Work–Rest Schedule Optimization of Precast Production Considering Workers’ Overexertion

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 5

Abstract

The production process of precast components is labor-intensive, involving various manual tasks. The physically demanding tasks usually result in fatigue and overexertion of workers, leading to increased occupational health risks and reduced productivity. An appropriate work–rest strategy is recognized to effectively promote both workers’ health and productivity, while it has rarely been studied in the field of the construction industry. To narrow this gap, this study developed a mixed-integer linear programming approach to optimize the work–rest schedule by integrating workers’ overexertion. The objective is to maximize the productive time affected by the workers’ accumulative fatigue and recovery. Also, the optimized work–rest strategy can be highly customized by considering personalized factors and task characteristics. Experimenting with a case study compared the default rest schedule provided by the superintendent onsite with the optimal solution solved from the developed model. Results suggested that up to 20% improvement in productive time can be achieved, especially for the task with a relatively higher workload. Computational experiments were conducted to evaluate the sensitivity of total productive time to various personalized and task-specific factors. The proposed method provides superintendents with an applicable strategy to improve workers’ productivity and reduce their occupational risks resulting from overexertion. This study can promote the implementation of personalized occupational health management and support the improvement of regulations on the required rest with quantified evidence, thereby contributing to more reliable scheduling and sustainable workforce development for the construction industry. The research scope was limited to the precast production process, and further investigation on broader applications will be conducted.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abuwarda, Z., and T. Hegazy. 2016. “Work-package planning and schedule optimization for projects with evolving constraints.” J. Comput. Civ. Eng. 30 (6): 04016022. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000587.
Altuwaim, A., and K. El-Rayes. 2021. “Multiobjective optimization model for planning repetitive construction projects.” J. Constr. Eng. Manage. 147 (7): 04021072. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002072.
Botti, L., M. Calzavara, and C. Mora. 2021. “Modelling job rotation in manufacturing systems with aged workers.” Int. J. Prod. Res. 59 (8): 2522–2536. https://doi.org/10.1080/00207543.2020.1735659.
Burleson, R. C., C. T. Haas, R. L. Tucker, and A. Stanley. 1998. “Multiskilled labor utilization strategies in construction.” J. Constr. Eng. Manage. 124 (6): 480–489. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(480).
Cao, J. F., P. Zhao, and G. C. Liu. 2022. “Optimizing the production process of modular construction using an assembly line-integrated supermarket.” Autom. Constr. 142 (Oct): 104495. https://doi.org/ARTN10449510.1016/j.autcon.2022.104495.
Chan, A. P. C., W. Yi, D. P. Wong, M. C. H. Yam, and D. W. M. Chan. 2012. “Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment.” Build. Environ. 58 (Dec): 163–171. https://doi.org/10.1016/j.buildenv.2012.07.006.
Chen, W. C., and H. P. Tserng. 2022. “Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices.” Autom. Constr. 134 (Feb): 104051. https://doi.org/ARTN10405110.1016/j.autcon.2021.104051.
Christensen, H., K. Sogaard, M. Pilegaard, and H. B. O. Engineer. 2000. “The importance of the work/rest pattern as a risk factor in repetitive monotonous work.” Int. J. Ind. Ergon. 25 (4): 367–373. https://doi.org/10.1016/S0169-8141(99)00025-6.
Claessen, H., V. Arndt, C. Drath, and H. Brenner. 2009. “Overweight, obesity and risk of work disability: A cohort study of construction workers in Germany.” Occup. Environ. Med. 66 (6): 402–409. https://doi.org/10.1136/oem.2008.042440.
Clemen, R. T., and R. L. Winkler. 1985. “Limits for the precision and value of information from dependent sources.” Oper. Res. 33 (2): 427–442. https://doi.org/10.1287/opre.33.2.427.
Construction Industry Council. 2013. “Guidelines on site safety measures for working in hot weather.” Accessed April 1, 2013. https://www.cic.hk/cic_data/pdf/about_cic/publications/eng/V10_6_e_V00_Guidelines%20on%20Site%20Safety%20Measures%20for%20Working%20in%20Hot%20Weather.pdf.
