Technical Papers
Jun 12, 2024

Strategic Workforce Planning for Production of Prefabricated Bathroom Units: An Advanced Markovian Approach

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 8

Abstract

Producing prefabricated bathroom units (PBUs) involves a dry installation method that heavily relies on human labor. Therefore, strategically accomplishing efficient and agile workforce planning emphasizes the critical significance. However, previous studies that address workforce planning often overlook the long-term stochastic effects and assume a homogeneous workforce for the sake of computational simplicity. To overcome these limitations, this study adopts the Markovian approach to establish an explicit relationship between workforce cost and cycle time, considering a heterogeneous workforce and uncertain human-caused events. The proposed model has a hierarchical structure that addresses the behavioral tendencies that drive task allocation at the individual level and the aggregate effect of manpower allocation at the operation level. By integrating Little’s law in queuing theory and metaheuristics optimization, the cycle time can be calculated while searching for the optimal workforce arrangement configuration. The study cross-validated the computational results with empirical data from a precast factory in Singapore and conducted a sensitivity analysis to verify the reliability. The results show that cross-training workers to multiple skills can lead to significant time savings, with a maximum of roughly 23 h saved in PBU cycle time. Ultimately, this research contributes to the body of knowledge by proposing a strategic workforce planning model that accounts for a heterogeneous workforce and uncertain human-caused events. It utilizes a partial cross-training configuration strategy to maximize productivity and flexibility for PBU production.

Practical Applications

The fit-out process of prefabricated bathroom units (PBUs) relies heavily on manual labor, becoming a bottleneck in the supply chain. Efficient and agile workforce planning is critical to overcome this challenge. However, planning for a large, heterogeneous workforce for tasks in an uncertain environment is difficult. Therefore, this research aims to establish a clear relationship between workforce cost and cycle time to assist with quick decision making during the planning stage. The proposed model has a two-level hierarchical structure that addresses individual-level behavioral tendencies and the operational-level aggregate effect of manpower allocation. This approach ensures optimal workforce size, composition, cost, and flexibility for the project’s needs. The model was tested using a real-world industrial case study, and the results showed that cross-training workers in multiple skills can significantly reduce PBU cycle time. The increased workforce flexibility is the main factor responsible for the time savings, with a maximum of roughly 23 h saved.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors would like to take this opportunity to thank the senior management of Soilbuild Construction Group Ltd. for their continued support on our research work.

