1007/s42107-019-00165-7.
Dikmen, I., T. Birgonul, and M. Eybpoosh. 2011. “Tracing risk paths in international construction projects: A case study.” In Proc., MISBE2011—Int. Conf. Management and Innovation Sustainable Built Environment. Delft, Netherlands: Faculty of Architecture Real Estate and Housing.
Durdyev, S., S. Ismail, and N. Kandymov. 2018. “Structural equation model of the factors affecting construction labor productivity.” J. Constr. Eng. Manage. 144 (4): 04018007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001452.
Ebrahimnejad, S., S. M. Mousavi, R. Tavakkoli-Moghaddam, H. Hashemi, and B. Vahdani. 2012. “A novel two-phase group decision making approach for construction project selection in a fuzzy environment.” Appl. Math. Model. 36 (9): 4197–4217. https://doi.org/10.1016/j.apm.2011.11.050.
English, L. M. 2006. “Using public–private partnerships to achieve value for money in the delivery of healthcare in Australia.” Int. J. Public Pol. 1 (1/2): 91–121. https://doi.org/10.1504/IJPP.2005.007795.
Esmaeili, I., and H. Kashani. 2022. “Managing cost risks in oil and gas construction projects: Root causes of cost overruns.” ASCE-ASME J. Risk Uncertainty Eng. Syst. Part A Civ. Eng. 8 (1): 04021072. https://doi.org/10.1061/AJRUA6.0001193.
Fayek, A. R. 2020. “Fuzzy logic and fuzzy hybrid techniques for construction engineering and management.” J. Constr. Eng. Manage. 146 (7): 04020064. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001854.
Flyvbjerg, B., et al. 2018. “Five things you should know about cost overrun.” Transp. Res. Part A Policy Pract. 118 (Dec): 174–190. https://doi.org/10.1016/j.tra.2018.07.013.
Flyvbjerg, B., M. S. Holm, and S. Buhl. 2002. “Underestimating costs in public works: Error or lie?Am. Plan. Assoc. J. 68 (3): 279–295. https://doi.org/10.1080/01944360208976273.
Frimpong, Y., J. Oluwoye, and L. Crawford. 2003. “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” Int. J. Project Manage. 21 (5): 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8.
Gamil, Y., and I. Abdul Rahman. 2020. “Assessment of critical factors contributing to construction failure in Yemen.” Int. J. Constr. Manage. 20 (5): 429–436. https://doi.org/10.1080/15623599.2018.1484866.
Gunduz, M., and H. A. Elsherbeny. 2020. “Critical assessment of construction contract administration using fuzzy structural equation modeling.” Eng. Constr. Archit. Manage. 27 (6): 1233–1255. https://doi.org/10.1108/ECAM-05-2019-0246.
Harit, M., and L. Judson. 2023. “Mitigation strategies for delay factors in healthcare projects.” J. Build. Constr. 5 (1): 1–16. https://doi.org/10.5281/zenodo.7615101.
Hatmoko, J. U. D., and S. Scott. 2010. “Simulating the impact of supply chain management practice on the performance of medium-sized building projects.” Construct. Manage. Econ. 28 (1): 35–49. https://doi.org/10.1080/01446190903365632.
Islam, M. S., M. P. Nepal, and M. Skitmore. 2019. “Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects.” J. Constr. Eng. Manage. 145 (2): 04018126. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001593.
Islam, M. S., M. P. Nepal, M. Skitmore, and M. Attarzadeh. 2017. “Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects.” Adv. Eng. Inf. 33 (Aug): 112–131. https://doi.org/10.1016/j.aei.2017.06.001.
Islam, M. S., M. P. Nepal, M. Skitmore, and R. Drogemuller. 2021. “Risk induced contingency cost modeling for power plant projects.” Autom. Constr. 123 (Feb): 103519. https://doi.org/10.1016/j.autcon.2020.103519.
Islam, M. S., and B. T. Suhariadi. 2018. “Construction delays in privately funded large building projects in Bangladesh.” Asian J. Civ. Eng. 19 (4): 415–429. https://doi.org/10.1007/s42107-018-0034-3.
Islam, M. S., B. Trigunarsyah, and S. A. Assaf. 2015. “Causes of delay in construction projects in Bangladesh causes of delay in construction projects in Bangladesh.” In Proc., 6th Int. Conf. on Construction Engineering and Project Management. Busan, Korea: Korea Institute of Construction Engineering and Management.
