Multi-User Mixed-Reality Collaboration Framework for Onsite MEP Coordination
Publication: Construction Research Congress 2024
ABSTRACT
Onsite coordination with Building Information Modeling (BIM) could improve collaboration and prevent conflicts between stakeholders during the construction phase. Recent research shows that mixed reality technology can extend the usage of BIM and enhance coordination to the next level. However, current practices often use LOD300, which provides inadequate information for MEP system coordination and can lead to clashes and reworks. On the other hand, the MR interaction is often limited to single-user scenarios. This paper proposes an onsite collaboration framework for multiple MR device users to examine the MEP system from lower LOD models in the construction phase. This framework includes creating an MEP system prototyping, generating an MR interaction module, developing a multi-user collaboration module, and establishing a report model. The system allows managers to check the MEP system’s position, communicate issues, make changes, enable design change coordination, resolve clashes, and reduce reworks. We evaluate this framework through a case study, using scenarios such as moving components and measuring distances with multiple devices.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Alizadehsalehi, S., A. Hadavi, and J. C. Huang. 2020. “From BIM to extended reality in AEC industry.” Automation in Construction 116, 103254.
Ashuri, B., S. Yarmohammadi, and M. Shahandashti. “A critical review of methods used to determine productivity of mechanical, electrical, and plumbing systems coordination.” Proc., Construction Research Congress 2014: Construction in a Global Network, 777–786.
Chen, K. 2019. Application of mixed reality technology for operations and maintenance of building facilities.
Dong, S., A. H. Behzadan, F. Chen, and V. R. Kamat. 2013. “Collaborative visualization of engineering processes using tabletop augmented reality.” Advances in Engineering Software 55, 45–55.
Du, J., Y. Shi, Z. Zou, and D. Zhao. 2018. “CoVR: Cloud-based multiuser virtual reality headset system for project communication of remote users.” Journal of Construction Engineering and Management 144(2), 04017109.
Garbett, J., T. Hartley, and D. Heesom. 2021. “A multi-user collaborative BIM-AR system to support design and construction.” Automation in Construction 122, 103487.
Golparvar-Fard, M., F. Peña-Mora, and S. Savarese. 2009. “D4AR–a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication.” Journal of information technology in construction 14(13), 129–153.
Hasannejad, A., J. M. Sardrud, and A. A. Shirzadi Javid. 2022. “BIM-based clash detection improvement automatically.” International Journal of Construction Management 1–7.
Hong, Y., A. W. Hammad, and A. Akbarnezhad. 2019. “Forecasting the net costs to organisations of Building Information Modelling (BIM) implementation at different levels of development (LOD).” J. Inf. Technol. Constr. 24, 588–603.
Hong, Y., A. W. Hammad, S. Sepasgozar, and A. Akbarnezhad. 2019. “BIM adoption model for small and medium construction organisations in Australia.” Engineering, Construction and Architectural Management 26(2), 154–183.
Hu, Y., D. Castro-Lacouture, and C. M. Eastman. 2019. “Holistic clash detection improvement using a component dependent network in BIM projects.” Automation in Construction 105, 102832.
Hu, Y., D. Castro-Lacouture, C. M. Eastman, and S. B. Navathe. 2020. “Automatic clash correction sequence optimization using a clash dependency network.” Automation in Construction 115, 103205.
Hu, Y., D. Castro-Lacouture, C. M. Eastman, and S. B. Navathe. 2021. “Component change list prediction for BIM-based clash resolution from a graph perspective.” Journal of Construction Engineering and Management 147(8), 04021085.
Hu, Y., C. Xia, J. Chen, and X. Gao. 2023. “Clash context representation and change component prediction based on graph convolutional network in MEP disciplines.” Advanced Engineering Informatics 55, 101896.
Korman, T. M., and C. Tatum. 2006. “Prototype tool for mechanical, electrical, and plumbing coordination.” Journal of Computing in Civil Engineering 20(1), 38–48.
Le, T.-H., Y.-T. Shih, and J. J. Lin. 2022. “Schedule-driven bim model breakdown framework for construction monitoring with augmented reality.” The 22nd International Conference on Construction Applications of Virtual Reality (CONVR2022)Seoul, South Korea.
Lee, G., R. Sacks, and C. M. Eastman. 2006. “Specifying parametric building object behavior (BOB) for a building information modeling system.” Automation in construction 15(6), 758–776.
Li, X., W. Yi, H.-L. Chi, X. Wang, and A. P. Chan. 2018. “A critical review of virtual and augmented reality (VR/AR) applications in construction safety.” Automation in Construction 86, 150–162.
Lin, T.-H., C.-H. Liu, M.-H. Tsai, and S.-C. Kang. 2015. “Using augmented reality in a multiscreen environment for construction discussion.” Journal of Computing in Civil Engineering 29(6), 04014088.
Mahalingam, A., R. Kashyap, and C. Mahajan. 2010. “An evaluation of the applicability of 4D CAD on construction projects.” Automation in construction 19(2), 148–159.
Park, C.-S., D.-Y. Lee, O.-S. Kwon, and X. Wang. 2013. “A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template.” Automation in construction 33, 61–71.
Pärn, E., D. Edwards, and M. C. Sing. 2018. “Origins and probabilities of MEP and structural design clashes within a federated BIM model.” Automation in Construction 85, 209–219.
Tatum, C., and T. Korman. 2000. “Coordinating building systems: process and knowledge.” Journal of Architectural Engineering 6(4), 116–121.
Truong, P., K. Hölttä-Otto, P. Becerril, R. Turtiainen, and S. Siltanen. 2021. “Multi-user virtual reality for remote collaboration in construction projects: A case study with high-rise elevator machine room planning.” Electronics 10(22), 2806.
Wang, J., X. Wang, W. Shou, H.-Y. Chong, and J. Guo. 2016. “Building information modeling-based integration of MEP layout designs and constructability.” Automation in construction 61, 134–146.
Wang, X., and P. S. Dunston. 2011. “Comparative effectiveness of mixed reality-based virtual environments in collaborative design.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 41(3), 284–296.
Yung, P., J. Wang, X. Wang, and M. Jin. 2014. A BIM-enabled MEP coordination process for use in China.
Information & Authors
Information
Published In
History
Published online: Mar 18, 2024
ASCE Technical Topics:
- Architectural engineering
- Building information modeling
- Building management
- Buildings
- Case studies
- Construction engineering
- Construction equipment
- Construction management
- Engineering fundamentals
- Equipment and machinery
- Information systems
- Material mechanics
- Material properties
- Materials engineering
- Methodology (by type)
- Research methods (by type)
- Resilient modulus
- Structural engineering
- Structures (by type)
- Systems engineering
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.