ABSTRACT

Pre-project planning encompasses all the tasks from project initiation to the beginning of detailed design. Planning efforts at this stage have a significant effect on project success than efforts undertaken after project kickoff. Given that some contractors are new to the accelerated bridge construction (ABC) method, providing knowledge of ABC success indicators during the initial phase will significantly impact ABC project success. The research aims to (1) identify the success indicators through a systematic literature review, (2) conduct a survey of ABC stakeholders with a focus on successful ABC projects to validate and define the weighted success criteria, and (3) develop an ABC success index matrix. The study identified 16 ABC success indicators that should be taken into consideration during the pre-project planning stages of the ABC project. The study findings will support, educate, and direct ABC contractors to realize/value the significance of pre-project planning and encourages better organizational management.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Abu-Hawash, A., Nelson, J., and Bierwagen, D. (2009). ABC- achieving the need for speed.
Akinola, A. A. (2015). Examining the Cost Distinction between the Accelerated Bridge Construction (ABC) and the Conventional Cast-In-Place (CIP) Methods of Bridge Construction.
Aktan, H., and Attanayake, U. (2013). Improving Bridges with Prefabricated Precast Concrete Systems. Michigan.
Aktan, H., Attanayake, U., and Mohammed, A. W. (2014). Michigan Department of Transportation Bridge Slide Showcase.
Ardani, A., Mallela, J., and Hoffman, G. (2013). Oregon Demonstration Project : Alternate Project Delivery and Accelerated Bridge Construction On or 38, Drain to Elkton.
Becker, M. F. (2009). Evaluation of accelerated bridge construction methods and designs in the state of Iowa.
Bingham, E., and Gibson, G. E. (2017). “Infrastructure Project Scope Definition Using Project Definition Rating Index.” Journal of Management in Engineering, 33(2), 04016037.
Carfagno, M. G., and Dickerson, K. (2018). Rapid Replacement of Two Washington DOT Stream Crossing Bridges using Prefabricated Arch Bridge Systems. ABC-UTC.
Chang, C. M. (2021). Life-Cycle Cost Analysis of Ultra High-Performance Concrete (UHPC) in Retrofitting Techniques for ABC projects.
CII (Construction Industry Institute). (2006). “Front End Planning: Break the Rules, Pay the Price.” Construction Industry Institute, Austin, TX.
CII (Construction Industry Institute). (2016). “Project Definition Rating Index -- Small Infrastructure Projects,.” 110.
Culmo, M., Sadasivam, S., Gransberg, D., Boyle, H., Deslis, A., Duguay, W., Rose, D., Mizioch, C., and Mallela, J. (2013). Contracting and Construction of Accelerated Bridge Construction Projects with Prefabricated Bridge Elements and systems. New Jersey.
D’Andrea, M., Young, W., and Turnbull, A. (2016). “Westminster drive underpass - Accelerated bridge construction using GiGo (get in-get out) bridge concept.” Proceedings, Annual Conference - Canadian Society for Civil Engineering, 1881–1890.
Dean, N., Stevens, C., and Hastings, J. (2019). Accelerated Bridge Construction Methods for Bridge 1-438 Replacement.
DeJong, A. (2019). Innovations in integral abutment connection details for accelerated bridge construction.
El-sayegh, S. M. (2008). “Evaluating the Effectiveness of Project Delivery Methods.” Journal of Construction Management and Economics, 23(5), 457–465.
Elzomor, M. A., Parrish, K., Gibson, G. E., Jr., and El Asmar, M. (2017). Development of the Project Definition Rating Index (PDRI) for Small Infrastructure Projects. Arizona State University.
ElZomor, M., Burke, R., Parrish, K., and Gibson, G. E. (2018). “Front-End Planning for Large and Small Infrastructure Projects: Comparison of Project Definition Rating Index Tools.” Journal of Management in Engineering, 34(4), 04018022.
ElZomor, M., Garber, D., and Pradhananga, P. (2023). Developing ABC Sucess Index to Support Contractors During Pre-Project Planning.
Freeseman, K., Shane, J., and Volk, M. (2020). Delivery Methods for Accelerated Bridge Construction Projects: Case Studies and Consensus Building.
Gad, G. M., Gransberg, D. D., and Loulakis, M. (2015). “Policies and procedures for successful implementation of alternative technical concepts.” Transportation Research Record, 2504, 78–86.
Galvis, F., and Correal, J. F. (2017). “Characterization of the Seismic Behavior of a Column-Foundation Connection for Accelerated Bridge Construction.” 16th World Conference on Earthquake, 16WCEE 2017.
George, R., Bell, L. C., and Edward Back, W. (2008). “Critical Activities in the Front-End Planning Process.” Journal of Management in Engineering, 24(2), 66–74.
Gibson, G. E., Bingham, E., and Stogner, C. R. (2010). “Front end planning for infrastructure projects.” Construction Research Congress 2010: Innovation for Reshaping Construction Practice - Proceedings of the 2010 Construction Research Congress, 1125–1135.
Gibson, G. E., Wang, Y.-R., Cho, C.-S., and Pappas, M. P. (2006). “What Is Preproject Planning, Anyway?” Journal of Management in Engineering, 22(1), 35–42.
Gransberg, D. D. (2013). “Early contractor design involvement to expedite delivery of emergency highway projects.” Transportation Research Record, (2347), 19–26.
Hällmark, R., White, H., and Collin, P. (2012). “Prefabricated bridge construction across Europe and America.” Practice Periodical on Structural Design and Construction, 17(3), 82–92.
