Improving the Reliability of Adverse Weather Day Estimation in Project Planning: A Framework Utilizing Daily Work Reports
Publication: Construction Research Congress 2024
ABSTRACT
The transportation construction industry is one of the most critical components of every country’s economic growth. However, several projects nationwide faced schedule delays because of weather conditions and other factors. Therefore, considering accurate weather-related delays and establishing a reasonable construction time is essential in project planning and schedule management. Thus, this study proposes a framework for estimating weather delays using historical daily work reports (DWRs). Project data from 161 completed projects, including 29,539 DWRs, were collected from a state highway agency. These projects were delivered between March 2017 and February 2023. The framework analyzes DWRs to determine how many weather delays occurred each month by location by searching for keywords in DWRs. Finally, 15 case studies were conducted to validate and measure the proposed framework’s accuracy using Akaike information criteria (AIC) best selection measure and risk Pareto distribution as it striked a balance between the goodness of fit model for all 12 months. This study helps state highway agencies determine an accurate account for weather delays based on historical data to estimate construction time better.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Abdelaty, A., and Jamal, M. S. (2022). Guidelines for Developing and Reviewing Baseline Schedules for Wyoming Transportation Projects. https://rosap.ntl.bts.gov/view/dot/64092.
Apipattanavis, S., Sabol, K., Molenaar, K. R., Rajagopalan, B., Xi, Y., Blackard, B., and Patil, S. (2010). Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), 1160–1168. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000199.
Ballesteros-Pérez, P., Rojas-Céspedes, Y. A., Hughes, W., Kabiri, S., Pellicer, E., Mora-Melià, D., and del Campo-Hitschfeld, M. L. (2017). Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims. Automation in Construction, 84, 81–95. https://doi.org/10.1016/j.autcon.2017.08.022.
Cai, X., Hejazi, M. I., and Wang, D. (2011). Value of probabilistic weather forecasts: Assessment by real-time optimization of irrigation scheduling. Journal of Water Resources Planning and Management, 137(5), 391–403. https://doi.org/10.1061/(ASCE)WR.1943-5452.0000126.
Choi, S., Kim, Y. J., Briceno, S., and Mavris, D. (2016). Prediction of weather-induced airline delays based on machine learning algorithms. 2016 IEEE/AIAA 35th Digital Avionics Systems Conference (DASC), 1–6. https://doi.org/10.1109/DASC.2016.7777956.
Jamal, M. S., Abdelaty, A., and Shrestha, J. (2022). Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons. Proceeding of 9th International Conference on Construction Engineering and Project Management (ICCEPM 2022), 9, 616–623. https://www.auric.or.kr/User/Rdoc/DocRdoc.aspx?returnVal=RD_R&dn=415226.
Jung, M., Park, M., Lee, H. S., and Kim, H. (2016). Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of construction engineering and management, 142(6), 04016007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001109.
Kenner, S., Johnson, R. L., Matt, S. A., Miller, J. R., and Salmen, J. A. (1998). Development of working day weather charts for transportation construction in south Dakota. https://rosap.ntl.bts.gov/view/dot/14107.
Thorpe, D., and Karan, E. P. (2008). Method for calculating schedule delay considering weather conditions. Proceedings of the 24th Annual Conference of the Association of Researchers in Construction Management (ARCOM 2008), 2, 809–818. https://research.usq.edu.au/item/9zx48/method-for-calculating-schedule-delay-considering-weather-conditions.
Woldesenbet, A., Jeong, D. H. S., and Oberlender, G. D. (2012). Daily work reports–based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), 481–490. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000442.
Information & Authors
Information
Published In
History
Published online: Mar 18, 2024
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.