Results of a Groundbreaking Integrated Delivery Project: Multi-Stakeholder Assessments and Lessons Learned from the Waaban Crossing Bridge
Publication: Construction Research Congress 2024
ABSTRACT
The Waaban Crossing bridge project located in Kingston, Ontario, Canada, was delivered with an integrated project delivery (IPD) approach. In 2020, it was recorded that this project was the first major public infrastructure project in North America to be contracted with a tri-party agreement and managed through an IPD approach. The project stakeholders selected an IPD for various and differing reasons, including risk reduction, collaborative decision making, and fiscal transparency. As the project was completed in December 2022, project stakeholders can reflect on the outcomes and lessons learned. Online surveys and semi-structured interviews of project stakeholders surface hits and misses for the project. Project participants’ answers are revealed and documented to determine the extent to which initial goals and objectives for the project were realized. Data are collected individually, so that the unique perspectives of owner, designer, prime contractor, and specialty contractor are contrasted. The project was reported a success by all stakeholders, yet fundamental business drivers that can put entities at odds with one another were present. The findings can inform planners of IPD projects on how to manage project delivery and to structure financial incentives that address the business needs of all key stakeholders.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Becker, T. C., Shane, J. S., and Jaselskis, E. J. (2012). “Comparative Analysis of Lean Construction with Design-Build Using a Framework of Contractual Forms of Agreement.” J. Archit. Eng., Vol. 18(2), 187–191.
City of Kingston, Ontario, Canada. https://thirdcrossing.cityofkingston.ca/the-bridge/timeline.
Cheng, R., and Johnson, A. J. (2016). “MOTIVATION AND MEANS: How and Why IPD and Lean Lead to Success.”, Nov. 2016.
Conover, W. J. (1999). Practical Nonparametric Statistics, 3rd Edition. John Wiley & Sons, Inc.
Dunn, O. J. (1961). “Multiple Comparisons Among Means.” Journal of the American Statistical Association, Vol. 56 (293), 52–64.
Forbes, L. H., and Ahmed, S. M. (2011). Modern Construction: Lean Project Delivery and Integrated Practices. Taylor & Francis Group, LLC.
Lopez del Puerto, C., Gransberg, D. D., and Shane, J. S. (2008). “Comparative analysis of owner goals for design/build projects.” J. Manage. Eng., 24(1), 32–39.
Molenaar, K. R., Songer, A. D., and Barash, M. (1999). “Public-Sector Design/Build Evolution and Performance.” J. Manage. Eng., 15(2), 54–62.
Poirier, E. A., Staub-French, S., Arar, A., Zadeh, P., and Bhonde, D. (2022). “Investing Factors Leading to IPD Project Success in Canada.”, May 2022.
Roscoe, J. T. (1975). Fundamental Research Statistics for the Behavioral Sciences, 2nd Edition. Holt, Rinehart and Winston, Inc.
Shane, J., Becker, T., Roberts, C., Kiggins, M., and van Buren, M. (2020). “Owner and Contractor Choices and Dilemmas: Contemporary Project Delivery Options.” Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts, American Society of Civil Engineers, Nov. 9, 2020.
Information & Authors
Information
Published In
History
Published online: Mar 18, 2024
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.