Technical Papers
Dec 26, 2022

Research on the BIM Application Mechanism of Engineering-Procurement-Construction Projects Based on a Tripartite Evolutionary Game

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 3

Abstract

This study establishes a tripartite evolutionary game model based on the assumptions of bounded rationality and the interaction behavior of governments, owners, and general contractors to examine how strategies are changing for three stakeholders regarding the building information modeling (BIM) application in engineering-procurement-construction (EPC) projects. The theoretical model was validated and the effects of critical factors on stakeholder decision making were discussed using case study and numerical simulation analysis. The results show that (1) the choice of the BIM application strategy in EPC projects is affected by the interactive behavior of participants in the game, (2) the reasonable subsidies contribute to the evolution of the ideal stable strategy, (3) the owners’ high standard of incentives for general contractors can accelerate BIM promotion, (4) the general contractors are more sensitive to the loss that may be caused by problems with the BIM application, and (5) the positive externalities generated by the application of BIM have a great impact on the wide application of BIM. And some suggestions are put forward toward improving the development of BIM in EPC projects on the basis of findings. This study may contribute to our current understanding of the interactions of stakeholders in EPC projects, as well as provide valuable management implications for the governments in order to promote the development of BIM.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This work was supported by the National Natural Science Foundation of China (Grant No. 51878026).