Hansen, S., Too, E., and Le, T. (2018). “Retrospective look on front-end planning in the construction industry: A literature review of 30 years of research.” International Journal of Construction Supply Chain Management, 8(1), 19–42.
Head, M., Efe, S., Grose, S., Drumgoole, J., Lajubutu, O., Wright, R., and Hansboro, T. (2015). Durability assessment of prefabricated bridge elements and systems. Maryland.
Jia, J., Ibrahim, M., Hadi, M., Orabi, W., and Xiao, Y. (2018). “Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method.” Sustainability.
Jones, B. (2014). “Integrated project delivery (IPD) for maximizing design and construction considerations regarding sustainability.” Procedia Engineering, Elsevier B.V., 95(Scescm), 528–538.
Kamble, S. S., Gunasekaran, A., and Gawankar, S. A. (2018). “Sustainable Industry 4.0 framework: A systematic literature review identifying the current trends and future perspectives.” Process Safety and Environmental Protection, Institution of Chemical Engineers, 117, 408–425.
Khaleghi, B., Schultz, E., Seguirant, S., Marsh, L., Haraldsson, O., Eberhard, M., and Stanton, J. (2012). “Accelerated bridge construction in Washington state: From research to practice.” PCI Journal, 57(4), 34–49.
Khan, M. (2015). Accelerated bridge construction: Best Practices and Techniques. Bridge Engineering Handbook, Second Edition: Construction and Maintenance.
Littleton, P., and Mallela, J. (2013). Iowa Demonstration Project: Accelerated Bridge Construction on US 6 over Keg Creek.
Lotfy, I. (2015). Structural Performance of High Density Polyethylene Crossties and Use in Accelerated Bridge Construction.
Malla, P., Khedmatgozar Dolati, S. S., Ortiz, J. D., Mehrabi, A., Nanni, A., and Dinh, K. (2023). “Feasibility of Conventional Non-Destructive Testing Methods in Detecting Embedded FRP Reinforcements.” Applied Sciences, 13(7), 4399.
Mallela, J., Sadasivam, S., and Ullman, J. (2014). Massachusetts Demonstration Project : Reconstruction of Fourteen Bridges on I-93 in Medford Using Accelerated Bridge Construction Techniques.
Muhaimin, A. M. M., Zhang, L., Dhakal, S., Lv, X., Pradhananga, N., Kalasapudi, V. S., and Azizinamini, A. (2021). “Identification and Analysis of Factors Affecting the Future of Bridge Design, Construction, and Operation.” Journal of Management in Engineering, 37(5), 04021049.
Ofili, M. (2015). State of Accelerated Bridge Construction (ABC) in the United States.
Orabi, W., Mostafavidarani, A., and Ibrahim, M. (2016). Estimating the Construction Cost of Accelerated Bridge Construction (ABC).
de Ormijana, F. S., and Rubio, N. (2013). “Innovation Capture through the Alternative Technical Concept Process in PPPs in Texas: A Tool for Financial Viability.” Advances in Public-Private Partnerships, (2000), 275–289.
Phares, B., and Cronin, M. (2015). Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation.
Pradhananga, P., and ElZomor, M. (2022). “Leveraging Alternative Technical Concept for Contract Delivery of Accelerated Bridge Construction.” Proceedings of Construction Research Congress, 88–99.
Pradhananga, P., Elzomor, M., and Gada, G. M. (2022). “Investigating the Impact of Alternative Technical Concepts for Project Delivery of Accelerated Bridge Construction.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(2).
Ptschelinzew, L. R., Edward Minchin, R. J., Migliaccio, G. C., Atkins, K. E., Hostetler, G. A., Warne, T. R., and Nettuno, G. (2013). “Best Practices in Design Process Development for Accelerated Construction Project Delivery.” New Developments in Structural Engineering and Construction, 1–6.
Reid, S., McLeod, C., and McInnis, S. (2018). “Slide-in Bridge Construction using the Construction Manager General Contractor, Contract Delivery Model.” Conference of the Transportation Association of Canada.
Roddenberry, M., and Servos, J. (2012). Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges.
Sutaria, C. P. (2012). ‘ Safe and Sound ’ – An Accelerated Bridge Improvement Program in Missouri.
Tazarv, M., and Saiidi, M. S. (2015). “UHPC-filled duct connections for accelerated bridge construction of RC columns in high seismic zones.” Engineering Structures, Elsevier Ltd, 99, 413–422.
Volk, M. (2020). The effect of alternative delivery on accelerated bridge construction projects. Iowa State University.
Weerasinghe, G., Soundararajan, K., and Ruwanpura, J. (2007). “LEED – PDRI Framework for Pre-Project Planning.” Journal of Green Building, 2(3), 123–143.
Yavuz, F., Solterman, T., Attanayake, U., and Aktan, H. (2017). “Economic Impact Analysis of Bridge Construction.” Transportation Research Record, 2630(1), 95–102.
Yen, W. P., Saiidi, M. S., Keever, M., Kapur, J., Dekelbab, W., Bardow, A. K., Sletten, J. J., and Tobias, D. H. (2015). Performance of Accelerated Bridge Construction Connection in Bridges Subjected to Extreme Events. Public Works Research Institute.

Information & Authors

Information

Published In

Go to Construction Research Congress 2024
Construction Research Congress 2024
Pages: 455 - 465

History

Published online: Mar 18, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Piyush Pradhananga, S.M.ASCE [email protected]
1Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Florida International Univ., Miami, FL. ORCID: https://orcid.org/0000-0002-4560-6001. Email: [email protected]
Mohamed ElZomor, Ph.D., M.ASCE [email protected]
2Associate Professor, Moss School of Construction, Infrastructure, and Sustainability, Florida International Univ., Miami, FL. ORCID: https://orcid.org/0000-0002-7734-9601. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$148.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$148.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share