Costa, B. R., and E. R. Vieira. 2010. “Risk factors for work-related musculoskeletal disorders: A systematic review of recent longitudinal studies.” Am. J. Ind. Med. 53 (3): 285–323. https://doi.org/10.1002/ajim.20750.
Dababneh, A. J., N. Swanson, and R. L. Shell. 2001. “Impact of added rest breaks on the productivity and well being of workers.” Ergonomics 44 (2): 164–174. https://doi.org/10.1080/00140130121538.
Duy-Khanh, H., K. Soo-Yong, and N. Van-Khoa. 2020. “An MCS-based model to qualify the relationship between workers experience and construction productivity.” In Proc., 2020 5th Int. Conf. on Green Technology and Sustainable Development (GTSD), 280–285. New York: IEEE.
Fan, X. T., D. B. Wang, Z. Tong, and X. J. Wang. 2023. “Investigation and analysis of the safety risk factors of aging construction workers.” Saf. Sci. 167 (Nov): 106281. https://doi.org/ARTN10628110.1016/j.ssci.2023.106281.
Finco, S., D. Battini, X. Delorme, A. Persona, and F. Sgarbossa. 2020. “Workers’ rest allowance and smoothing of the workload in assembly lines.” Int. J. Prod. Res. 58 (4): 1255–1270. https://doi.org/10.1080/00207543.2019.1616847.
Florez, L. 2017. “Crew allocation system for the masonry industry.” Comput.-Aided Civ. Infrastruct. Eng. 32 (10): 874–889. https://doi.org/10.1111/mice.12301.
Friswell, R., and A. Williamson. 2019. “Management of heavy truck driver queuing and waiting for loading and unloading at road transport customers’ depots.” Saf. Sci. 120 (Dec): 194–205. https://doi.org/10.1016/j.ssci.2019.06.039.
Gomar, J. E., C. T. Haas, and D. P. Morton. 2002. “Assignment and allocation optimization of partially multiskilled workforce.” J. Constr. Eng. Manage. 128 (2): 103–109. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(103).
Hegazy, T., D. A. Saad, and K. Mostafa. 2020. “Enhanced repetitive-scheduling computation and visualization.” J. Constr. Eng. Manage. 146 (10): 04020118. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001911.
Hou, L., C. X. Zhao, C. Z. Wu, S. Moon, and X. Y. Wang. 2016. “Discrete firefly algorithm for scaffolding construction scheduling.” J. Comput. Civ. Eng. 31 (3): 04016064. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000639.
Hsie, M., W. T. Hsiao, T. M. Cheng, and H. C. Chen. 2009. “A model used in creating a work-rest schedule for laborers.” Autom. Constr. 18 (6): 762–769. https://doi.org/10.1016/j.autcon.2009.02.010.
Hyun, H., I. Yoon, H. S. Lee, M. Park, and J. Lee. 2021. “Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance.” Autom. Constr. 125 (May): 103581. https://doi.org/ARTN10358110.1016/j.autcon.2021.103581.
Jackson, A. S., and R. M. Ross. 1996. “Methods and limitations of assessing functional work capacity objectively.” J. Back Musculoskeletal Rehabil. 6 (3): 265–276. https://doi.org/Doi10.3233/Bmr-1996-6307.
Johari, S., and K. N. Jha. 2020a. “How the aptitude of workers affects construction labor productivity.” J. Manage. Eng. 36 (5): 04020055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000826.
Johari, S., and K. N. Jha. 2020b. “Impact of work motivation on construction labor productivity.” J. Manage. Eng. 36 (5): 04020052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000824.
Kakarot, N., F. Mueller, and C. Bassarak. 2012. “Activity-rest schedules in physically demanding work and the variation of responses with age.” Ergonomics 55 (3): 282–294. https://doi.org/10.1080/00140139.2011.639906.
Kim, S., S. Chang, and D. Castro-Lacouture. 2019. “Dynamic modeling for analyzing impacts of skilled labor shortage on construction project management.” J. Manage. Eng. 36 (1): 04019035. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000720.