References

Ahmadian Fard Fini, A., A. Akbarnezhad, T. H. Rashidi, and S. T. Waller. 2018. “Dynamic programming approach toward optimization of workforce planning decisions.” Rev. J. Constr. Eng. Manage. 144 (2): 04017113. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001434.
Ahn, S., L. Crouch, T. W. Kim, and R. Rameezdeen. 2020. “Comparison of worker safety risks between onsite and offsite construction methods: A site management perspective.” Rev. J. Constr. Eng. Manage. 146 (9): 05020010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001890.
Annear, L. M., R. Akhavan-Tabatabaei, and V. Schmid. 2023. “Dynamic assignment of a multi-skilled workforce in job shops: An approximate dynamic programming approach.” Rev. Eur. J. Oper. Res. 306 (3): 1109–1125. https://doi.org/10.1016/j.ejor.2022.08.049.
Arashpour, M., V. Kamat, Y. Bai, R. Wakefield, and B. Abbasi. 2018. “Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction.” Rev. Autom. Constr. 95 (Nov): 1–9. https://doi.org/10.1016/j.autcon.2018.07.027.
Arashpour, M., R. Wakefield, N. Blismas, and E. W. M. Lee. 2014. “Framework for improving workflow stability: Deployment of optimized capacity buffers in a synchronized construction production.” Rev. Can. J. Civ. Eng. 41 (12): 995–1004. https://doi.org/10.1139/cjce-2014-0199.
Arashpour, M., R. Wakefield, E. W. M. Lee, R. Chan, and M. R. Hosseini. 2016. “Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction.” Rev. Int. J. Project Manage. 34 (7): 1393–1402. https://doi.org/10.1016/j.ijproman.2016.02.004.
Assaad, R. H., I. H. El-adaway, M. Hastak, and K. LaScola Needy. 2022a. “The COVID-19 pandemic: A catalyst and accelerator for offsite construction technologies.” Rev. J. Manage. Eng. 38 (6): 04022062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001091.
Assaad, R. H., I. H. El-adaway, M. Hastak, and K. LaScola Needy. 2022b. “The impact of offsite construction on the workforce: Required skillset and prioritization of training needs.” Rev. J. Constr. Eng. Manage. 148 (7): 04022056. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002314.
Assaad, R. H., I. H. El-adaway, M. Hastak, and K. LaScola Needy. 2022c. “Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects.” Rev. J. Constr. Eng. Manage. 148 (7): 04022055. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002302.
Assaad, R. H., I. H. El-adaway, M. Hastak, and K. LaScola Needy. 2023. “Key factors affecting labor productivity in offsite construction projects.” Rev. J. Constr. Eng. Manage. 149 (1): 04022158. https://doi.org/10.1061/JCEMD4.COENG-12654.
Bányai, T., C. Landschützer, and Á. Bányai. 2018. “Markov-chain simulation-based analysis of human resource structure: How staff deployment and staffing affect sustainable human resource strategy.” Rev. Sustainability 10 (10): 3692. https://doi.org/10.3390/su10103692.
Barkokebas, R. D., M. Al-Hussein, and X. Li. 2022. “VR-MOCAP-enabled ergonomic risk assessment of workstation prototypes in offsite construction.” Rev. J. Constr. Eng. Manage. 148 (8): 04022064. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002319.
BCA (Building and Construction Authority). 2023. “Prefabricated bathroom unit.” Accessed April 30, 2023. https://www1.bca.gov.sg/buildsg/productivity/design-for-manufacturing-and-assembly-dfma/prefabricated-bathroom-unit.
Blum, C., and A. Roli. 2003. “Metaheuristics in combinatorial optimization: Overview and conceptual comparison.” Rev. ACM Comput. Surv. 35 (3): 268–308. https://doi.org/10.1145/937503.937505.
Bodur, M., and J. R. Luedtke. 2017. “Mixed-integer rounding enhanced benders decomposition for multiclass service-system staffing and scheduling with arrival rate uncertainty.” Rev. Manage. Sci. 63 (7): 2073–2091. https://doi.org/10.1287/mnsc.2016.2455.
Borba, B. S. M. C., M. Z. Fortes, L. A. Bitencourt, V. H. Ferreira, R. S. Maciel, M. A. R. Guimaraens, G. B. A. Lima, E. U. Barboza, H. O. Henriques, and N. C. R. Bergiante. 2019. “A review on optimization methods for workforce planning in electrical distribution utilities.” Rev. Comput. Ind. Eng. 135 (Sep): 286–298. https://doi.org/10.1016/j.cie.2019.06.002.
Boussaïd, I., J. Lepagnot, and P. Siarry. 2013. “A survey on optimization metaheuristics.” Rev. Inf. Sci. 237 (Jul): 82–117. https://doi.org/10.1016/j.ins.2013.02.041.
Cao, Y., M. Liu, B. Li, and T. Hong. 2021. “Scheduling method of mixed-flow assembly line based on complete kit of materials.” In Proc., IEEE Int. Conf. on Industrial Engineering and Engineering Management. New York: IEEE.
Costa, S., M. S. Carvalho, C. Pimentel, and C. Duarte. 2023. “A systematic literature review and conceptual framework of construction industrialization.” J. Constr. Eng. Manage. 149 (2): 03122013. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002410.
