Identifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 1

Abstract

Due to the complex and dynamic atmosphere in the construction sector, different types of challenges are faced by project managers (PMs). These challenges potentially have negative impacts on the PM’s managerial performance, which mostly leads to budget and schedule contingencies. In this vein, scrutinizing the main challenges in a construction project and identifying the cause-and-effect relationships among these challenges is a crucially important process. In the literature, a considerable number of papers have tried to determine construction PM challenges, mainly using statistical methods. These methods do not consider the cause-and-effect relationship among variables. To enhance the existing methods, this paper applies social network analysis (SNA) principles in order to rank a group of variables based on cause-and-effect relationships. To demonstrate the proposed idea, a data set is constructed that includes different types of challenges acquired from the literature comprehended with the forward-chaining approach. In total, 49 critical challenges were identified and subsequently categorized into 12 groups. Two questionnaires were designed to assist in ranking the challenges. 108 construction experts and 20 panelists participated in this study, and the acquired data were used to evaluate the proposed SNA-based method. By applying the proposed method to the obtained data, a complex weighted and directed network is constructed and examined by three metrics: weighted in-degree centrality, betweenness centrality, and closeness centrality. The results revealed that poor planning, contractors’/subcontractors’ financial difficulties, and poor decision making are the main challenges that occur in the construction environment. Moreover, it was figured out that considering the cause-and-effect relationship among variables resulted in a highly different ranking of challenges, much closer to the real situation. This model could be used in quantitative-analytical research conducted in the construction project knowledge area in order to obtain more interpretable answers.

Practical Applications

Due to the complex and dynamic atmosphere in the construction sector, different types of challenges are faced by project managers (PMs). These challenges potentially have negative impacts on the PM’s managerial performance, which mostly lead to time and cost overruns. In this vein, scrutinizing the main challenges in a construction project and identifying the cause-and-effect relationships among these challenges is a crucially important process. In this research, comprehensive scientific efforts were made in order to rank the main PMs’ challenges in the construction sector, especially in developing countries. For this purpose, cause-and-effect relationships among variables were considered. By using different questionnaires as well as forming different focus groups and interviewing different experts, we found that the main top 10 challenges in the construction sector are: poor planning, contractors’/subcontractors’ financial difficulties, poor decision making, time pressure, rework, stressful atmosphere, design alteration (even after execution), workforce turnover, fluctuation rate and economic instability, and inappropriate and unrealistic scheduling.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abbasi, O., E. Noorzai, K. Gharouni Jafari, and M. Golabchi. 2020. “Exploring the causes of delays in construction industry using a cause-and-effect diagram: Case study for Iran.” J. Archit. Eng. 26 (3): 05020008. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431.
Abbasnejad, B., and H. Izadi Moud. 2013. “Construction delays in Iranian civil engineering projects: An approach to the financial security of construction business.” Life Sci. J. 10 (2): 2632–2637.
Abdul-Aziz, A. R., and S. S. Wong. 2011. “Business networks and internationalisation of contractors from developing countries.” Eng. Constr. Archit. Manage. 18 (3): 282–296. https://doi.org/10.1108/09699981111126188.
Abdul-Rahman, H., M. A. Berawi, A. R. Berawi, O. Mohamed, M. Othman, and I. A. Yahya. 2006. “Delay mitigation in the Malaysian construction industry.” J. Constr. Eng. Manage. 132 (2): 125–133. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125).
Adeyemi, A., and K. Masalila. 2016. “Delay factors and time-cost performance of construction projects in Gaborone City Council, Botswana.” J. Adv. Perform. Inf. Value 8 (1): 4. https://doi.org/10.37265/japiv.v8i1.46.
Akogbe, R. K. T., X. Feng, and J. Zhou. 2013. “Importance and ranking evaluation of delay factors for development construction projects in Benin.” KSCE J. Civ. Eng. 17 (6): 1213–1222. https://doi.org/10.1007/s12205-013-0446-2.
Alaghbari, W. E., M. R. A. Kadir, and A. Salim. 2007. “The significant factors causing delay of building construction projects in Malaysia.” Eng. Constr. Archit. Manage. 14 (2): 192–206. https://doi.org/10.1108/09699980710731308.
