Developing a Value–Risk Management Model for Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 1

Abstract

Value management (VM) and risk management (RM) both involve systematic team decision-making methodologies, but they are often used separately by construction professionals in real practices for different purposes. VM emphases the best project value, while RM is expected to minimize the project risks. The major difference between the two methodologies may lie in the function analysis phase of VM for identifying key functions of projects, and the risk analysis of RM for risk identification. Due to the complementary nature of the techniques involved in both forms of management, the integration of VM and RM has been advocated by scholars for about three decades to optimize the final outcome within limited time and resources. However, little attention has been paid to establishing the complex relationships between value-risk management (VRM) techniques and their outcomes. Therefore, this study aims to find an effective way to integrate VM and RM for enhancing final outcomes. A questionnaire survey was conducted to construction professionals with experience in VM and/or RM. Through various statistical analyses, including factor analysis, correlation, and multiple regression analysis, the findings indicate that (1) information and creativity techniques aided development techniques significantly; (2) presentation techniques are determined by information and function analysis techniques; (3) information techniques, risk analysis techniques, and development techniques enhance team and project performance in VRM workshops; and (4) function analysis techniques, risk analysis techniques, and development techniques can improve overall satisfaction on construction projects. To ensure risk minimization and value maximization in construction projects, VRM workshops should be harnessed and undertaken systematically and logically. Practical recommendations regarding sufficient information and discussion time for VRM participants are given to ensure stakeholders gain the comprehensive understanding of the peculiarity of the project at hand necessary to propel creative ideas and achieve the objectives of the workshop.

Practical Applications

In the real construction industry, it is time consuming and costly for project practitioners to conduct value management for enhancing project value and risk management to minimize impending risks separately. In this research, value management and risk management techniques were integrated in team decision-making process (value-risk management process) to help project practitioners make the best decisions with fewer risks logically for achieving the best project value. For enhancing final outcomes such as reducing project cost, facilitating team cooperation, and improving overall satisfaction, several practical recommendations are proposed for project practitioners to conduct the value-risk management process effectively: for example, allocating sufficient time for VRM practitioners to share and review information and identify possible risks, conducting function analysis training to the VRM practitioners, using risk analysis software during the VRM process, and requiring VRM practitioners work together to develop a comprehensive final report. The VRM participants need to use function analysis techniques to identify the key functions for value enhancement. The VRM workshop facilitator must be competent in all the techniques for applications on the project. In addition, the report should contain sufficient justifications such as calculations, possible cost-saving, advantages, and disadvantages of final ideas agreed upon by the VRM participants.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The work presented in this paper was fully supported by a grant from the City University of Hong Kong (Project No. CityU, 6000605).

References

Abdel-malak, F. F., U. H. Issa, Y. H. Miky, and E. A. Osman. 2017. “Applying decision-making techniques to civil engineering projects.” Beni-Suef Univ. J. Basic Appl. Sci. 6 (4): 326–331. https://doi.org/10.1016/j.bjbas.2017.05.004.
Abd Karim, S. B., M. A. Berawi, I. A. Yahya, H. Abdul-Rahman, and O. Mohamed. 2007. “The integration of value and risk management in infrastructure projects: Learning from others.” In Proc., Quantity Surveying Int. Conf., Kuala Lumpur, 1–13. Selangor, Malaysia: Royal Institution of Surveyors Malaysia.
Adams, F. K. 2008. “Construction contract risk management: A study of practices in the United Kingdom.” Cost Eng. 50 (1): 22–33.
Ahmed, A., B. Kayis, and S. Amornsawadwatana. 2007. “A review of techniques for risk management in projects.” Benchmarking: Int. J. 14 (1): 22–36. https://doi.org/10.1108/14635770710730919.
Akinwande, M. O., H. G. Dikko, and A. Samson. 2015. “Variance inflation factor: As a condition for the inclusion of suppressor variable (s) in regression analysis.” Open J. Stat. 5 (7): 754–767. https://doi.org/10.4236/ojs.2015.57075.
Alani, S. H. N. 2022. “Managing the corruption risk at the operation and maintenance stage in the construction projects in Iraq.” Innovative Infrastruct. Solutions 7 (1): 112. https://doi.org/10.1007/s41062-021-00710-x.
Australian Standard. 2006. Risk management set. AS/NZS 4360. Sydney: Standards Australia.