Kovalev, S., I. Chalamon, and S. E. Collignon. 2021. “Minimizing maximum job dependent ergonomic risk.” Int. J. Prod. Res. 59 (1): 95–101. https://doi.org/10.1080/00207543.2019.1694720.
Kuijer, P. P. F. M., B. Visser, and H. C. G. Kemper. 1999. “Job rotation as a factor in reducing physical workload at a refuse collecting department.” Ergonomics 42 (9): 1167–1178. https://doi.org/10.1080/001401399185054.
Lodree, E. J., C. D. Geiger, and X. C. Jiang. 2009. “Taxonomy for integrating scheduling theory and human factors: Review and research opportunities.” Int. J. Ind. Ergon. 39 (1): 39–51. https://doi.org/10.1016/j.ergon.2008.05.001.
Mao, C., Q. P. Shen, W. Pan, and K. H. Ye. 2013. “Major barriers to off-site construction: The developer’s perspective in China.” J. Manage. Eng. 31 (3): 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246.
Maxwell, N. S., P. C. Castle, and M. Spencer. 2008. “Effect of recovery intensity on peak power output and the development of heat strain during intermittent sprint exercise while under heat stress.” J. Sci. Med. Sport 11 (5): 491–499. https://doi.org/10.1016/j.jsams.2007.05.008.
Memarian, B., and P. Mitropoulos. 2013. “Accidents in masonry construction: The contribution of production activities to accidents, and the effect on different worker groups.” Saf. Sci. 59 (Nov): 179–186. https://doi.org/10.1016/j.ssci.2013.05.013.
Mokhtarzadeh, M., M. Rabbani, and N. Manavizadeh. 2021. “A novel two-stage framework for reducing ergonomic risks of a mixed-model parallel U-shaped assembly-line.” Appl. Math. Modell. 93 (May): 597–617. https://doi.org/10.1016/j.apm.2020.12.027.
Monghasemi, S., and M. Abdallah. 2021. “Linear optimization model to minimize total cost of repetitive construction projects and identify order of units.” J. Manage. Eng. 37 (4): 04021036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000936.
Namian, M., F. Taherpour, E. Ghiasvand, and Y. Turkan. 2021. “Insidious safety threat of fatigue: Investigating construction workers’ risk of accident due to fatigue.” J. Constr. Eng. Manage. 147 (12): 04021162. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002180.
Nasirian, A., B. Abbasi, T. C. E. Cheng, and M. Arashpour. 2022. “Multiskilled workforce planning: A case from the construction industry.” J. Constr. Eng. Manage. 148 (5): 04022021. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002279.
Nasirian, A., M. Arashpour, B. Abbasi, and A. Akbarnezhad. 2019. “Optimal work assignment to multiskilled resources in prefabricated construction.” J. Constr. Eng. Manage. 145 (4): 04019011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001627.
Peng, L., and A. H. S. Chan. 2020. “Adjusting work conditions to meet the declined health and functional capacity of older construction workers in Hong Kong.” Saf. Sci. 127 (Jul): 104711. https://doi.org/ARTN10471110.1016/j.ssci.2020.104711.
Tao, Y., H. Hu, F. Xu, and Z. P. Zhang. 2023. “Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory.” J. Constr. Eng. Manage. 149 (6): 04023034. https://doi.org/10.1061/JCEMD4.COENG-12821.
Tharmmaphornphilas, W., and B. A. Norman. 2004. “A quantitative method for determining proper job rotation intervals.” Ann. Oper. Res. 128 (Apr): 251–266. https://doi.org/10.1023/B:ANOR.0000019108.15750.ae.
Tiwari, P. S., and L. P. Gite. 2006. “Evaluation of work-rest schedules during operation of a rotary power tiller.” Int. J. Ind. Ergon. 36 (3): 203–210. https://doi.org/10.1016/j.ergon.2005.11.001.
Tomek, R. 2017. “Advantages of precast concrete in highway infrastructure construction.” Procedia Eng. 196 (Jan): 176–180. https://doi.org/10.1016/j.proeng.2017.07.188.