Al-Bayati, A. J. 2019. “Satisfying the need for diversity training for Hispanic construction workers and their supervisors at US construction workplaces: A case study.” J. Constr. Eng. Manage. 145 (6): 05019007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001663.
Alicandro, G., P. Bertuccio, G. Sebastiani, C. La Vecchia, and L. Frova. 2020. “Mortality among Italian male workers in the construction industry: A census-based cohort study.” Eur. J. Public Health 30 (2): 247–252. https://doi.org/10.1093/eurpub/ckz129.
Aljassmi, H., S. Han, and S. Davis. 2014. “Project pathogens network: New approach to analyzing construction-defects-generation mechanisms.” J. Constr. Eng. Manage. 140 (1): 04013028. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000774.
AlSehaimi, A., L. Koskela, and P. Tzortzopoulos. 2013. “Need for alternative research approaches in construction management: Case of delay studies.” J. Manage. Eng. 29 (4): 407–413. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148.
Amoah, A., J. Berbegal-Mirabent, and F. Marimon. 2021. “Making the management of a project successful: Case of construction projects in developing countries.” J. Constr. Eng. Manage. 147 (12): 04021166. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002196.
Asnaashari, E., A. Knight, A. Hurst, and S. S. Farahani. 2009. “Causes of construction delays in Iran: Project management, logistics, technology and environment.” In Proc., 25th Annual ARCOM Conf., 7–9. Nottingham, UK: Association of Researchers in Construction Management.
Assaf, S. A., and S. Al-Hejji. 2006. “Causes of delay in large construction projects.” Int. J. Project Manage. 24 (4): 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010.
Ayodele, O. A., A. Chang-Richards, and V. González. 2020. “Factors affecting workforce turnover in the construction sector: A systematic review.” J. Constr. Eng. Manage. 146 (2): 03119010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001725.
Aziz, R. F., and A. A. Abdel-Hakam. 2016. “Exploring delay causes of road construction projects in Egypt.” Alexandria Eng. J. 55 (2): 1515–1539. https://doi.org/10.1016/j.aej.2016.03.006.
Bagaya, O., and J. Song. 2016. “Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso.” J. Manage. Eng. 32 (5): 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443.
Banihashemi, S., M. R. Hosseini, H. Golizadeh, and S. Sankaran. 2017. “Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries.” Int. J. Project Manage. 35 (6): 1103–1119. https://doi.org/10.1016/j.ijproman.2017.01.014.
Bartlett, J. 2002. Managing programmes of business change: A handbook of the principles of programme management. Hook, UK: Project Manager Today Publications.
Bastian, M., S. Heymann, and M. Jacomy. 2009. “Gephi: An open source software for exploring and manipulating networks.” Proc., Int. AAAI Conf. on Web and Social Media 3 (1): 361–362. https://doi.org/10.1609/icwsm.v3i1.13937.
Beyea, S. C., and L. H. Nicoll. 2000. “Learn more using focus groups.” AORN J. 71 (4): 897–900. https://doi.org/10.1016/S0001-2092(06)62276-X.
Breakwell, G. M., S. E. Hammond, C. E. Fife-Schaw, and J. A. Smith. 2006. Research methods in psychology. Thousand Oaks, CA: SAGE.
Bresnen, M., A. Goussevskaia, and J. Swan. 2005. “Implementing change in construction project organizations: Exploring the interplay between structure and agency.” Build. Res. Inf. 33 (6): 547–560. https://doi.org/10.1080/09613210500288837.
Brookes, N. J., S. C. Morton, A. R. J. Dainty, and N. D. Burns. 2006. “Social processes, patterns and practices and project knowledge management: A theoretical framework and an empirical investigation.” Int. J. Project Manage. 24 (6): 474–482. https://doi.org/10.1016/j.ijproman.2006.03.005.
Campbell, F. 2006. Occupational stress in the construction industry survey. Ascot Berkshire, UK: The Chartered Institute of Building Survey.
Chinowsky, P., J. Diekmann, and V. Galotti. 2008. “Social network model of construction.” J. Constr. Eng. Manage. 134 (10): 804–812. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(804).