Australian Standard. 2007. Value management. AS 4183-2007. Sydney: Standards Australia.
Banaitienė, N., A. Banaitis, and A. Norkus. 2011. “Risk management in projects: Peculiarities of Lithuanian construction companies.” Int. J. Strategic Property Manage. 15 (1): 60–73. https://doi.org/10.3846/1648715X.2011.568675.
Bennett, K., and M. Mayouf. 2021. “Value management integration for whole life cycle: Post COVID-19 strategy for the UK construction industry.” Sustainability 13 (16): 9274. https://doi.org/10.3390/su13169274.
Bouckenooghe, D., M. Buelens, J. Fontaine, and K. Vanderheyden. 2005. “The prediction of stress by values and value conflict.” J. Psychol. 139 (4): 369–384. https://doi.org/10.3200/JRLP.139.4.369-384.
Bowen, P. A., K. S. Cattel, K. A. Hall, P. J. Edwards, and R. G. Pearl. 2002. “Perceptions of time, cost, and quality management on building projects.” Constr. Econ. Build. 2 (2): 48–56. https://doi.org/10.5130/AJCEB.v2i2.2900.
British Standard. 1991. Risk management definition. BS 4778. London: British Standard.
Calder, B. J., L. W. Phillips, and A. M. Tybout. 1982. “The concept of external validity.” J. Consum. Res. 9 (3): 240–244. https://doi.org/10.1086/208920.
Carr, V., and J. H. M. Tah. 2001. “A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system.” Adv. Eng. Software 32 (10–11): 847–857. https://doi.org/10.1016/S0965-9978(01)00036-9.
Cha, H. S., and J. T. O’Connor. 2005. “Optimizing implementation of value management processes for capital projects.” J. Constr. Eng. Manage. 131 (2): 239–251. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(239).
Chen, W. T., and S. L. Liao. 2010. “A job-plan based performance evaluation for construction value engineering study.” J. Chin. Inst. Eng. 33 (2): 317–333. https://doi.org/10.1080/02533839.2010.9671620.
Cho, K., T. Hong, and C. Hyun. 2009. “Effect of project characteristics on project performance in construction projects based on structural equation model.” Expert Syst. Appl. 36 (7): 10461–10470. https://doi.org/10.1016/j.eswa.2009.01.032.
Clifford, B. 2006. “Improvement through cooperation-Integrating partnering, value management, and risk management.” In Proc., Int. Conf. on Value Engineering and Management, 1–8. Hong Kong: Hong Kong Polytechnic Univ.
Coetzee, C. E. 2009. “Value management in the construction industry: What does it entails and is it a worthwhile practice?” An unpublished B.Sc. thesis, Faculty of Engineering, Built Environment and Information Technology, Univ. of Pretoria.
Đaković, M. 2019. “Systematic risk management model in the project initiation phase.” An unpublished Ph.D. thesis, Faculty of Technical Sciences, Univ. of Novi Sad, Serbia.
del Caño, A., and M. P. de la Cruz. 2002. “Integrated methodology for project risk management.” J. Constr. Eng. Manage. 128 (6): 473–485. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(473).
Dell’Isola, A. J. 1997. Value engineering: Practical applications for design, construction, maintenance and operations. Kingston, MA: RS Means Company.
Edwards, W. 1954. “The theory of decision making.” Psychol. Bull. 51 (4): 380–417.
Ellis, R. C., G. D. Wood, and D. A. Keel. 2005. “Value management practices of leading UK cost consultants.” Constr. Manage. Econ. 23 (5): 483–493. https://doi.org/10.1080/01446190500040711.
El-Motasem, S. M. 2010. “Integrating value engineering and facility management as an approach to face risks.” An unpublished M.Sc. thesis, Dept. of Architecture, Ain-Shaims Univ.
El-Nashar, W. Y. 2017. “Effect of drains coverings on environment by using value engineering.” Alexandria Eng. J. 56 (3): 327–332. https://doi.org/10.1016/j.aej.2017.05.013.
El-Nashar, W. Y., and A. H. Elyamany. 2018. “Value engineering for canal tail irrigation water problem.” Ain Shams Eng. J. 9 (4): 1989–1997. https://doi.org/10.1016/j.asej.2017.02.004.
Enshassi, M. S., S. Walbridge, J. S. West, and C. T. Haas. 2019. “Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects.” J. Manage. Eng. 35 (4): 05019004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698.
