Innovative Dock Mooring Solutions for a Historically Sensitive Area
Publication: Ports 2022
ABSTRACT
Public access to the USS Arizona Memorial was suspended in May 2018 when the anchoring system of the floating dock failed at the location where visitors disembark from navy-operated ferry boats. A new mooring system was designed to effectively hold the dock in position under varying tide levels while limiting the horizontal movement of the dock. The mooring system uses a series of 12 “helical” galvanized steel piles screwed into the seafloor. The floating concrete dock is attached to the piles with constant tension elastic rubber hawsers, integrated with high-strength synthetic rope. Construction for the repair project consisted of demolition and removal of the existing anchor system, installation of the helical piles and elastic mooring system, and in situ load testing of the helical mooring piles. Construction was completed in three months, and the reopening of Hawaii’s USS Arizona Memorial occurred on September 1, 2019, following a 15-month closure.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
ASCE. 2016. Minimum design loads and associated criteria for buildings and other structures, Standard ASCE/SEI 7-16. Reston, VA: ASCE.
Burgess, W., and Kulhawy, F. 1983. Docks, Piers and Wharves: A Design Guide. New York Sea Grant Institute.
Carkin, B., and Kayen, R. 2013. “Settlement of the USS Arizona, Pearl Harbor, Hawaii.”.
Hirata & Associates, Inc. “Soils Investigation, Replace USS Arizona Memorial Dock and Ramp, World War II Valor in the Pacific National Monument.” April 12, 2013.
Hubbell Power Systems. “Helical Anchors and Piles.” Accessed January 5, 2022. https://www.hubbell.com/hubbellpowersystems/en/Products/Power-Utilities/Anchoring-Foundations/Helical-Anchors-Piles/cl/548080.
LaGrone, S. “Tug Moving U.S. Navy Hospital Ship May Have Struck USS Arizona Memorial.” May 27, 2015. US Naval Institute.
Naval Facilities Engineering Command. 2012. Moorings – Unified Facilities Criteria (UFC). US Army Corps of Engineers UFC-4-159-03. Washington, D.C.
Seaflex. “SEAFLEX Mooring System” Accessed January 5, 2022. https://www.seaflex.com/products/seaflex-mooring-system/.
University of Hawaii Sea Grant Program. “What is a King Tide?” Accessed January 5, 2022. https://seagrant.soest.hawaii.edu/coastal-and-climate-science-and-resilience/ccs-projects/what-is-a-king-tide/.
USACE. 1984. Shore Protection Manual. Coastal Engineering Research Center. Fort Belvoir, Va.
Information & Authors
Information
Published In
History
Published online: Sep 15, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.