Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation

Publication: Construction Research Congress 2022

ABSTRACT

Road projects around the world are widely affected by the cost overrun phenomenon. BIM can greatly contribute to cost overrun mitigation; however, the BIM adoption in road projects is limited compared to building projects. Besides, studies focused on analyzing the impact of BIM on mitigating cost overruns in road projects are lacking. Therefore, this study presents a review of road projects with BIM implementation, in which the BIM benefits that can contribute to the cost overrun mitigation are analyzed. The research method is composed of the following stages: (1) a systematic review is performed; (2) relevant studies are chosen based on inclusion/exclusion criteria; (3) qualitative evidence is categorized; (4) qualitative evidence is analyzed with a set of experts; and (5) contributions are summarized. A total of 21 road projects were studied, in which a set of BIM implementation benefits were identified. Thus, a professional workshop analyzed the interactions between BIM benefits and the main cost overruns causative factors. The findings indicate that the BIM implementation in road projects contributes to mitigating cost overruns factors, such as inadequate project planning, design changes, failures in design, project scope changes, late decision-making by the owner, and others. The three BIM benefits that most influence the mitigation of cost overruns factors in road projects are: (1) better coordination and collaboration among stakeholders; (2) improvements in decision-making processes; and (3) obtaining accurate, integrated, and detailed information.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Akob, Z., Abang, M., and Abd, A. (2019). “Deployment of GIS + BIM in the construction of Pan Borneo Highway Sarawak, Malaysia.” IOP Conference Series: Materials Science and Engineering.
Amoatey, C., Ameyaw, A., Adaku, E., and Famiyeh, S. (2015). “Analysing delay causes and effects in Ghanaian state housing construction projects.” International Journal of Managing Projects in Business, 8(1), 198–214.
Aziz, R. F., and Abdel-Hakam, A. A. (2016). “Exploring delay causes of road construction projects in Egypt.” Alexandria Engineering Journal, Faculty of Engineering, Alexandria University, 55(2), 1515–1539.
Aziz, Z., Riaz, Z., and Arslan, M. (2017). “Leveraging BIM and Big Data to deliver well maintained highways.” Facilities, 35(13/14), 818–832.
Bhandari, S., and Hallowell, M. (2021). “Identifying and Controlling Biases in Expert-Opinion Research: Guidelines for Variations of Delphi, Nominal Group Technique, and Focus Groups.” Journal of Management in Engineering, 37(3), 04021015.
Biancardo, A., Capano, A., Guerra de Oliveira, S., and Tibaut, A. (2020a). “Integration of BIM and procedural modeling tools for road design.” Infrastructures, 5(4), 1–18.
Biancardo, A., Viscione, N., Cerbone, A., and Dessì, E. (2020b). “BIM-Based Design for Road Infrastructure: A Critical Focus on Modeling Guardrails and Retaining Walls.” Infrastructures, 5(7), 59.
Bordat, C., McCullouch, B. G., Labi, S., and Sinha, K. (2004). “An analysis of cost overruns and time delays of INDOT projects.” Transportation Research, (December), 193.
Borrmann, A., Hochmuth, M., König, M., Liebich, T., and Singer, D. (2016). “Germany’s governmental BIM initiative – Assessing the performance of the BIM pilot projects.” 16th International Conference on Computing in Civil and Building Engineering, 871–878.
Cantarelli, C. C., Van Wee, B., Molin, E. J. E., and Flyvbjerg, B. (2012). “Different cost performance: Different determinants?. The case of cost overruns in Dutch transport infrastructure projects.” Transport Policy, Elsevier, 22, 88–95.
Catalão, F. P., Cruz, C. O., and Sarmento, J. M. (2019). “The determinants of cost deviations and overruns in transport projects, an endogenous models approach.” Transport Policy, Elsevier Ltd, 74(December 2018), 224–238.
Chan, D., Olawumi, T., and Ho, A. (2019). “Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: The case of Hong Kong.” Journal of Building Engineering, Elsevier Ltd, 25, 100764.
Chong, H. Y., Lopez, R., Wang, J., Wang, X., and Zhao, Z. (2016). “Comparative analysis on the adoption and use of BIM in road infrastructure projects.” Journal of Management in Engineering, 32(6), 1–13.
Costin, A., Adibfar, A., Hu, H., and Chen, S. S. (2018). “Building Information Modeling (BIM) for transportation infrastructure – literature review, applications, challenges, and recommendations.” Automation in Construction, Elsevier, 94(July), 257–281.