Chinowsky, P. S., J. Diekmann, and J. O’Brien. 2010. “Project organizations as social networks.” J. Constr. Eng. Manage. 136 (4): 452–458. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000161.
Chua, D. K. H., Y. Wang, and W. T. Tan. 2003. “Impacts of obstacles in East Asian cross-border construction.” J. Constr. Eng. Manage. 129 (2): 131–141. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(131).
Cicmil, S., T. Williams, J. Thomas, and D. Hodgson. 2006. “Rethinking project management: Researching the actuality of projects.” Int. J. Project Manage. 24 (8): 675–686. https://doi.org/10.1016/j.ijproman.2006.08.006.
Cohen, L., L. Manion, and K. Morrison. 2017. Research methods in education. London: Routledge.
Dadpour, M., E. Shakeri, and A. Nazari. 2019. “Analysis of stakeholder concerns at different times of construction projects using social network analysis (SNA).” Int. J. Civ. Eng. 17 (11): 1715–1727. https://doi.org/10.1007/s40999-019-00450-1.
Dawes, J. 2008. “Do data characteristics change according to the number of scale points used? An experiment using 5-point, 7-point and 10-point scales.” Int. J. Mark. Res. 50 (1): 61–104. https://doi.org/10.1177/147078530805000106.
Doloi, H., A. Sawhney, K. C. Iyer, and S. Rentala. 2012. “Analysing factors affecting delays in Indian construction projects.” Int. J. Project Manage. 30 (4): 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004.
Durdyev, S., M. Omarov, and S. Ismail. 2017. “Causes of delay in residential construction projects in Cambodia.” Cogent Eng. 4 (1): 1291117. https://doi.org/10.1080/23311916.2017.1291117.
Elawi, G. S. A., M. Algahtany, D. Kashiwagi, and K. Sullivan. 2015. “Major factors causing construction delays in Mecca.” J. Adv. Perform. Inf. Value 7 (1): 75. https://doi.org/10.37265/japiv.v7i1.55.
Fallahnejad, M. H. 2013. “Delay causes in Iran gas pipeline projects.” Int. J. Project Manage. 31 (1): 136–146. https://doi.org/10.1016/j.ijproman.2012.06.003.
Fang, C., F. Marle, E. Zio, and J. C. Bocquet. 2012. “Network theory-based analysis of risk interactions in large engineering projects.” Reliab. Eng. Syst. Saf. 106 (Aug): 1–10. https://doi.org/10.1016/j.ress.2012.04.005.
Frimpong, Y., J. Oluwoye, and L. Crawford. 2003. “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” Int. J. Project Manage. 21 (5): 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8.
Fugar, F. D., and A. B. Agyakwah-Baah. 2010. “Delays in building construction projects in Ghana.” Austr. J. Constr. Econ. Build. 10 (1–2): 128.
Gardezi, S. S. S., I. A. Manarvi, and S. J. S. Gardezi. 2014. “Time extension factors in construction industry of Pakistan.” Procedia Eng. 77 (May): 196–204. https://doi.org/10.1016/j.proeng.2014.07.022.
Ghoddousi, P., and M. R. Hosseini. 2012. “A survey of the factors affecting the productivity of construction projects in Iran.” Technol. Econ. Dev. Econ. 18 (1): 99–116. https://doi.org/10.3846/20294913.2012.661203.
Gorse, C. A., and S. Emmitt. 2007. “Communication behaviour during management and design team meetings: A comparison of group interaction.” Construct. Manage. Econ. 25 (11): 1197–1213. https://doi.org/10.1080/01446190701567413.
Gunduz, M., and M. H. AbuHassan,. 2016. “Causes of construction delays in Qatar construction projects.” Int. J. Civ. Environ. Struct. Constr. Archit. Eng. 10 (4): 516–521.
Haupt, T., and N. Harinarain. 2016. “The image of the construction industry and its employment attractiveness.” Acta Structilia 23 (2): 79–108.
Hellmund, A. J., K. G. Van Den Wymelenberg, and K. Baker. 2008. “Facing the challenges of integrated design and project delivery.” Energy Eng. 105 (6): 36–47. https://doi.org/10.1080/01998590809509396.