References

Carlino, G., and W. R. Kerr. 2015. “Agglomeration and innovation.” In Vol. 5 of Handbook of regional urban economics, 349–404. Amsterdam, Netherlands: Elsevier.
Chen, C., and L. Tang. 2019. “BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance.” Autom. Constr. 107 (Nov): 102944. https://doi.org/10.1016/j.autcon.2019.102944.
Chen, P.-H., and T. C. Nguyen. 2019. “A BIM-WMS integrated decision support tool for supply chain management in construction.” Autom. Constr. 98 (Feb): 289–301. https://doi.org/10.1016/j.autcon.2018.11.019.
Chen, Y., D. Zhu, and L. Zhou. 2019. “A game theory analysis of promoting the spongy city construction at the building and community scale.” Habitat Int. 86 (Apr): 91–100. https://doi.org/10.1016/j.habitatint.2019.03.007.
Chen, Y. Q., Y. B. Zhang, and S. J. Zhang. 2014. “Impacts of different types of owner-contractor conflict on cost performance in construction projects.” J. Constr. Eng. Manage. 140 (6): 04014017. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000852.
Cheng, J. C., and Q. Lu. 2015. “A review of the efforts and roles of the public sector for BIM adoption worldwide.” J. Inf. Technol. Constr. 20 (27): 442–478.
Das, M., X. Tao, and J. C. Cheng. 2021. “BIM security: A critical review and recommendations using encryption strategy and blockchain.” Autom. Constr. 126 (Jun): 103682. https://doi.org/10.1016/j.autcon.2021.103682.
Dou, Y., X. Xue, Z. Zhao, and Y. Jiang. 2019. “Measuring the factors that influence the diffusion of prefabricated construction technology innovation.” KSCE J. Civ. Eng. 23 (9): 3737–3752. https://doi.org/10.1007/s12205-019-2029-3.
Du, Y., H. Zhou, Y. Yuan, and H. Xue. 2019. “Exploring the moral hazard evolutionary mechanism for BIM implementation in an integrated project team.” Sustainability 11 (20): 5719. https://doi.org/10.3390/su11205719.
Eleftheriadis, S., D. Mumovic, and P. Greening. 2017. “Life cycle energy efficiency in building structures: A review of current developments and future outlooks based on BIM capabilities.” Renewable Sustainable Energy Rev. 67 (Jan): 811–825. https://doi.org/10.1016/j.rser.2016.09.028.
Franz, B., and J. Messner. 2019. “Evaluating the impact of building information modeling on project performance.” J. Comput. Civ. Eng. 33 (3): 04019015. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000832.
Friedman, D. 1991. “Evolutionary games in economics.” J. Econom. Soc. 59 (3): 637–666. https://doi.org/10.1108/09699981111111148.
Gao, Y., Q. Guo, S. Zhang, and J. Zhang. 2022. “Understanding the effect of BIM capability imbalance on opportunistic behavior: The case of the Chinese construction market.” J. Manage. Eng. 38 (3): 04022005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001028.
Gaur, S., and A. Tawalare. 2022. “Investigating the role of BIM in stakeholder management: Evidence from a metro-rail project.” J. Manage. Eng. 38 (1): 05021013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000979.
Guo, H., R. Yu, and Y. Fang. 2019. “Analysis of negative impacts of BIM-enabled information transparency on contractors’ interests.” Autom. Constr. 103 (Jul): 67–79. https://doi.org/10.1016/j.autcon.2019.03.007.
Herr, C. M., and T. Fischer. 2019. “BIM adoption across the Chinese AEC industries: An extended BIM adoption model.” J. Comput. Des. Eng. 6 (2): 173–178. https://doi.org/10.1016/j.jcde.2018.06.001.
Honic, M., I. Kovacic, G. Sibenik, and H. Rechberger. 2019. “Data-and stakeholder management framework for the implementation of BIM-based material passports.” J. Build. Eng. 23 (May): 341–350. https://doi.org/10.1016/j.jobe.2019.01.017.
Hosseini, R. M., E. Parn, D. Edwards, E. Papadonikolaki, and M. Oraee. 2018. “Roadmap to mature BIM use in Australian SMEs: Competitive dynamics perspective.” J. Manage. Eng. 34 (5): 05018008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000636.
Jia, C., R. Zhang, and D. Wang. 2021. “Evolutionary game analysis of BIM adoption among stakeholders in PPP projects.” Complexity 2021 (Aug): 5553785. https://doi.org/10.1155/2021/5553785.
Lee, C. Y., H.-Y. Chong, and X. Wang. 2018. “Enhancing BIM performance in EPC projects through integrative trust-based functional contracting model.” J. Constr. Eng. Manage. 144 (7): 06018002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001521.
Lee, C.-Y., H.-Y. Chong, Q. Li, and X. Wang. 2020. “Joint contract–function effects on BIM-enabled EPC project performance.” J. Constr. Eng. Manage. 146 (3): 04020008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001766.
Lee, S., F. Peña-Mora, and M. Park. 2006. “Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects.” J. Constr. Eng. Manage. 132 (5): 452–464. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(452).
Leśniak, A., M. Górka, and I. Skrzypczak. 2021. “Barriers to BIM implementation in architecture, construction, and engineering projects—The polish study.” Energies 14 (8): 2090. https://doi.org/10.3390/en14082090.
Li, H., S. T. Thomas Ng, M. Skitmore, X. Zhang, and Z. Jin. 2017. “Barriers to building information modelling in the Chinese construction industry.” Proc. Inst. Civ. Eng. Munic. Eng. 170 (2): 105–115. https://doi.org/10.1680/jmuen.16.00059.
Li, M., H. Yu, and P. Liu. 2018. “An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM.” Autom. Constr. 91 (Jul): 284–292. https://doi.org/10.1016/j.autcon.2018.03.013.
Liu, J., R. Gao, C. Y. J. Cheah, and J. Luo. 2017. “Evolutionary game of investors’ opportunistic behaviour during the operational period in PPP projects.” Construct. Manage. Econ. 35 (3): 137–153. https://doi.org/10.1080/01446193.2016.1237033.
Liu, Q. 2021. “Asymmetric evolutionary game analysis of building information modeling (BIM) technology diffusion.” Adv. Civ. Eng. 2021 (Dec): 4464737. https://doi.org/10.1155/2021/4464737.
Love, P. E. D., J. Matthews, and S. Lockley. 2015. “BIM for built asset management.” Built Environ. Project Asset Manage. 5 (3). https://doi.org/10.1108/BEPAM-12-2014-0062.
Lu, W., L. Zhang, and L. Zhang. 2016. “Effect of contract completeness on contractors’ opportunistic behavior and the moderating role of interdependence.” J. Constr. Eng. Manage. 142 (6): 04016004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001110.