ETWB (Environment, Transport, and Works Bureau). 2002. Implementation of value management in public works projects. Environment, Transport, and Works Bureau Technical Circular (Works) No. 35/2002. Hong Kong: ETWB.
Falessi, D., G. Cantone, R. Kazman, and P. Kruchten. 2011. “Decision-making techniques for software architecture design: A comparative survey.” ACM Comput. Surv. 43 (4): 1–28. https://doi.org/10.1145/1978802.1978812.
Feili, H. R., S. Nasiri, and N. Akar. 2012. “Integrating risk management and value engineering in the development of renewable energy project.” In Proc., Symp. of Advances in Science and Technology, 1–10. Kaula Lump, Malaysia.
Flanagan, R. 1993. Risk management and construction. Oxford: Blackwell Science.
Gardiner, P. D., and K. Stewart. 2000. “Revisiting the golden triangle of cost, time, and quality: The role of NPV in project control, success, and failure.” Int. J. Project Manage. 18 (4): 251–256. https://doi.org/10.1016/S0263-7863(99)00022-8.
Gharabagh, M. J., H. Asilian, S. B. Mortasavi, A. Z. Mogaddam, E. Hajizadeh, and A. Khavanin. 2009. “Comprehensive risk assessment and management of petrochemical feed and product transportation pipelines.” J. Loss Prev. Process Ind. 22 (4): 533–539. https://doi.org/10.1016/j.jlp.2009.03.008.
Goh, C. S., H. Abdul-Rahman, and Z. Abdul Samad. 2013. “Applying risk management workshop for a public construction project: Case study.” J. Constr. Eng. Manage. 139 (5): 572–580. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000599.
Hair, J. F. J., R. E. Anderson, R. L. Tatham, and W. C. Black. 1998. Multivariate data analysis. 5th ed. Englewood Cliffs, NJ: Prentice-Hall.
Hamid, S. H. A., R. Takim, and A. H. Nawawi. 2011. “An integrated value management (IVM) for construction projects in Malaysia.” In Proc., IEEE Symp. on Business, Engineering and Industrial Applications, 421–425. New York: IEEE.
Hauke, J., and T. Kossowski. 2011. “Comparison of values of Pearson’s and Spearman’s correlation coefficients on the same sets of data.” Quaestiones Geographicae 30 (2): 87–93. https://doi.org/10.2478/v10117-011-0021-1.
Hunter, D. 2009. The art of facilitation: The essentials for leading great meetings and creating group synergy. San Francisco: Jossey-Bass.
Iqbal, S., R. M. Choudhry, K. Holschemacher, A. Ali, and J. Tamošaitienė. 2015. “Risk management in construction projects.” Technol. Econ. Dev. Econ. 21 (1): 65–78. https://doi.org/10.3846/20294913.2014.994582.
Issah, T. 2017. “Exploring the level of acceptability and implementation of value engineering in the Ghanaian construction industry: A case study of Tamale metropolis.” An unpublished M.Sc. thesis, College of Art and Built Environment, Kwame Nkrumah Univ. of Science and Technology.
Jia, G., X. Ni, Z. Chen, B. Hong, Y. Chen, F. Yang, and C. Lin. 2013. “Measuring the maturity of risk management in large-scale construction projects.” Autom. Constr. 34 (Sep): 56–66. https://doi.org/10.1016/j.autcon.2012.10.015.
Kaiser, H. F. 1958. “The varimax criterion for analytic rotation in factor analysis.” Psychometrika 23 (3): 187–200. https://doi.org/10.1007/BF02289233.
Kelly, J., S. Male, and D. Graham. 2004. Value management of construction projects. Oxford, UK: Blackwell.
Khan, J. 2015. “Development of a structured approach using value management methodology to reduce project cost overruns at SESL.” J. Assoc. Prof. Eng. Trinidad Tobago 43 (1): 41–47.
Kineber, A. F., I. Othman, A. E. Oke, N. Chileshe, and M. K. Buniya. 2021. “Impact of value management on building projects success: structural equation modeling approach.” J. Constr. Eng. Manage. 147 (4): 04021011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002026.
Kluckhohn, C. 1959. “Values and value-orientations in the theory of action.” In Toward a general theory of action, edited by T. Parsons, and E. A. Shils, 388–433. Cambridge, MA: Harvard University Press.