Islam, M. S., and B. Trigunarsyah Suhariadi. 2017. “Construction delays in developing countries: A review.” KICEM J. Constr. Eng. Project Manage. 7 (1): 1–12. https://doi.org/10.6106/JCEPM.2017.3.30.001.
Jarkas, A. M., and C. G. Bitar. 2012. “Factors affecting construction labor productivity in Kuwait.” J. Constr. Eng. Manage. 138 (7): 811–820. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000501.
Jarkas, A. M., and J. H. Younes. 2015. “Principal factors contributing to construction delays in the State of Qatar.” Int. J. Constr. Project Manage. 6 (1): 41–62.
Johnson, R. M., and R. I. I. Babu. 2020. “Time and cost overruns in the UAE construction industry: A critical analysis.” Int. J. Constr. Manage. 20 (5): 402–411. https://doi.org/10.1080/15623599.2018.1484864.
Jung, J. H., D. Y. Kim, and H. K. Lee. 2015. “The computer-based contingency estimation through analysis cost overrun risk of public construction project.” KSCE J. Civ. Eng. 20 (May): 1119–1130. https://doi.org/10.1007/s12205-015-0184-8.
Kabir, G., R. Sadiq, and S. Tesfamariam. 2016. “A fuzzy Bayesian belief network for safety assessment of oil and gas pipelines.” Struct. Infrastruct. Eng. 2479 (Dec): 1–16. https://doi.org/10.1080/15732479.2015.1053093.
Kamaruddeen, A. M., C. F. Sung, and W. Wahi. 2020. “A study on factors causing cost overrun of construction projects in Sarawak, Malaysia.” Civ. Eng. Archit. 8 (3): 191–199. https://doi.org/10.13189/cea.2020.080301.
Kassem, M. A., M. A. Khoiry, and N. Hamzah. 2020. “Structural modelling of internal risk factors for oil and gas construction projects.” Int. J. Energy Sect. Manage. 14 (5): 975–1000. https://doi.org/10.1108/IJESM-11-2019-0022.
Khodeir, L. M., and A. H. M. Mohamed. 2015. “Identifying the latest risk probabilities affecting construction projects in Egypt according to political and economic variables. From January 2011 to January 2013.” HBRC J. 11 (1): 129–135. https://doi.org/10.1016/j.hbrcj.2014.03.007.
Kim, S., S. Chang, and D. Castro-Lacouture. 2020. “Dynamic modeling for analyzing impacts of skilled labor shortage on construction project management.” J. Manage. Eng. 36 (1): 1–13. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000720.
Kim, S. Y., K. N. Tuan, and V. T. Luu. 2016. “Delay factor analysis for hospital projects in Vietnam.” KSCE J. Civ. Eng. 20 (2): 519–529. https://doi.org/10.1007/s12205-015-0316-1.
Li, Y., and X. Wang. 2016. “Risk assessment for public–private partnership projects: Using a fuzzy analytic hierarchical process method and expert opinion in China.” J. Risk Res. 9877 (Apr): 1–22. https://doi.org/10.1080/13669877.2016.1264451.
Love, P., Z. Irani, J. Smith, M. Regan, and H. Liu. 2017. “Cost performance of public infrastructure projects: The nemesis and nirvana of change-orders.” Prod. Plan. Control 28 (13): 1081–1092. https://doi.org/10.1080/09537287.2017.1333647.
Mittal, Y. K., V. K. Paul, A. Rostami, M. Riley, and A. Sawhney. 2020. “Delay factors in construction of healthcare infrastructure projects: A comparison amongst developing countries.” Asian J. Civ. Eng. 21 (4): 649–661. https://doi.org/10.1007/s42107-020-00227-1.
Novak, V. 2012. “Reasoning about mathematical fuzzy logic and its future.” Fuzzy Sets Syst. 192 (Apr): 25–44. https://doi.org/10.1016/j.fss.2010.09.019.
Pham, H., T.-V. Luu, S.-Y. Kim, and D.-T. Vien. 2020. “Assessing the impact of cost overrun causes in transmission lines construction projects.” KSCE J. Civ. Eng. 24 (4): 1029–1036. https://doi.org/10.1007/s12205-020-1391-5.