Lv, J., M. Lin, W. Zhou, and M. Xu. 2021. “How PPP renegotiation behaviors evolve with traffic changes: Evolutionary game approach.” J. Constr. Eng. Manage. 147 (5): 04021032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002024.
Lyapunov, A. M. 1992. “The general problem of the stability of motion.” Int. J. Control 55 (3): 531–534. https://doi.org/10.1080/00207179208934253.
Meng, Q., Y. Zhang, Z. Li, W. Shi, J. Wang, Y. Sun, L. Xu, and X. Wang. 2020. “A review of integrated applications of BIM and related technologies in whole building life cycle.” Eng. Constr. Archit. Manage. 27 (8): 1647–1677. https://doi.org/10.1108/ECAM-09-2019-0511.
NIBS (National Institute of Building Sciences). 2015. National building information model standard, version 2.0. Washington, DC: National Institute of Building Sciences.
Sebastian, R. 2011. “Changing roles of the clients, architects and contractors through BIM.” Eng. Constr. Archit. Manage. 18 (2): 176–187. https://doi.org/10.1108/09699981111111148.
Shanghai Municipal Commission of Housing Urban-Rural Development and Management. 2020Shanghai green building development report (2019). Shanghai, China: Shanghai Municipal Commission of Housing Urban-Rural Development and Management.
Shen, K., X. Li, X. Cao, and Z. Zhang. 2021. “Prefabricated housing subsidy analysis in China based on an evolutionary game model.” J. Civ. Eng. Manage. 27 (7): 553–570. https://doi.org/10.3846/jcem.2021.15610.
Shen, W., W. Tang, S. Wang, C. F. Duffield, F. K. P. Hui, and R. You. 2017. “Enhancing trust-based interface management in international engineering-procurement-construction projects.” J. Constr. Eng. Manage. 143 (9): 04017061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001351.
Singh, R. 2010. “Delays and cost overruns in infrastructure projects: Extent, causes and remedies.” Econ. Political Weekly 45 (21): 43–54.
Son, J., and E. M. Rojas. 2011. “Evolution of collaboration in temporary project teams: An agent-based modeling and simulation approach.” J. Constr. Eng. Manage. 137 (8): 619–628. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000331.
Su, Y., H. Si, J. Chen, and G. Wu. 2020. “Promoting the sustainable development of the recycling market of construction and demolition waste: A stakeholder game perspective.” J. Cleaner Prod. 277 (Dec): 122281. https://doi.org/10.1016/j.jclepro.2020.122281.
Sun, C., M. Wang, and F. Zhai. 2021. “Research on the collaborative application of BIM in EPC projects: The perspective of cooperation between owners and general contractors.” Adv. Civ. Eng. 2021 (Aug): 4720900. https://doi.org/10.1155/2021/4720900.
Taghizadeh, K., M. Alizadeh, and T. Yavari Roushan. 2021. “Cooperative game theory solution to design liability assignment issues in BIM projects.” J. Constr. Eng. Manage. 147 (9): 04021103. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002117.
Votto, R., L. Lee Ho, and F. Berssaneti. 2020. “Applying and assessing performance of earned duration management control charts for EPC project duration monitoring.” J. Constr. Eng. Manage. 146 (3): 04020001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001765.
Wang, J., Y. Qin, and J. Zhou. 2021. “Incentive policies for prefabrication implementation of real estate enterprises: An evolutionary game theory-based analysis.” Energy Policy 156 (Sep): 112434. https://doi.org/10.1016/j.enpol.2021.112434.
Yang, J.-B., and H.-Y. Chou. 2019. “Subjective benefit evaluation model for immature BIM-enabled stakeholders.” Autom. Constr. 106 (Oct): 102908. https://doi.org/10.1016/j.autcon.2019.102908.
Yuan, H., and Y. Yang. 2020. “BIM adoption under government subsidy: Technology diffusion perspective.” J. Constr. Eng. Manage. 146 (1): 04019089. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001733.
Yuan, M., Z. Li, X. Li, L. Li, S. Zhang, and X. Luo. 2022. “How to promote the sustainable development of prefabricated residential buildings in China: A tripartite evolutionary game analysis.” J. Cleaner Prod. 349 (May): 131423. https://doi.org/10.1016/j.jclepro.2022.131423.
Zhang, J., Y. Long, S. Lv, and Y. Xiang. 2016. “BIM-enabled modular and industrialized construction in China.” Procedia Eng. 145 (Jan): 1456–1461. https://doi.org/10.1016/j.proeng.2016.04.183.
Zhang, S., F. Pan, C. Wang, Y. Sun, and H. Wang. 2017. “BIM-based collaboration platform for the management of EPC projects in hydropower engineering.” J. Constr. Eng. Manage. 143 (12): 04017087. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001403.
Zheng, L., W. Lu, K. Chen, K. W. Chau, and Y. Niu. 2017. “Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation.” Int. J. Project Manage. 35 (3): 393–405. https://doi.org/10.1016/j.ijproman.2017.01.006.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 3March 2023

History

Received: Dec 2, 2021
Accepted: Oct 19, 2022
Published online: Dec 26, 2022
Published in print: Mar 1, 2023
Discussion open until: May 26, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Professor, School of Urban Economics and Management, Beijing Univ. of Civil Engineering and Architecture, Beijing 102616, China. ORCID: https://orcid.org/0000-0003-1131-0189. Email: [email protected]
Master’s Degree Candidate, School of Urban Economics and Management, Beijing Univ. of Civil Engineering and Architecture, Beijing 102616, China. Email: [email protected]
Qingpeng Man [email protected]
Associate Professor, School of Civil Engineering, Harbin Institute of Technology, Harbin 150001, China (corresponding author). Email: [email protected]
Dongjun Wan [email protected]
Associate Professor, School of Urban Economics and Management, Beijing Univ. of Civil Engineering and Architecture, Beijing 102616, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Developing Collaborative Driving Mechanism of Prefabricated Buildings Using Multiagent Stochastic Evolutionary Game, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14396, 150, 6, (2024).
  • Evolutionary Game Analysis of Optimal Strategies for Construction Stakeholders in Promoting the Adoption of Green Building Technology Innovation, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14071, 150, 5, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share