California’s First Major Vehicular Cable-Stayed Bridge

Publication: Structures Congress 2022

ABSTRACT

Construction of the Gerald Desmond Bridge Replacement Project (GDBRP) in Long Beach, California, has recently been completed. The new bridge is located at the Port of Long Beach and consists of approximately 2.6 km of bridge structure. The approach spans are made up of conventional cast-in-place box girders, while the main span over the Back Channel includes California’s first major vehicular cable-stayed bridge. This signature structure has a 304.8 m main span and 152.4 m back spans. Now that it has been built, the new bridge is the second-tallest cable-stayed bridge in the US, and has the highest vertical clearance of any cable-stayed bridge in the country. The replacement bridge is founded on a total of 352 cast-in-drilled-hole piles that range in size from 1.8 to 2.4 m in diameter. More than 100 reinforced concrete columns of varying heights support the superstructure, with the two towers supporting the main span featuring a hollow 156.9 meter-tall monopole design. The signature cable-stayed bridge span consists of a pair of 1.8 m deep steel edge girders with a box shape cross-section. Framing into the edge girders are variable-depth steel floorbeams with four lines of longitudinal stringers spanning between them. This floorsystem supports the full-depth precast concrete deck panels. The cross-section of the bridge has an out-to-out width of approximately 47.5 m to accommodate three lanes in each direction and emergency lanes on both sides (3.0 m shoulders). Seismic demands on the main span are dissipated with passive dampers at the towers and end bents. The superstructure of the low-level approach spans was built using conventional falsework; however, the high-level approaches were built using a movable scaffolding system (MSS). This project is the first time in the State of California that an MSS was used to build bridge superstructure elements. The MSS had a self-weight of 1.41 million kg. With the load from the concrete, the MSS bore approximately 3.2 million kg, supported by brackets mounted onto the columns. The main-span superstructure was stick-built with help from stiffleg derrick cranes on the deck, and two 178.3 m tall tower cranes, which were the tallest tower cranes currently in use at the time on any infrastructure project in the US. This paper will provide a general overview of the project from the program manager/construction manager perspective, and describe some of its key design and construction innovations and challenges. In addition, design-build lessons learned during the construction phase will be summarized.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Cunming, M., and Shaopeng, L. “Wind Tunnel Investigation on Gerald Desmond Bridge Replacement, Sectional Model Testing: ”, Research Center for Wind Engineering at Southwest Jiaotong University, Chengdu, Sichuan Province, China, 2013, 80 pp.
Cunming, M., and Shaopeng, L. “Wind Tunnel Investigation on Gerald Desmond Bridge Replacement, Aeroelastic Model Wind Tunnel Test: Final Report”, Research Center for Wind Engineering at Southwest Jiaotong University, Chengdu, Sichuan Province, China, 2013, 85 pp.

Information & Authors

Information

Published In

Go to Structures Congress 2022
Structures Congress 2022
Pages: 135 - 147

History

Published online: Apr 18, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Michael J. Borzok, M.ASCE [email protected]
P.E.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$80.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$80.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share