Heravi, G., and M. Mohammadian. 2021. “Investigating cost overruns and delay in urban construction projects in Iran.” Int. J. Constr. Manage. 21 (9): 958–968. https://doi.org/10.1080/15623599.2019.1601394.
Hewage, K. N., J. Y. Ruwanpura, and G. F. Jergeas. 2008. “IT usage in Alberta’s building construction projects: Current status and challenges.” Autom. Constr. 17 (8): 940–947. https://doi.org/10.1016/j.autcon.2008.03.002.
Hui, J. Y. B., H. Abdul-Rahman, and W. Chen. 2017. “Design change dynamics in building project: From literature review to a conceptual framework formulation.” J. Surv. Constr. Property 8 (1): 13–33. https://doi.org/10.22452/jscp.vol8no1.2.
Hwang, B. G., S. R. Thomas, C. T. Haas, and C. H. Caldas. 2009. “Measuring the impact of rework on construction cost performance.” J. Constr. Eng. Manage. 135 (3): 187–198. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187).
IMF (International Monetary Fund). 2023. “IMF Country Focus.” Accessed June 12, 2023. https://www.imf.org/en/News/country-focus.
Iranmanesh, M., S. A. Jalaee, and M. Zayanderodi. 2019. “Chaotic analysis and design of an early warning system for inflation in Iran Using Markov switching autoregressive approach.” Int. J. Contemp. Econ. Admin. Sci. 9 (2): 282–304. https://doi.org/10.5281/zenodo.3595944.
Isa, C. M. M., H. M. Saman, and C. N. Preece. 2015. “Determining significant factors influencing Malaysian construction business performance in international markets.” J. Constr. Dev. Countries 20 (2): 1.
Islam, M. S., and B. Trigunarsyah. 2017. “Construction delays in developing countries: A review.” J. Constr. Eng. Project Manage. 7 (1): 1–12. https://doi.org/10.6106/JCEPM.2017.3.30.001.
Ismail, A. M., and S. Varghese. 2019. “Analysis of employee turnover in construction industry in Kerala.” Int. Res. J. Eng. Technol. 6 (6): 647–651.
Jarkas, A. M. 2015. “Factors influencing labour productivity in Bahrain’s construction industry.” Int. J. Constr. Manage. 15 (1): 94–108. https://doi.org/10.1080/15623599.2015.1012143.
Jatarona, N. A., A. M. Yusof, S. Ismail, and C. C. Saar. 2016. “Public construction projects performance in Malaysia.” J. Southeast Asian Res. 2016 (Dec): 1–7. https://doi.org/10.5171/2016.940838.
Jebb, A. T., V. Ng, and L. Tay. 2021. “A review of key Likert scale development advances: 1995–2019.” Front. Psychol. 12 (Aug): 637547. https://doi.org/10.3389/fpsyg.2021.637547.
Kang, Y., Z. Jin, C. Hyun, and H. Park. 2018. “Construction management functions for developing countries: Case of Cambodia.” J. Manage. Eng. 34 (3): 05018004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000609.
Kasimu, A. M., and A. D. Isah. 2012. “Causes of delay in Nigeria construction industry.” Interdiscip. J. Contemp. Res. Bus. 4 (2): 785–794.
Khoshgoftar, M., A. H. A. Bakar, and O. Osman. 2010. “Causes of delays in Iranian construction projects.” Int. J. Constr. Manage. 10 (2): 53–69. https://doi.org/10.1080/15623599.2010.10773144.
Kim, S. Y., and K. N. Tuan. 2016. “Delay factor analysis for hospital projects in Vietnam.” KSCE J. Civ. Eng. 20 (2): 519–529. https://doi.org/10.1007/s12205-015-0316-1.
Kog, Y. C., and P. K. Loh. 2012. “Critical success factors for different components of construction projects.” J. Constr. Eng. Manage. 138 (4): 520–528. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000464.
Koushki, P. A., K. Al-Rashid, and N. Kartam. 2005. “Delays and cost increases in the construction of private residential projects in Kuwait.” Construct. Manage. Econ. 23 (3): 285–294. https://doi.org/10.1080/0144619042000326710.
Krueger, R. A. 2014. Focus groups: A practical guide for applied research. Thousand Oaks, CA: SAGE.
