Design Considerations for a New Marine Oil Terminal at Port of Los Angeles, Berths B238–239
Publication: Ports 2022
ABSTRACT
The Port of Los Angeles (POLA) is replacing the existing Berths 238–239 marine oil terminal (MOT) facilities with a new 1,000-ft long MOT, which will be capable of accommodating Panamax class vessels. The new MOT at Berth 238 will be California Building Code (CBC) Maritime Oil Terminals Engineering and Maintenance Standards (MOTEMS) compliant and consist of a concrete unloading platform, two breasting dolphins, four exterior landside mooring anchors, catwalks, and an access trestle. The unloading platform topside facility will be installed by the tenant, PBF energy, after the new MOT is constructed. This paper addresses key considerations for the selection and design of key components of the new MOT, including the unloading platform deck and foundation, berthing and mooring structures, and quick release hook devices and associated instrumentation. The following areas will be considered in this paper: seismic design, passing vessel and dynamic mooring analysis, and site constraints concerns during construction.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
BS 6349 – Part 4. (1994). Maritime Structures: Code of Practice for Design of Fendering and Mooring System.
CBC (California Building Standards Code). (2019). Chapter 31, Title 24, Marine Oil Terminal Engineering and Maintenance Standards (MOTEMS).
DHI. (2020). MIKE 21 Mooring Analysis, User Manual.
EMI (Earth Mechanics, Inc.). (2006). Port-wide Ground Motion and Palos Verdes Fault Study, Port of Los Angeles, California, Fountain Valley, California, December 2006.
EMI (Earth Mechanics, Inc.). (2020). Geotechnical Design Report for Berths 238-239 Marine Oil Terminal Improvements, Port of Los Angeles, California, April 2020.
MN (Moffatt & Nichol). (2020). PBF Terminal at Port of Los Angles Berth B238-239 MOTEMS Design Wind Recommendations, December 2020.
OCIMF (Oil Companies International Marine Forum). (2018). Mooring Equipment Guidelines, Edition 4.
PIANC. (1995). “Criteria for Movements of Moored Ships in Harbours – A Practical Guide”,. ISBN 2-87223-070-X.
PIANC. (2002). “Guidelines for the Design of Fender Systems”,.
PIANC. (2014). “Harbour Approach Channels Design Guidelines”,.
POLA (Port of Los Angeles). (2010). POLA Code for Seismic Design, Upgrade and Repair of Container Wharves.
SEI (Sea Engineering, Inc.). (2020). Berth 238 Side Scan and Diver Survey.
UFC (Unified Facilities Criteria). (2017). UFC 4-152-01 Design: Piers and Wharves.
Information & Authors
Information
Published In
History
Published online: Sep 15, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.