Krechowicz, M. 2020. “Comprehensive risk management in horizontal directional drilling projects.” J. Constr. Eng. Manage. 146 (5): 04020034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001809.
Kwak, Y. H., and J. Stoddard. 2004. “Project risk management: Lessons learned from software development environment.” Technovation 24 (11): 915–920. https://doi.org/10.1016/S0166-4972(03)00033-6.
Lajili, K., and D. Zéghal. 2005. “A content analysis of risk management disclosures in Canadian annual reports.” Can. J. Admin. Sci. 22 (2): 125–142. https://doi.org/10.1111/j.1936-4490.2005.tb00714.x.
Lau, E., and S. Rowlinson. 2011. “The implications of trust in relationships in managing construction projects.” Int. J. Managing Project Bus. 4 (4): 633–659. https://doi.org/10.1108/17538371111164056.
Leung, M. Y. 2001. “Value management in construction projects.” An unpublished Ph.D. thesis, Faculty of Architecture, Univ. of Hong Kong.
Leung, M. Y., S. T. Ng, and S. O. Cheung. 2002. “Improving satisfaction through conflict stimulation and resolution in value management in construction projects.” J. Manage. Eng. 18 (2): 68–75. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(68).
Leung, M. Y., S. T. Ng, and S. O. Cheung. 2004. “Measuring construction project participant satisfaction.” Constr. Manage. Econ. 22 (3): 319–331. https://doi.org/10.1080/01446190320000000000.
Leung, M. Y., L. D. Ojo, and X. Y. Wei. 2021. “Exploring the impact of Covid-19 pandemic on the construction industry: Quantity surveyors’ perspective.” In Proc., 24th Annual Pacific Association of Quantity Surveyors Congress, 1–10. Selangor, Malaysia: Pacific Association of Quantity Surveyors.
Leung, M. Y., and P. Olomolaiye. 2010. “Risk and construction stakeholder management.” In Construction stakeholder management, 75–98. Chichester, UK: Wiley.
Leung, M. Y., X. Wei, and C. Wang. 2023. “Demystifying critical success factors for applying value management in construction projects along the belt and road regions: Focus group study.” J. Constr. Eng. Manage. 149 (8): 04023066. https://doi.org/10.1061/JCEMD4.COENG-12990.
Leung, M. Y., and J. Yu. 2014. “Value methodology in public engagement for construction development project.” Built Environ. Project Asset Manage. 4 (1): 55–70. https://doi.org/10.1108/BEPAM-05-2012-0033.
Leung, M. Y., J. Yu, and Q. Liang. 2014. “Analysis of the relationships between value management techniques, conflict management, and workshop satisfaction of construction participants.” J. Manage. Eng. 30 (3): 04014004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000208.
Lim, B. V., K. Kan, and A. Wong. 2005. Practitioners’ guide to design and implementation of participatory projects. Hong Kong: The Chinese Univ. of Hong Kong.
Lin, X., A. N. Mazlan, and S. Ismail. 2022. “Barriers to the implementation of value management in small construction projects.” J. Build. Eng. 54 (Aug): 104639. https://doi.org/10.1016/j.jobe.2022.104639.
Liu, A. M., and M. Y. Leung. 2002. “Developing a soft value management model.” Int. J. Project Manage. 20 (5): 341–349. https://doi.org/10.1016/S0263-7863(01)00023-0.
Lyytimäki, J., T. Assmuth, and M. Hildén. 2011. “Unrecognized, concealed, or forgotten–the case of absent information in risk communication.” J. Risk Res. 14 (6): 757–773. https://doi.org/10.1080/13669877.2011.571773.
Mahendra, P. A., J. R. Pitroda, and J. J. Bhavsar. 2013. “A study of risk management techniques for construction projects in developing countries.” Int. J. Innovative Technol. Exploring Eng. 3 (5): 139–142.
Male, S., J. Kelly, S. Fernie, M. Gronqvist, and G. Bowles. 1998. Value management: The value management benchmark: A good practice framework for clients and practitioners. London: Thomas Telford.
Manu, P. A., N. A. Ankrah, D. G. Proverbs, and S. Suresh. 2012. “Investigating the multi-causal and complex nature of the accident causal influence of construction project features.” Accid. Anal. Prev. 48 (Sep): 126–133. https://doi.org/10.1016/j.aap.2011.05.008.
