Chapter
Jan 5, 2023

Lunar Base Construction Planning

Publication: Earth and Space 2022

ABSTRACT

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan, and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an overarching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power, and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy, and robotic helpers that will minimize the amount of extra-vehicular activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In situ resource utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in situ.” This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture, and landing. This paper will give a historical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Bergaust, E. (2017). Wernher von Braun. Stackpole Books.
Carrato, P., Ellis, A., Mueller, R. P., & Miller, C. (2018). Developing a Request for Proposal (RFP) for Moon Base Alpha. In Earth and Space 2018: Engineering for Extreme Environments (pp. 207–218). Reston, VA: American Society of Civil Engineers.
Drake, Bret G. (2005). NASA Exploration Systems Architecture Study, NASA-TM-2005-214062, Final Report, pages 77-89.
Hill, B. (2018). 45th Space Congress “The Next Great Steps”: Space Policy Directive-1.
Hoffman, S. J. (2001). The Mars Surface Reference Mission: A Description of Human and Robotic Surface Activities, NASA/TP—2001–209371. National Aeronautics and Space Administration, Lyndon B. Johnson Space Center.
Kennedy, K. (2002, October). The vernacular of space architecture. In AIAA Space Architecture Symposium (p. 6102).
Lewis, M. E & McClesky, C. M., (2022). Personal Communication from a NASA Artemis Program Surface Systems Study Performed at NASA, Kennedy Space Center.
Lewis, R., Toups L., Hoffman, S., Gruener, J., Jagge, A., Deitrick, S., Lawrence, S., Britton, A., Hinterman, E. (2019). Site Planning and Design to Enable Lunar and Mars Human Exploration, Poster, Lunar Exploration & Analysis Group (LEAG) Workshop, Denver, Colorado.
Launius, R. D. (2008). Final Countdown: NASA and the End of the Space Shuttle Program, by Pat Duggins. Space Policy.
Logsdon, J. M. (2010). In John F. Kennedy and the Race to the Moon (pp. 223–244). Palgrave Macmillan, New York.
Mankins, J. C. (2009). Technology readiness assessments: A retrospective. Acta Astronautica, 65(9-10), 1216–1223.
Metzger, P. T., Muscatello, A., Mueller, R. P., & Mantovani, J. (2013). Affordable, rapid bootstrapping of the space industry and solar system civilization. Journal of Aerospace Engineering, 26(1), 18–29.
Mueller, R. P. (2022). The Lunar Base Handbook 2nd Edition, Lunar Construction Chapter. Eckart, P. (Ed.). Author’s input – not printed yet. New York: McGraw-Hill.
Mueller, R. P., & King, R. H. (2008, January). Trade study of excavation tools and equipment for lunar outpost development and ISRU. In AIP conference proceedings (Vol. 969, No. 1, pp. 237–244). American Institute of Physics.
Mueller, R. P., Moses, R., Wilson, D., Carrato, P., & King, T. (2020). Lunar Mega Project: Processes, Work Flow, and Terminology of the Terrestrial Construction Industry versus the Space Industry. In Earth and Space 2021 (pp. 1177–1188).
Moses, R. W., & Mueller, R. P. (2021). Requirements Development Framework for Lunar In Situ Surface Construction of Infrastructure. In Earth and Space 2021 (pp. 1141–1155).
National Aeronautics & Space Administration (NASA) (2022). https://www.nasa.gov/specials/artemis/ Retrieved January 19, 2022
National Aeronautics & Space Administration (NASA) (1988). Lunar Base Launch & Landing Facility Conceptual Design, NASA-CR–172049, Contract Number NAS9-17878, Eagle Engineering Inc., EEI Report 88-178.
Phillips, P. G., Simonds, C. H., & Stump, W. R. (1988). Lunar Base Launch and Landing Facilities. In Second Conference on Lunar Bases and Space Activities of the 21st Century (Vol. 652, p. 194).
Smith, M., Craig, D., Herrmann, N., Mahoney, E., Krezel, J., McIntyre, N., & Goodliff, K. (2020, March). The Artemis Program: An Overview of NASA’s Activities to Return Humans to the Moon. In 2020 IEEE Aerospace Conference (pp. 1–10). IEEE.

Information & Authors

Information

Published In

Go to Earth and Space 2022
Earth and Space 2022
Pages: 858 - 870

History

Published online: Jan 5, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Robert P. Mueller
Swamp Works, Exploration and Research Technologies, Kennedy Space Center, National Aeronautics and Space Administration (NASA), FL

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$164.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$164.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share