Staying Ahead of the Curve: Pre-Contract Best Practices for High Value Specialty Projects of Buried Pipelines
Publication: Pipelines 2022
ABSTRACT
Trenchless specialty work carries inherent quality risks that can be managed through proper upfront vetting of contractor qualifications and field experience by requesting specific information to be submitted concurrent with standard bid documents. These submittals with bid may include, but are not limited to, testing describing the repair materials’ physical, mechanical, and environmental qualities, constructor and manufacturer qualifications, draft design approach, site specific safety documentation, etc. Owners, engineers, and consultants benefit from understanding the goals of these submittal requirements and how their requisite placement within the project timeline could affect key project parameters such as installation quality, design robustness, and total budget. In this technical paper, we aim to (1) provide a risk-based weighted approach to bid package evaluations and contractor selection (considering qualifications, price, and schedule); (2) define suggested qualifications to be submitted with bid, and the basis for inclusion within said bid; and (3) discuss an innovative approach for the procurement of high value specialty projects.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
AWWA (American Water Works Association). AWWA C305 CFRP Renewal and Strengthening of PCCP, American Water Works Association, Denver, CO, 2018.
ASTM, Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP), ASTM International, West Conshohocken, PA, 2017.
Awezec, J., Doller, J., and Hughes, P. (2013, March). Developing Model Procurement Documents for Progressive Design-Build Projects [Slides]. WaterDesignBuild.Com. https://waterdesignbuild.com/wp-content/uploads/Procurement-Documents-for-Progressive-DB-Mar-2013.pdf.
Biesiada, M., and Cyphers, R. (2016). Investigate-Design-Build: An Innovative IPD Approach [Slides]. Mishe.Org. https://mishe.org/images/downloads/Conference_2016/investigative_design_build_approach_for_challenging_repair_projects.pdf.
Browne, C. (2021, April 20). A 4 Step Minimum Risk Procurement Strategy. Best Practice Group. https://www.bestpracticegroup.com/procurement-strategy/.
Chinowsky, P. S., and Kingsley, G. A. (2009). An Analysis of Issues Pertaining to Qualifications-Based Selection. American Council of Engineering Companies. Washington, D.C.
Design Build Institute of America. (2022). What is Design Build. https://dbia.org/what-is-design-build/.
Hulsen, D. (2021, September 17). RFP weighted scoring demystified: How-to guide and examples. RFP360. https://rfp360.com/rfp-weighted-scoring-demystified/.
Moore, R., and Stroebl, T. (2021). Align Municipal Procurement Practices With Asset Management and Sustainability Goals. Opflow, 47: 8–9.
NAFSA (National Association of State Facilities Administrators), et al. Integrated Project Delivery for Public and Private Owners. 2010. https://www.agc.org/sites/default/files/Files/Programs%20%26%20Industry%20Relations/IPD%20for%20Public%20and%20Private%20Owners_1.pdf.
Sabaei, D., Erkoyuncu, J., and Roy, R. (2015). A Review of Multi-criteria Decision Making Methods for Enhanced Maintenance Delivery. Procedia CIRP. 37. https://doi.org/10.1016/j.procir.2015.08.086.
Information & Authors
Information
Published In
History
Published online: Jul 28, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.