Kumar, A. 2012. “Major characteristics of developing countries.” Accessed June 12, 2023. http://web.uvic.ca/∼kumara/econ420/characteristics-dev.pdf.
Le-Hoai, L., Y. Dai Lee, and J. Y. Lee. 2008. “Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries.” KSCE J. Civ. Eng. 12 (6): 367–377. https://doi.org/10.1007/s12205-008-0367-7.
Leung, M. Y., and I. Y. S. Chan. 2012. “Exploring stressors of Hong Kong expatriate construction professionals in Mainland China: Focus group study.” J. Constr. Eng. Manage. 138 (1): 78–88. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000411.
Leung, M. Y., Y. S. Chan, and P. Olomolaiye. 2008. “Impact of stress on the performance of construction project managers.” J. Constr. Eng. Manage. 134 (8): 644–652. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:8(644).
Leung, M. Y., J. Yu, and Y. S. Chan. 2014. “Focus group study to explore critical factors of public engagement process for mega development projects.” J. Constr. Eng. Manage. 140 (3): 04013061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000815.
Liang, L., Z. Wang, and J. Li. 2019. “The effect of urbanization on environmental pollution in rapidly developing urban agglomerations.” J. Cleaner Prod. 237 (Jun): 117649. https://doi.org/10.1016/j.jclepro.2019.117649.
Liang, Q., M. Y. Leung, and C. Cooper. 2018. “Focus group study to explore critical factors for managing stress of construction workers.” J. Constr. Eng. Manage. 144 (5): 04018023. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001477.
Liao, S. S. 2007. “Top ten qualities of project manager Heroes: An interview with David B. Perini.” Leadersh. Manage. Eng. 7 (2): 50–60. https://doi.org/10.1061/(ASCE)1532-6748(2007)7:2(50).
Lin, S. C. 2015. “An analysis for construction engineering networks.” J. Constr. Eng. Manage. 141 (5): 04014096. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000956.
Ling, F. Y., and W. W. Khoo. 2016. “Improving relationships in project teams in Malaysia.” Built Environ. Project Asset Manage. 6 (3): 284–301. https://doi.org/10.1108/BEPAM-04-2015-0014.
Liu, L., C. Han, and W. Xu. 2015. “Evolutionary analysis of the collaboration networks within national quality award.” Int. J. Project Manage. 33 (3): 599–609. https://doi.org/10.1016/j.ijproman.2014.11.003.
Lo, T. Y., I. W. Fung, and K. C. Tung. 2006. “Construction delays in Hong Kong civil engineering projects.” J. Constr. Eng. Manage. 132 (6): 636–649. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636).
Long, N. D., S. Ogunlana, T. Quang, and K. C. Lam. 2004. “Large construction projects in developing countries: A case study from Vietnam.” Int. J. Project Manage. 22 (7): 553–561. https://doi.org/10.1016/j.ijproman.2004.03.004.
Loosemore, M. 1998. “Social network analysis: Using a quantitative tool within an interpretative context to explore the management of construction crises.” Eng. Constr. Archit. Manage. 5 (4): 315–326. https://doi.org/10.1108/eb021085.
Mahamid, I. 2013. “Contractors perspective toward factors affecting labor productivity in building construction.” Eng. Constr. Archit. Manage. 20 (5): 446–460. https://doi.org/10.1108/ECAM-08-2011-0074.
Makulsawatudom, A., and M. Emsley. 2003. “Factors affecting the productivity of the construction industry in Thailand: The foremen’s perception.” In Proc., Construction Research Congress: Wind of Change: Integration and Innovation, 1–10. Reston, VA: ASCE. https://doi.org/10.1061/40671(2003)6.
Mezher, T. M., and W. Tawil. 1998. “Causes of delays in the construction industry in Lebanon.” Eng. Constr. Archit. Manage. 5 (3): 252–260. https://doi.org/10.1108/eb021079.
Milosevic, D. Z., R. J. Martinelli, and J. M. Waddell. 2009. Program management for improved business results. New York: Wiley.
Mok, K. Y., G. Q. Shen, R. J. Yang, and C. Z. Li. 2017. “Investigating key challenges in major public engineering projects by a network-theory based analysis of stakeholder concerns: A case study.” Int. J. Project Manage. 35 (1): 78–94. https://doi.org/10.1016/j.ijproman.2016.10.017.
