The Badger Coulee Transmission Line: Overcoming the Challenges of Wisconsin
Authors: Griffen Erickson, M.ASCE [email protected], Michael Bradley [email protected], Cory Jacobsen, M.ASCE [email protected], and Jacob Valentine IV [email protected]Author Affiliations
Publication: Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure
ABSTRACT
The Badger Coulee transmission line is a 180-mile 345 kV transmission line that extends from the Briggs Road Substation in Holmen, Wisconsin, to the Cardinal Substation in Middleton, Wisconsin. With routing and siting efforts starting in May 2010 and construction completing in December 2018, the 8 ½ years in-between provided the project team with some of the most unique and interesting challenges that designing and constructing a transmission line in the state of Wisconsin has to offer. First, navigating the routing and siting effort to complete the state regulatory process to obtain project approval from the Public Service Commission of Wisconsin. Once project and route approval were received, the detailed design and construction of the line commenced. This paper and presentation will detail some of the more unique challenges the project team had to tackle and what they did to overcome those challenges. These challenges included: considerable variation in terrain from the low-lying lands of south-central Wisconsin to the coulee regions of western Wisconsin; construction adjacent to a major interstate for approximately 100 miles; single, double, and triple circuit configurations; single-pole, three-pole, and H-Frame structure designs; long-span river crossing in excess of 2,200’; direct embed, reinforced concrete, and micropile foundation designs; helicopter, including heavy-lift, construction; DOT communication fiber and railroad signal interference; and planning, scheduling, and sequencing man-power and efforts.
Get full access to this article
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Electrical Transmission and Substation Structures 2022: Innovating for Critical Global Infrastructure
Pages: 24 - 34
Editor: Tim Cashman
ISBN (Online): 978-0-7844-8446-3
Copyright
© 2022 American Society of Civil Engineers.
History
Published online: Sep 20, 2022
Published in print: Sep 20, 2022
Permissions
Request permissions for this article.
Authors
Affiliations
P.E.
Electrical Consultants, Inc. E-mail: [email protected]
P.E.
American Transmission Company. E-mail: [email protected]
P.E., S.E.
Electrical Consultants, Inc. E-mail: [email protected]
American Transmission Company. E-mail: [email protected]
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.