Markmann, C., I. L. Darkow, and H. Von Der Gracht. 2013. “A Delphi-based risk analysis—Identifying and assessing future challenges for supply chain security in a multi-stakeholder environment.” Technol. Forecast. Soc. Change 80 (9): 1815–1833. https://doi.org/10.1016/j.techfore.2012.10.019.
Matthews, R., and J. McLees. 2015. “Building effective projects teams and teamwork.” J. Inf. Technol. Econ. Dev. 6 (2): 20–30.
Maxwell, S. E. 2000. “Sample size and multiple regression analysis.” Psychol. Methods 5 (4): 434–458. https://doi.org/10.1037/1082-989X.5.4.434.
Mootanah, D. P. 1998. “Developing an integrated risk and value management framework for construction project management.” In Proc., 14th Annual Conf. of the Association of Research in Construction Management, 448–457. Reading, UK: Reading Univ.
Ning, X., J. Qi, and C. Wu. 2018. “A quantitative safety risk assessment model for construction site layout planning.” Saf. Sci. 104 (Apr): 246–259. https://doi.org/10.1016/j.ssci.2018.01.016.
OGC (Office of Government Commerce). 2007. Achieving excellence in construction, 1–24. London: OGC.
Oke, A. E., and C. O. Aigbavboa. 2017. Sustainable value management for construction projects. Cham, Switzerland: Springer.
Paliokostas, G. P. 2000. “The integration of value management and risk management.” An unpublished M.Sc. thesis, Dept. of Civil and Construction Engineering, Univ. of Manchester Institute of Science and Technology.
Pallant, J. 2020. SPSS survival manual: A step-by-step guide to data analysis using IBM SPSS. 7th ed. New York: Routledge.
Qazi, A., A. Shamayleh, S. El-Sayegh, and S. Formaneck. 2021. “Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo Simulation approach.” Sustainable Cities Soc. 65 (Feb): 102576. https://doi.org/10.1016/j.scs.2020.102576.
Rachwan, R., I. Abotaleb, and M. Elgazouli. 2016. “The influence of value engineering and sustainability considerations on the project value.” Procedia Environ. Sci. 34 (Jan): 431–438. https://doi.org/10.1016/j.proenv.2016.04.038.
Ranesh, A., G. Zillante, and N. Chileshe. 2012. “Towards the integration of risk and value management.” Aust. J. Constr. Econ. Build. Conf. Ser. 1 (2): 43–51. https://doi.org/10.5130/ajceb-cs.v1i2.3165.
SAVE International. 2007. “Value standard and body of knowledge.” Accessed November 12, 2019. https://www.value-eng.org/page/ValueStandards.
SAVE International. 2015. “Value methodology standard.” Accessed November 12, 2019. https://www.scribd.com/document/391499514/vmstd-2-pdf.
Skorupka, D. 2008. “Identification and initial risk assessment of construction projects in Poland.” J. Manage. Eng. 24 (3): 120–127. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:3(120).
Smith, N. J. 2002. Engineering project management. 2nd ed. Oxford, UK: Blackwell Publishing.
Snee, R. D. 1977. “Validation of regression models: methods and examples.” Technometrics 19 (4): 415–428. https://doi.org/10.1080/00401706.1977.10489581.
Spaulding, W. M., A. Bridge, and M. Skitmore. 2005. “The use of function analysis as the basis of value management in the Australian construction industry.” Constr. Manage. Econ. 23 (7): 723–731. https://doi.org/10.1080/01446190500040679.
Steckler, A., and K. R. McLeroy. 2008. “The importance of external validity.” Am. J. Public Health 98 (1): 9–10. https://doi.org/10.2105/AJPH.2007.126847.
Szymański, P. 2017. “Risk management in construction projects.” Procedia Eng. 208 (Jan): 174–182. https://doi.org/10.1016/j.proeng.2017.11.036.
Tadayon, M., M. Jaafar, and E. Nasri. 2012. “An assessment of risk identification in large construction projects in Iran.” J. Constr. Dev. Countries 17 (1): 57–69.
Tarka, P. 2018. “An overview of structural equation modeling: Its beginnings, historical development, usefulness, and controversies in the social sciences.” Qual. Quant. 52 (1): 313–354. https://doi.org/10.1007/s11135-017-0469-8.