PMBOK. 2017. A guide to the project management body of knowledge. 6th ed. Newtown Square, PA: Project Management Institute.
Safapour, E., and S. Kermanshachi. 2019. “Identifying early indicators of manageable rework causes and selecting mitigating best practices for construction.” J. Manage. Eng. 35 (2): 04018060. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000669.
Sami Ur Rehman, M., M. T. Shafiq, and M. Afzal. 2022. “Impact of COVID-19 on project performance in the UAE construction industry.” J. Eng. Des. Technol. 20 (1): 245–266. https://doi.org/10.1108/JEDT-12-2020-0481.
Shash, A. A., and F. M. AbuAlnaja. 2023. “Causes of material delays in capital projects in Saudi Arabia.” Int. J. Constr. Manage. 23 (7): 1109–1117. https://doi.org/10.1080/15623599.2021.1956294.
Taroun, A. 2014. “Towards a better modelling and assessment of construction risk: Insights from a literature review.” Int. J. Project Manage. 32 (1): 101–115. https://doi.org/10.1016/j.ijproman.2013.03.004.
Tavakkoli-Moghaddam, R., S. M. Mousavi, and H. Hashemi. 2011. “A fuzzy comprehensive approach for risk identification and prioritization simultaneously in EPC projects.” In Risk management in environment, production and economy, edited by Matteo Savino, 123–145. London: IntechOpen.
Vance, M. R. 2023. “Failure to improve healthcare project management: A qualitative study.” Ph.D. thesis, School of Business, Northcentral Univ.
Velasquez, M., and P. T. Hester. 2013. “An analysis of multi-criteria decision making methods an analysis of multi-criteria decision making methods.” Int. J. Oper. Res. 10 (2): 56–66.
Wang, Q., D. M. Kilgour, and K. W. Hipel. 2015. “Facilitating risky project negotiation: An integrated approach using fuzzy real options, multicriteria analysis, and conflict analysis.” Inf. Sci. 295 (Feb): 544–557. https://doi.org/10.1016/j.ins.2014.10.049.
Wang, Y.-M., and T. M. S. Elhag. 2007. “A fuzzy group decision making approach for bridge risk assessment.” Comput. Ind. Eng. 53 (1): 137–148. https://doi.org/10.1016/j.cie.2007.04.009.
Xu, Y., J. F. Y. Yeung, A. P. C. Chan, D. W. M. Chan, S. Q. Wang, and Y. Ke. 2010. “Developing a risk assessment model for PPP projects in China-A fuzzy synthetic evaluation approach.” Autom. Constr. 19 (7): 929–943. https://doi.org/10.1016/j.autcon.2010.06.006.
Zaqout, I. S., M. S. Islam, L. A. Hadidi, and M. Skitmore. 2022. “Modeling bidding decisions and bid markup size for construction projects: A fuzzy approach.” Eng. Appl. Artif. Intell. 113 (Feb): 104982. https://doi.org/10.1016/j.engappai.2022.104982.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 12December 2024

History

Received: Feb 2, 2024
Accepted: Jun 24, 2024
Published online: Sep 17, 2024
Published in print: Dec 1, 2024
Discussion open until: Feb 17, 2025

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Professor, Dept. of Civil and Environmental Engineering, Shahjalal Univ. of Science and Technology, Sylhet 3114, Bangladesh (corresponding author). ORCID: https://orcid.org/0000-0002-6414-1211. Email: [email protected]
Assistant Professor of Industrial Practice, Dept. of Civil Engineering, College of Engineering, Australian Univ. of Kuwait, West Mishrif, Safat 13015, Kuwait. ORCID: https://orcid.org/0000-0002-3562-5647. Email: [email protected]
Assistant Professor of Construction Management, Dept. of Civil Engineering, Faculty of Engineering at Mataria, Helwan Univ., Sherif St., Cairo 11795, Egypt. ORCID: https://orcid.org/0000-0002-7347-2012. Email: [email protected]
Assistant Professor of Construction Project Management, Dept. of Civil Engineering, Faculty of Engineering at Mataria, Helwan Univ., Sherif St., Cairo 11795, Egypt. ORCID: https://orcid.org/0009-0009-7308-5790. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share