David, D., T. Widayanti, and M. Q. Khairuzzahman. 2019. “Performance comparison of cat swarm optimization and genetic algorithm on optimizing functions.” In Vol. 1 of Proc., 1st Int. Conf. on Cybernetics and Intelligent System, 163–169. New York: IEEE. https://doi.org/10.1109/ICORIS.2019.8874901.
De Bruecker, P., J. V. den Bergh, J. Beliën, and E. Demeulemeester. 2015. “Workforce planning incorporating skills: State of the art.” Eur. J. Oper. Res. 243 (1): 1–16. https://doi.org/10.1016/j.ejor.2014.10.038.
De Feyter, T. 2006. “Modelling heterogeneity in manpower planning: Dividing the personnel system into more homogeneous subgroups.” Appl. Stochastic Models Bus. Ind. 22 (4): 321–334. https://doi.org/10.1002/asmb.619.
De Feyter, T., and M. Guerry. 2011. “Markov models in manpower planning: A review.” In Mathematics research developments optimization theory: Decision analysis and applications, edited by J. Varela, and S. Acu�a, 67–88. New York: Nova Science Publishers.
Dimitriou, V. A., and N. Tsantas. 2010. “Evolution of a time dependent Markov model for training and recruitment decisions in manpower planning.” Linear Algebra Appl. 433 (11–12): 1950–1972. https://doi.org/10.1016/j.laa.2010.07.001.
Ezugwu, V. O., and S. Ologun. 2017. “Markov chain: A predictive model for manpower planning.” J. Appl. Sci. Environ. Manage. 21 (3): 557. https://doi.org/10.4314/jasem.v21i3.17.
Ginigaddara, B., S. Perera, Y. Feng, and P. Rahnamayiezekavat. 2022a. “An evaluation of offsite construction skill profiles.” J. Financ. Manage. Property Constr. 27 (1): 16–28. https://doi.org/10.1108/JFMPC-08-2020-0057.
Ginigaddara, B., S. Perera, Y. Feng, and P. Rahnamayiezekavat. 2022b. “Offsite construction skills evolution: An Australian case study.” Constr. Innov. 22 (1): 41–56. https://doi.org/10.1108/CI-10-2019-0109.
Glonegger, M., and G. Reinhart. 2015. “Planning of synchronized assembly lines taking into consideration human performance fluctuations.” Prod. Eng. 9 (2): 277–287. https://doi.org/10.1007/s11740-014-0595-2.
Gnanlet, A., and W. G. Gilland. 2014. “Impact of productivity on cross-training configurations and optimal staffing decisions in hospitals.” Eur. J. Oper. Res. 238 (1): 254–269. https://doi.org/10.1016/j.ejor.2014.03.033.
Gräßler, I., D. Roesmann, C. Cappello, and E. Steffen. 2021. “Skill-based worker assignment in a manual assembly line.” Procedia CIRP 100 (5): 433–438. https://doi.org/10.1016/j.procir.2021.05.100.
Hanna, A. S., G. Mikhail, and K. A. Iskandar. 2017. “State of prefab practice in the electrical construction industry: Qualitative assessment.” J. Constr. Eng. Manage. 143 (2): 04016097. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001236.
Hashemi-Petroodi, S. E., A. Dolgui, S. Kovalev, M. Y. Kovalyov, and S. Thevenin. 2021. “Workforce reconfiguration strategies in manufacturing systems: A state of the art.” Int. J. Prod. Res. 59 (22): 6721–6744. https://doi.org/10.1080/00207543.2020.1823028.
Jones, G. L., and Q. Qin. 2022. “Markov chain Monte Carlo in practice.” Annu. Rev. Stat. Appl. 9 (Mar): 557–578. https://doi.org/10.1146/annurev-statistics-040220-090158.
Marfuah, U., A. T. Panudju, and U. Mansyuri. 2023. “Dynamic programming approach in aggregate production planning model under uncertainty.” Int. J. Adv. Comput. Sci. Appl. 14 (3): 191–198. https://doi.org/10.14569/IJACSA.2023.0140321.
Market Research Intellect. 2023. “Prefabricated bathroom unit (PBU) market size and forecast.” Accessed May 23, 2023. https://www.marketresearchintellect.com/product/prefabricated-bathroom-unitpbu-market-size-and-forecast/.
Meng, X., Y. Liu, X. Gao, and H. Zhang. 2014. “A new bio-inspired algorithm: Chicken swarm optimization.” In Proc., 5th Int. Conf. of Advances in Swarm Intelligence. Cham, Switzerland: Springer.
Meng, X. B., X. Z. Gao, L. Lu, Y. Liu, and H. Zhang. 2016. “A new bio-inspired optimisation algorithm: Bird swarm algorithm.” J. Exp. Theor. Artif. Intell. 28 (4): 673–687. https://doi.org/10.1080/0952813X.2015.1042530.
Mirjalili, S., and A. Lewis. 2016. “The whale optimization algorithm.” Adv. Eng. Software 95 (May): 51–67. https://doi.org/10.1016/j.advengsoft.2016.01.008.
Mirjalili, S., S. M. Mirjalili, and A. Lewis. 2014. “Grey wolf optimizer.” Adv. Eng. Software 69 (Mar): 46–61. https://doi.org/10.1016/j.advengsoft.2013.12.007.
Mmereki, D., and D. Brouwer. 2022. “Application of innovative materials and methods in green buildings and associated occupational exposure and health of construction workers: A systematic literature review.” J. Constr. Eng. Manage. 148 (8): 04022068. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002296.
