Electrical Transmission and Substation Structures 2022
Optimization of Transmission Line Structures Using Braced Post Insulators
Publication: Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure
ABSTRACT
Due to advancements in silicon and fiberglass rod technology there are now seemingly limitless options to customize high voltage braced post insulator designs for new or existing poles and lattice structures. This paper covers the optimization process for transmission line design using braced post insulation for 138 and 240 kV circuits and reviews examples of custom applications where braced post insulators have been used for the purpose of clearance mitigation without replacing structures. This paper will break down the steps of line optimization and benefits of braced post insulators for new line construction compared to traditional pole and crossarm designs. Some of the benefits that will be covered include reduced construction and assembly time, reduced hardware requirements, better contamination resistance, bird perch reduction, reduced right-of-way requirements, smaller structure footprint, and fire hardening. Also discussed in the paper is the process of modifying existing structures with custom compact braced post insulator designs to increase clearance without losing full functionality of the structure. This paper will provide examples where traditional cross arms with suspension insulators and lattice tower arms have been replaced with specialized braced post insulator assemblies to mitigate clearance violations in Alberta, Canada. Some of the drawbacks of braced post insulators such as reduced longitudinal capacity and increased galloping risk, are also summarized in this paper.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
1.
AESO. 2019. Bulk Transmission Technical Requirements, ISO Standard Section 502.2. Alberta Electric System Operator
2.
AEUC. 2007, Alberta Electrical Utility Code, Alberta Safety Code Council.
3.
CSA C22.3 No. 1-15. 2020, Overhead systems, Canadian Standards Association.
4.
PLS POLE. 2022. Analysis and Design software tool, Powerline Systems.
5.
Canada Climate Institute, 2019, Canada’s Climate Report; Government of Canada, Ottawa, ON.
6.
INMR (Insulator News Market Research) 2016, Goulden Report on overview of world Markets for Insulators.
7.
IPCC, 2022, The Intergovernmental Panel on Climate Change, Geneva, Switzerland.
Information & Authors
Information
Published In
Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure
Pages: 366 - 392
Editor: Tim Cashman
ISBN (Online): 978-0-7844-8446-3
Copyright
© 2022 American Society of Civil Engineers.
History
Published online: Sep 20, 2022
Published in print: Sep 20, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.