Moreno, J. L. 1934. Who shall survive? Foundations of sociometry, group psychotherapy, and sociodrama. Washington, DC: Nervous and Mental Disease Publishing.
Mpofu, B., E. G. Ochieng, C. Moobela, and A. Pretorius. 2017. “Profiling causative factors leading to construction project delays in the United Arab Emirates.” Eng. Constr. Archit. Manage. 24 (2): 346–376. https://doi.org/10.1108/ECAM-05-2015-0072.
Murray, T. J. 1979. “Delphi methodologies: A review and critique.” Urban Syst. 4 (2): 153–158. https://doi.org/10.1016/0147-8001(79)90013-5.
Niazi, G. A., and N. Painting. 2017. “Significant factors causing cost overruns in the construction industry in Afghanistan.” Procedia Eng. 182 (May): 510–517. https://doi.org/10.1016/j.proeng.2017.03.145.
Ning, X., J. Qi, C. Wu, and W. Wang. 2019. “Reducing noise pollution by planning construction site layout via a multi-objective optimization model.” J. Cleaner Prod. 222 (Aug): 218–230. https://doi.org/10.1016/j.jclepro.2019.03.018.
Nyoni, T., and W. G. Bonga. 2017. “Towards factors affecting delays in construction projects: A case of Zimbabwe.” Dyn. Res. J. J. Econ. Finance 2 (1): 12–28.
Odeh, A. M., and H. T. Battaineh. 2002. “Causes of construction delay: Traditional contracts.” Int. J. Project Manage. 20 (1): 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5.
Ofori, G. 2012. Contemporary issues in construction in developing countries. New York: Routledge.
Olawale, Y. A., and M. Sun. 2010. “Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice.” Construct. Manage. Econ. 28 (5): 509–526. https://doi.org/10.1080/01446191003674519.
Orangi, A., E. Palaneeswaran, and J. Wilson. 2011. “Exploring delays in Victoria-based Australian pipeline projects.” Procedia Eng. 14 (Jan): 874–881. https://doi.org/10.1016/j.proeng.2011.07.111.
Oshungade, O. O. 2016. “A comparative study of causes and effects of project delays and disruptions in construction projects in the South African construction industry: City of Johannesburg as a case study.” Doctoral dissertation, Faculty of Engineering and the Built Environment, Univ. of Johannesburg.
Othman, E., and A. Ahmed. 2013. “Challenges of mega construction projects in developing countries.” Organ. Technol. Manage. Constr. Int. J. 5 (1): 730–746. https://doi.org/10.5592/otmcj.2013.1.10.
Otte, E., and R. Rousseau. 2002. “Social network analysis: A powerful strategy, also for the information sciences.” J. Inf. Sci. 28 (6): 441–453. https://doi.org/10.1177/016555150202800601.
Parchami Jalal, M., E. Noorzai, and T. Yavari Roushan. 2019. “Root cause analysis of the most frequent claims in the building industry through the SCoP3E Ishikawa diagram.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (2): 04519004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000289.
Parikh, D., G. J. Joshi, and D. A. Patel. 2019. “Development of prediction models for claim cause analyses in highway projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519018. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000303.
PBOI (Planning and Budget Organization of Iran). 2020. “Approved annual civil and construction budget by Iran parliament.” Accessed March 3, 2020. https://irandataportal.syr.edu/annual-budgets.
Pollack, J., and P. Matous. 2019. “Testing the impact of targeted team building on project team communication using social network analysis.” Int. J. Project Manage. 37 (3): 473–484. https://doi.org/10.1016/j.ijproman.2019.02.005.
Pournader, M., A. A. Tabassi, and P. Baloh. 2015. “A three-step design science approach to develop a novel human resource-planning framework in projects: The cases of construction projects in USA, Europe, and Iran.” Int. J. Project Manage. 33 (2): 419–434. https://doi.org/10.1016/j.ijproman.2014.06.009.
Pourrostam, T., and A. Ismail. 2012. “Causes and effects of delay in Iranian construction projects.” Int. J. Eng. Technol. 4 (5): 598. https://doi.org/10.7763/IJET.2012.V4.441.
