Chapter
May 16, 2024

Risks and Uncertainties When Retrofitting Existing Low Head Dams with Hydroelectric Turbines

Publication: World Environmental and Water Resources Congress 2024

ABSTRACT

This paper addresses the risks and uncertainties associated with developing small hydropower projects the US informed by real-world case studies. It presents a road map to unlock the enormous untapped potential of integrating hydropower into existing infrastructure. Hydropower offers significant potential benefits, including grid stability and 24×7 low-carbon electricity. According to a study by the Department of Energy, of the roughly 90,000 dams nationwide, only 3% have been retrofitted with hydro turbines. This suggests a tremendous opportunity. However, the hydropower sector growth is very slow due to protracted development timelines, stemming largely from a convoluted permitting process. This intricate process requires securing approvals from federal, state, and local agencies, bringing with it an element of unpredictability. The subsequent prolonged timelines, coupled with at-risk predevelopment costs, deter many potential investors and developers. From a regulatory standpoint, the intricate web of requirements, often with overlapping jurisdictions, presents challenges. Market dynamics further complicates the situation, as supply chain constraints, rising material costs, labor shortages, and competition from other renewable sources undermine hydropower’s growth. To address these challenges, this paper delves into Rye Development’s projects: the Allegheny Lock and Dam #2 and the Emsworth Lock and Dam, located near Pittsburgh on the Allegheny and Ohio Rivers, respectively. Both sites underwent the rigorous FERC licensing process and are now in the design and review stages with the United States Army Corps. Through these case studies, the paper seeks to offer invaluable insights to expedite future small hydropower development endeavors in the US.

Get full access to this chapter

View all available purchase options and get full access to this chapter.

REFERENCES

Uría-Martínez, R., and Johnson, M. M. 2023. U.S. Hydropower Market Report (2023 edition). Washington, DC: Water Power Technologies Office, US Department of Energy.
Johnson, M. M., and Uría-Martínez, R. 2023. U.S. Hydropower Development Pipeline Data, 2023., Oak Ridge National Laboratory, Oak Ridge, Tennessee, USA. https://doi.org/10.21951/HMR_PipelineFY23/1972056.
Allegheny Lock and Dam 2 Project, Rye Development https://pittsburghhydro.com/projects.html#allegheny.
Emsworth Main Channel Project, Rye Development https://pittsburghhydro.com/projects.html#emsworth.
Hydropower 2025: Identifying the next 850+GW towards Net Zero. International Hydropower Association.
USACE. National Inventory of dams.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$286.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$286.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share