Džumhur, S., Ljevo, Ž., and Marić, J. (2018). “BIM Project Execution Planning Suited for Road Infrastructure Pilot Project in Bosnia and Herzegovina.” Lecture Notes in Networks and Systems, 28(February 2014), 560–570.
Eastman, C., Liston, K., Sacks, R., and Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and constractors. Jhon Wiley & Sons Inc, New Jersey.
Herrera, R. F., Mourgues, C., Alarcón, L. F., and Pellicer, E. (2021). “Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects.” Journal of Construction Engineering and Management, 147(4).
Herrera, R. F., Sánchez, O., Castañeda, K., and Porras, H. (2020). “Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis.” Applied Sciences, 10(16), 5506.
Kohlböck, B., Griesser, E., Hillisch, S., Birgmann, H., and Fasching, A. (2018). “The BIM pilot project Köstendorf – Salzburg.” Geomechanik und Tunnelbau, 11(4), 325–334.
Kumar, B., Cai, H., and Hastak, M. (2017). “An assessment of benefits of using BIM on an infrastructure project.” International Conference on Sustainable Infrastructure 2017, 88–95.
Lee, S. S., Kim, K. T., Tanoli, W. A., and Seo, J. W. (2020). “Flexible 3D Model Partitioning System for nD-Based BIM Implementation of Alignment-Based Civil Infrastructure.” Journal of Management in Engineering, 36(1), 04019037.
Love, P., Sing, C., Carey, B., and Kim, J. (2014). “Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects.” Journal of Infrastructure Systems, 21(2), 1–10.
Mawlana, M., Vahdatikhaki, F., Doriani, A., and Hammad, A. (2015). “Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects.” Automation in Construction, Elsevier B.V., 60, 25–38.
O’Brien, W. J., Gau, P., Schmeits, C., Goyat, J., and Khwaja, N. (2012). “Benefits of three-and four-dimensional computer-aided design model applications for review of constructability.” Transportation Research Record, (2268), 18–25.
Rwakarehe, E. E., and Mfinanga, D. A. (2014). “Effect of inadequate design on cost and time overrun of road construction projects in Tanzania.” Journal of Construction Engineering and Project Management, 4(1), 15–28.
Sacks, R., Dave, B., Koskela, L., and Owen, R. (2009). “Analysis framework for the interaction between lean construction and Building Information Modelling.” Proceedings of IGLC17: 17th Annual Conference of the International Group for Lean Construction, 221–234.
Sacks, R., Koskela, L., Bhargav, D., and Owen, R. (2010). “Interaction of Lean and Building Information Modeling in Construction.” Journal of Construction Engineering and Management, 136(9), 968–980.
Tezel, A., and Aziz, Z. (2017). “Visual management in highways construction and maintenance in England.” Engineering, Construction and Architectural Management, 24(3), 486–513.
Tolmer, C. E., Castaing, C., Diab, Y., and Morand, D. (2017). “Adapting LOD definition to meet BIM uses requirements and data modeling for linear infrastructures projects: using system and requirement engineering.” Visualization in Engineering, Visualization in Engineering, 5(1), 1–18.
Vitásek, S., and Matějka, P. (2017). “Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic.” IOP Conference Series: Materials Science and Engineering, 236(1), 012110.
Zhang, J., Zhao, C., Li, H., Huijser, H., and Skitmore, M. (2020). “Exploring an Interdisciplinary BIM-Based Joint Capstone Course in Highway Engineering.” Journal of Civil Engineering Education, 146(3), 05020004.
Zhao, L., Liu, Z., and Mbachu, J. (2019). “Highway alignment optimization: An integrated BIM and GIS approach.” ISPRS International Journal of Geo-Information, 8(4), 1–28.

Information & Authors

Information

Published In

Go to Construction Research Congress 2022
Construction Research Congress 2022
Pages: 472 - 482

History

Published online: Mar 7, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Omar Sánchez [email protected]
1Professor, Dept. of Civil Engineering, Universidad Católica de Colombia, Bogotá D.C., Colombia. Email: [email protected]
Karen Castañeda [email protected]
2Ph.D. Student, Dept. of Civil Engineering, Universidad Industrial de Santander, Bucaramanga, Santander. Email: [email protected]
Rodrigo F. Herrera [email protected]
3Professor, School of Civil Engineering, Pontificia Universidad Católica de Valparaíso, Valparaíso, Chile. Email: [email protected]
Eugenio Pellicer [email protected]
4Professor, School of Civil Engineering, Universitat Politècnica de València, Valencia, Spain. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share