Tarricone, P., and J. Luca. 2002. “Successful teamwork: A case study.” In Proc., 25th HERDSA Annual Conf., 640–646. Hammondville, NSW, Australia: HERDSA.
Tokdemir, O. B., H. Erol, and I. Dikmen. 2019. “Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation.” J. Constr. Eng. Manage. 145 (2): 04018132. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001595.
Tripathi, K. K., and K. N. Jha. 2018. “Determining success factors for a construction organization: A structural equation modeling approach.” J. Manage. Eng. 34 (1): 04017050. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000569.
Tummala, R., and T. Schoenherr. 2011. “Assessing and managing risks using the supply chain risk management process (SCRMP).” Supply Chain Manage. Int. J. 16 (6): 474–483. https://doi.org/10.1108/13598541111171165.
Vagias, W. M. 2006. Likert-type scale response anchors. Clemson, SC: Clemson International Institute for Tourism & Research Development, Dept. of Parks, Recreation and Tourism Management. Clemson Univ.
Walker, A. 1996. Project management in construction. West Sussex, UK: Blackwell Science Ltd.
Wao, J. 2013. “Teamwork in construction value engineering.” Accessed July 3, 2015. https://www.researchgate.net/publication/279533359_Teamwork_in_Construction_Value_Engineering#fullTextFileContent.
Ward, S., and C. Chapman. 2003. “Transforming project risk management into project uncertainty management.” Int. J. Project Manage. 21 (2): 97–105. https://doi.org/10.1016/S0263-7863(01)00080-1.
Yeung, J. F., A. P. Chan, and D. W. Chan. 2009. “A computerized model for measuring and benchmarking the partnering performance of construction projects.” Autom. Constr. 18 (8): 1099–1113. https://doi.org/10.1016/j.autcon.2009.07.003.
Yong, A. G., and S. Pearce. 2013. “A beginner’s guide to factor analysis: focusing on exploratory factor analysis.” Tutorials Quant. Methods Psychol. 9 (2): 79–94. https://doi.org/10.20982/tqmp.09.2.p079.
Yu, J. 2013. “Public engagement via value methodology for construction projects.” An unpublished doctoral thesis, Dept. of Architecture and Civil Engineering, College of Engineering, City Univ. of Hong Kong.
Yu, J., and M. Y. Leung. 2018. “Structural stakeholder model in public engagement for construction development projects.” J. Constr. Eng. Manage. 144 (6): 04018046. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001462.
Yu, J., G. Ma, and X. Jiang. 2017. “Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents.” Eng. Constr. Archit. Manage. 24 (6): 1170–1183. https://doi.org/10.1108/ECAM-08-2016-0187.
Zetha, H. R., M. A. Berawi, and A. Dofir. 2012. “Application of value engineering at public private partnership project to improve quality of feasibility study (Case study: Airport railway in Indonesia).” In Proc., Int. Conf. on Value Engineering and Management: Innovation in the Value Methodology, 29–36. West Java, Indonesia: Universitas Indonesia.
Zhang, Y., and Z. P. Fan. 2014. “An optimization method for selecting project risk response strategies.” Int. J. Project Manage. 32 (3): 412–422. https://doi.org/10.1016/j.ijproman.2013.06.006.
Zou, P. X., G. Zhang, and J. Wang. 2007. “Understanding the key risks in construction projects in China.” Int. J. Project Manage. 25 (6): 601–614. https://doi.org/10.1016/j.ijproman.2007.03.001.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 1January 2024

History

Received: Nov 27, 2022
Accepted: Sep 12, 2023
Published online: Oct 27, 2023
Published in print: Jan 1, 2024
Discussion open until: Mar 27, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Mei-yung Leung [email protected]
Associate Professor, Dept. of Architecture and Civil Engineering, City Univ. of Hong Kong, 80 Tat Chee Ave., Kowloon Tong, Kowloon, Hong Kong. Email: [email protected]
Guangxi Univ. of Finance and Economics, Guangxi, Nanning, China. ORCID: https://orcid.org/0000-0002-6720-3887. Email: [email protected]
Ph.D. Candidate, Dept. of Architecture and Civil Engineering, City Univ. of Hong Kong, 80 Tat Chee Ave., Kowloon Tong, Kowloon, Hong Kong (corresponding author). ORCID: https://orcid.org/0000-0001-9154-8001. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share