Priven, V., and R. Sacks. 2015. “Effects of the last planner system on social networks among construction trade crews.” J. Constr. Eng. Manage. 141 (6): 04015006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000975.
Pryke, S. 2017. Managing networks in project-based organisations. New York: Wiley Blackwell.
Pryke, S. D., G. Zagkli, and I. Kougia. 2011. “Resource provision ego-networks in small Greek construction firms.” Build. Res. Inf. 39 (6): 616–636. https://doi.org/10.1080/09613218.2011.628558.
Sambasivan, M., and Y. W. Soon. 2007. “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Manage. 25 (5): 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007.
Sanni-Anibire, M. O., R. Mohamad Zin, and S. O. Olatunji. 2022. “Causes of delay in the global construction industry: A meta analytical review.” Int. J. Constr. Manage. 22 (8): 1395–1407. https://doi.org/10.1080/15623599.2020.1716132.
Santoso, D. S., and S. Soeng. 2016. “Analyzing delays of road construction projects in Cambodia: Causes and effects.” J. Manage. Eng. 32 (6): 05016020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000467.
Sexton, M., and P. Barrett. 2004. “The role of technology transfer in innovation within small construction firms.” Eng. Constr. Archit. Manage. 11 (5): 342–348. https://doi.org/10.1108/09699980410558539.
Shehu, Z., and A. Akintoye. 2010. “Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis.” Int. J. Project Manage. 28 (1): 26–39. https://doi.org/10.1016/j.ijproman.2009.02.004.
Simmons, D. R., C. McCall, and N. A. Clegorne. 2020. “Leadership competencies for construction professionals as identified by construction industry executives.” J. Constr. Eng. Manage. 146 (9): 04020109. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001903.
Strong, D. M., Y. W. Lee, and R. Y. Wang. 1997. “Data quality in context.” Commun. ACM 40 (5): 103–110. https://doi.org/10.1145/253769.253804.
Suprun, E. V., and R. A. Stewart. 2015. “Construction innovation diffusion in the Russian Federation: Barriers, drivers and coping strategies.” Constr. Innovation 15 (3): 278–312. https://doi.org/10.1108/CI-07-2014-0038.
Sweis, G., R. Sweis, A. A. Hammad, and A. Shboul. 2008. “Delays in construction projects: The case of Jordan.” Int. J. Project Manage. 26 (6): 665–674. https://doi.org/10.1016/j.ijproman.2007.09.009.
Taofeeq, D. M., and A. Q. Adeleke. 2019. “Factor’s influencing contractors risk attitude in the Malaysian construction industry.” J. Constr. Bus. Manage. 3 (2): 59–67. https://doi.org/10.15641/jcbm.3.2.668.
Tatum, C. B. 2012. “Integrated construction engineering activities to satisfy challenging project objectives.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 139–148. Reston, VA: ASCE. https://doi.org/10.1061/9780784412329.015.
Toor, S. U. R., and S. O. Ogunlana. 2008. “Problems causing delays in major construction projects in Thailand.” Construct. Manage. Econ. 26 (4): 395–408. https://doi.org/10.1080/01446190801905406.
Tunji-Olayeni, P. F., A. O. Afolabi, E. I. Olowookere, O. I. Okpalamoka, and A. O. Oluwatobi. 2019. “Implications of occupational hazards on attainment of the Sustainable Development Goals in the Nigerian Construction Industry.” IOP Conf. Ser.: Mater. Sci. Eng. 640 (1): 012129. https://doi.org/10.1088/1757-899X/640/1/012129.
Wang, F., C. Tian, and W. Qin. 2020. “The impact of epidemic infectious diseases on the wellbeing of migrant workers: A systematic review.” Int. J. Wellbeing 10 (3): 7–25. https://doi.org/10.5502/ijw.v10i3.1301.
Weller, S. C., B. Vickers, H. R. Bernard, A. M. Blackburn, S. Borgatti, C. C. Gravlee, and J. C. Johnson. 2018. “Open-ended interview questions and saturation.” PLoS One 13 (6): e0198606. https://doi.org/10.1371/journal.pone.0198606.