Wang, J. W., S. Han, and X. M. Li. 2021. “3D fuzzy ergonomic analysis for rapid workplace design and modification in construction.” Autom. Constr. 123 (Mar): 103521. https://doi.org/ARTN10352110.1016/j.autcon.2020.103521.
Wang, J. W., X. M. Li, S. Han, and M. Al-Hussein. 2023a. “3D standard motion time-based ergonomic risk analysis for workplace design in modular construction.” Autom. Constr. 147 (Mar): 104738. https://doi.org/ARTN10473810.1016/j.autcon.2022.104738.
Wang, L., Y. Q. Zhao, and X. F. Yin. 2023b. “Precast production scheduling in off-site construction: Mainstream contents and optimization perspective.” J. Cleaner Prod. 405 (Jun): 137054. https://doi.org/10.1016/j.jclepro.2023.137054.
Wang, Z. J., and H. Hu. 2017. “Improved precast production-scheduling model considering the whole supply chain.” J. Comput. Civ. Eng. 31 (4): 04017013. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000667.
Wang, Z. J., H. Hu, and J. Gong. 2018. “Modeling worker competence to advance precast production scheduling optimization.” J. Constr. Eng. Manage. 144 (11): 04018098. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001556.
Wu, H. C., and M. J. J. Wang. 2001. “Determining the maximum acceptable work duration for high-intensity work.” Eur. J. Appl. Physiol. 85 (3): 339–344. https://doi.org/10.1007/s004210100453.
Xu, S. L., and N. G. Hall. 2021. “Fatigue, personnel scheduling and operations: Review and research opportunities.” Eur. J. Oper. Res. 295 (3): 807–822. https://doi.org/10.1016/j.ejor.2021.03.036.
Yan, X. Z., H. Li, H. Zhang, and T. M. Rose. 2018. “Personalized method for self-management of trunk postural ergonomic hazards in construction rebar ironwork.” Adv. Eng. Inf. 37 (Aug): 31–41. https://doi.org/10.1016/j.aei.2018.04.013.
Yi, W., and A. P. C. Chan. 2013. “Optimizing work-rest schedule for construction rebar workers in hot and humid environment.” Build. Environ. 61 (Mar): 104–113. https://doi.org/10.1016/j.buildenv.2012.12.012.
Yi, W., and A. P. C. Chan. 2014. “Optimal work pattern for construction workers in hot weather: A case study in Hong Kong.” J. Comput. Civ. Eng. 29 (5): 05014009. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000419.
Yi, W., and S. Wang. 2017. “Mixed-integer linear programming on work-rest schedule design for construction sites in hot weather.” Comput.-Aided Civ. Infrastruct. Eng. 32 (5): 429–439. https://doi.org/10.1111/mice.12267.
Yi, W., and S. A. Wang. 2016. “Multi-objective mathematical programming approach to construction laborer assignment with equity consideration.” Comput.-Aided Civ. Infrastruct. Eng. 31 (12): 954–965. https://doi.org/10.1111/mice.12239.
Zeng, S. X., V. W. Y. Tam, and C. M. Tam. 2008. “Towards occupational health and safety systems in the construction industry of China.” Saf. Sci. 46 (8): 1155–1168. https://doi.org/10.1016/j.ssci.2007.08.005.
Zhang, M. Y., R. Shi, and Z. Yang. 2020. “A critical review of vision-based occupational health and safety monitoring of construction site workers.” Saf. Sci. 126 (Jun): 104658. https://doi.org/ARTN10465810.1016/j.ssci.2020.104658.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 5May 2024

History

Received: Aug 9, 2023
Accepted: Dec 19, 2023
Published online: Mar 11, 2024
Published in print: May 1, 2024
Discussion open until: Aug 11, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Graduate Research Assistant, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China. ORCID: https://orcid.org/0000-0002-8324-6967. Email: [email protected]
Professor, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China (corresponding author). ORCID: https://orcid.org/0000-0002-1103-0243. Email: [email protected]
Associate Professor, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China. ORCID: https://orcid.org/0000-0001-9704-5528. Email: [email protected]
Zhipeng Zhang, Ph.D. [email protected]
Assistant Professor, School of Naval Architecture, Ocean and Civil Engineering and State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, PR China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share