Nasirian, A., B. Abbasi, T. C. E. Cheng, and M. Arashpour. 2022. “Multiskilled workforce planning: A case from the construction industry.” J. Constr. Eng. Manage. 148 (5): 04022021. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002279.
Nasirian, A., M. Arashpour, and B. Abbasi. 2019a. “Critical literature review of labor multiskilling in construction.” J. Constr. Eng. Manage. 145 (1): 04018113. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001577.
Nasirian, A., M. Arashpour, B. Abbasi, E. K. Zavadskas, and A. Akbarnezhad. 2019b. “Skill set configuration in prefabricated construction: Hybrid optimization and multicriteria decision-making approach.” J. Constr. Eng. Manage. 145 (9): 04019050. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001677.
Nielsen, G. L., and A. R. Young. 1973. “Manpower planning: A Markov Chain application.” Public Personnel Manage. 2 (2): 133–144. https://doi.org/10.1177/009102607300200212.
Pan, M., Y. Yang, Z. Zheng, and W. Pan. 2022. “Artificial intelligence and robotics for prefabricated and modular construction: A systematic literature review.” J. Constr. Eng. Manage. 148 (9): 03122004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002324.
Piotrowski, A. P., M. J. Napiorkowski, J. J. Napiorkowski, and P. M. Rowinski. 2017. “Swarm intelligence and evolutionary algorithms: Performance versus speed.” Inf. Sci. 384 (Apr): 34–85. https://doi.org/10.1016/j.ins.2016.12.028.
Qin, R., and D. A. Nembhard. 2015. “Workforce agility in operations management.” Surv. Oper. Res. Manage. Sci. 20 (2): 55–69. https://doi.org/10.1016/j.sorms.2015.11.001.
Šeděnka, V., and Z. Raida. 2010. “Critical comparison of multi-objective optimization methods: Genetic algorithms versus swarm intelligence.” Radioengineering 19 (3): 369–377.
Setyaningrum, L., E. Abdurachman, H. L. H. S. Warnars, and J. Abraham. 2022. “Markov Chain method in calculation of personnel recruitment needs.” TEM J. 11 (4): 1724–1731. https://doi.org/10.18421/TEM114-38.
Shahbazi, B., A. Akbarnezhad, D. Rey, A. A. F. Fini, and M. Loosemore. 2019. “Optimization of job allocation in construction organizations to maximize workers’ career development opportunities.” J. Constr. Eng. Manage. 145 (6): 04019036. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001652.
Sing, M. C. P., P. E. D. Love, D. J. Edwards, and J. Liu. 2016. “Dynamic modeling of workforce planning for infrastructure projects.” J. Manage. Eng. 32 (6): 04016019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000463.
Tai, H. W., J. H. Chen, J. Y. Cheng, H. H. Wei, S. C. Hsu, and H. C. Liu. 2021. “Determining worker training time for precast component production in construction: Empirical study in Taiwan.” J. Constr. Eng. Manage. 147 (1): 05020023. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001964.
Valeva, S., M. Hewitt, and B. W. Thomas. 2017. “A matheuristic for workforce planning with employee learning and stochastic demand.” Int. J. Prod. Res. 55 (24): 7380–7397. https://doi.org/10.1080/00207543.2017.1349950.
Wolpert, D. H., and W. G. Macready. 1997. “No free lunch theorems for optimization.” Rev. IEEE Trans. Evol. Comput. 1 (1): 67–82. https://doi.org/10.1109/4235.585893.
Zanakis, S. H., and M. W. Maret. 1980. “A Markov chain application to manpower supply planning.” J. Oper. Res. Soc. 31 (12): 1095–1102. https://doi.org/10.1057/jors.1980.204.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 8August 2024

History

Received: Sep 11, 2023
Accepted: Jan 24, 2024
Published online: Jun 12, 2024
Published in print: Aug 1, 2024
Discussion open until: Nov 12, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, School of Civil and Environmental Engineering, Nanyang Technological Univ., 50 Nanyang Ave., Singapore 639798. ORCID: https://orcid.org/0009-0006-2517-0104. Email: [email protected]
Research Fellow, School of Civil and Environmental Engineering, Nanyang Technological Univ., Nanyang Ave., Singapore 639798 (corresponding author). ORCID: https://orcid.org/0000-0003-4114-9074. Email: [email protected]
Robert Lee Kong Tiong [email protected]
Associate Professor, School of Civil and Environmental Engineering, Nanyang Technological Univ., 50 Nanyang Ave., Singapore 639798. Email: [email protected]
Kan Wu
Professor, Dept. of Industrial and Business Management, Chang Gung Univ., 259 Wenhua Rd. 1, Guishan District, Taoyuan 33302, Taiwan.
Daryl Kok Hoong Chew
Innovation and Sustainability Lead, Soil Build Construction Group Ltd., 23 Defu South St. 1, Singapore 533847.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share