Wong, K., and V. Vimonsatit. 2012. “A study of the factors affecting construction time in Western Australia.” Sci. Res. Essays 7 (40): 3390–3398. https://doi.org/10.5897/SRE12.138.
Wu, G., X. Zhao, J. Zuo, and G. Zillante. 2019. “Effects of team diversity on project performance in construction projects.” Eng. Constr. Archit. Manage. 26 (3): 408–423.
Yadollahi, M., M. Mirghasemi, R. Mohamad Zin, and B. Singh. 2014. “Architect critical challenges as a project manager in construction projects: A case study.” Adv. Civ. Eng. 2014 (Aug): 205310.
Yap, J. B. H., I. N. Chow, and K. Shavarebi. 2019. “Criticality of construction industry problems in developing countries: Analyzing Malaysian projects.” J. Manage. Eng. 35 (5): 04019020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000709.
Yap, J. B. H., and M. Skitmore. 2018. “Investigating design changes in Malaysian building projects.” Archit. Eng. Des. Manage. 14 (3): 218–238. https://doi.org/10.1080/17452007.2017.1384714.
Yitmen, I. 2007. “The challenge of change for innovation in construction: A North Cyprus perspective.” Build. Environ. 42 (3): 1319–1328. https://doi.org/10.1016/j.buildenv.2005.10.032.
Young, N. W. 2008. Key trends in the European and US construction marketplace. SmartMarket report. Design and construction intelligence. New York: McGraw Hill.
Yu, T., G. Q. Shen, Q. Shi, X. Lai, C. Z. Li, and K. Xu. 2017. “Managing social risks at the housing demolition stage of urban redevelopment projects: A stakeholder-oriented study using social network analysis.” Int. J. Project Manage. 35 (6): 925–941. https://doi.org/10.1016/j.ijproman.2017.04.004.
Zewdu, Z. T. 2016. “Construction projects delay and their antidotes: The case of Ethiopian construction sector.” Int. J. Bus. Econ. Res. 5 (4): 113–122. https://doi.org/10.11648/j.ijber.20160504.16.
Zhang, L., P. Fenn, and Y. Fu. 2019. “To insist or to concede? Contractors’ behavioural strategies when handling disputed claims.” Eng. Constr. Archit. Manage. 26 (3): 424–443. https://doi.org/10.1108/ECAM-05-2018-0219.
Zhang, X., L. Shen, and Y. Wu. 2011. “Green strategy for gaining competitive advantage in housing development: A China study.” J. Cleaner Prod. 19 (2–3): 157–167. https://doi.org/10.1016/j.jclepro.2010.08.005.
Zheng, X., Y. Le, A. P. Chan, Y. Hu, and Y. Li. 2016. “Review of the application of social network analysis (SNA) in construction project management research.” Int. J. Project Manage. 34 (7): 1214–1225. https://doi.org/10.1016/j.ijproman.2016.06.005.
Zidane, Y. J. T., and B. Andersen. 2018. “The top 10 universal delay factors in construction projects.” Int. J. Managing Projects Bus. 11 (3): 650–672. https://doi.org/10.1108/IJMPB-05-2017-0052.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 1January 2024

History

Received: Mar 16, 2023
Accepted: Sep 6, 2023
Published online: Oct 18, 2023
Published in print: Jan 1, 2024
Discussion open until: Mar 18, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Milad Aghililotf [email protected]
Ph.D. Candidate, School of Civil Engineering, College of Engineering, Univ. of Tehran, P.O. Box 11155-4563, Tehran, Iran. Email: [email protected]
Amir Mohammad Ramezanianpour [email protected]
Associate Professor, School of Civil Engineering, College of Engineering, Univ. of Tehran, P.O. Box 11155-4563, Tehran, Iran (corresponding author). Email: [email protected]
Hani Arbabi [email protected]
Assistant Professor, Faculty of Arts, Tarbiat Modares Univ., P.O. Box 14117-13116, Tehran, Iran. Email: [email protected]
Mojtaba Maghrebi [email protected]
Associate Professor, Dept. of Civil Engineering, Ferdowsi Univ. of Mashhad, Mashhad, Khorasan Razavi, P.O. Box 91779-48974, Iran. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share