Electrical Transmission and Substation Structures 2022
A Renaissance in Tower Testing
Publication: Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure
ABSTRACT
Over the past few years, several large Extra High Voltage (EHV) transmission line projects have enabled a North American renaissance in latticed tower design and testing. POWER Engineers, Inc. was recently involved in multiple EHV tower family designs and subsequent full-scale testing efforts. In addition to compressed project schedules, design modifications to accommodate permitting and test facilities located around the globe, the COVID-19 pandemic added unprecedented challenges to the latticed tower testing programs. Our experiences and lessons learned on tower testing from the Owner’s and Owner’s Engineer perspectives are the subject of this paper. Tower testing for multiple projects and multiple tower types, over a short period of time enables the engineer a unique opportunity to witness, evaluate, and compile high-level best practices and lessons learned. In this light, the following topics are addressed: reasons why an Owner would or would not test towers; timing and schedule for design and tower testing; general guidelines, key elements, and suggestions for lattice tower testing; development and sequencing of test load cases; potential pitfalls and testing challenges; and witnessing of tower testing including remote witnessing.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
ASCE (American Society of Civil Engineers). (2015) Design of Latticed Steel Transmission Structures, Standard ASCE/SEI 10-15. ASCE, Reston, VA.
A. Langlois, S. Prud’Homme, F. Légeron, F. Pourshargh. (2016) Review of Advanced Modelling Methods for Lattice Steel Towers. CIGRE-IEC Colloquium. May 9-11. Montréal, QC, Canada.
CEI IEC 60652. (2002). Loading Tests on Overhead Line Structures. Second edition. 2002-06.
Miller, Mike (2009). Tower Testing: How to Specify, Work with Vendor and Oversee Testing. Power Delivery Design Conference, Sun Valley Idaho, 2009.
T&D World, Latticed Steel Transmission Tower Testing Still Valuable. http://www.tdworld.com
Working Group B2.08 CIGRE 399. (2009). Improvement on the Tower Testing Methodology. December.
Information & Authors
Information
Published In
Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure
Pages: 184 - 195
Editor: Tim Cashman
ISBN (Online): 978-0-7844-8446-3
Copyright
© 2022 American Society of Civil Engineers.
History
Published online: Sep 20, 2022
Published in print: Sep 20, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.