Chapter
Mar 7, 2022

Selection Factors for Progressive Design-Build Delivery Method

Publication: Construction Research Congress 2022

ABSTRACT

One of the early owners’ decisions that have significant impact on project success is selecting a suitable project delivery method. One of emerging project delivery method that gaining high interest in the past few years is Progressive Design Build (PDB). However, limited knowledge is available regarding circumstances under which one should select PDB as a suitable delivery method for a project. Therefore, this study determined the relative importance of the variables that impact owners’ decision to select PDB as a delivery method for a project. To achieve this goal, the research team developed and distributed an online questionnaire among project managers who were involved in PDB projects, and responses to it were collected to measure the importance of factors that affect owners’ decisions to select PDB as a suitable delivery method. Within academia, this study establishes an early empirical database of the PDB selection factors. Within industry, this study enhances the decision-making process by providing guidelines for using PDB as a delivery method based on owner and project characteristics.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Alleman, D., and Tran, D. (2020). “Challenges of implementing progressive design-build in highway construction projects.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 04519036.
Al Khalil, M. I. (2002). “Selecting the appropriate project delivery method using AHP.” International Journal of Project Management, 20(6), 469–474.
Awezec, J., Doller, J., and Hughes, P. (2013). “Procurement Documents for Progressive Design-Build Projects,” Presented at DBIA Design-build for Water/Wastewater Conference, Orlando, FL, 2013. https://waterdesignbuild.com/wp-content/uploads/Procurement-Documents-for-Progressive-DB-Mar-2013.pdf. Accessed January, 29, 2021.
Beard, J., Loulakis, M. C., and Wundram, E. C. (2001). Design-build: Planning through development, McGraw-Hill, New York.
Clark, L. (2016). “What’s So Progressive About Progressive Design-Build. Water Design-Build Council,” WDBC Blog, 2016, http://info.waterdesignbuild.com/blog/whats-so-progressive-about-progressive-design-build-0, Accessed January, 29, 2021.
Chen, Y. Q., Liu, J. Y., Li, B., and Lin, B. (2011). “Project delivery system selection of construction projects in China.” Expert Systems with Applications, 38(5), 5456–5462.
DBIA (Design-Build Institute of America). (2017). “Progressive Design-Build; A Design Build Done Right.” State Advocacy Washington, D.C. https://dbia.org/wp-content/uploads/2018/05/Primer-Progressive-Design-Build.pdf, Accessed January, 29, 2021.
Gordon, C. M. (1994). “Choosing Appropriate Construction Contracting Method.” Journal of Construction Engineering and Management, 120(1), 196–210.
Gransberg, D. D., and Molenaar, K. R. (2019). “Critical Comparison of Progressive Design-Build and Construction Manager/General Contractor Project Delivery Methods.” Transportation Research Record: Journal of the Transportation Research Board, 2673(1), 261–268.
Ling, F. Y. Y., and Liu, M. (2004). “Using neural network to predict performance of design-build projects in Singapore.” Building and Environment, 39(10), 1263–1274.
Loulakis, M. C. (2013). Progressive Design-Build. Water Finance and Management, 2013, https://waterfm.com/progressive-designbuild/. Accessed January, 29, 2021.
Loulakis, M. C. (2016). “Progressive Design-Build: Examining the Structure, Procurement and Contracting Principles.” Presented at Mid-Atlantic Chapter DBIA, Washington, DC, 2016. Accessed January, 29, 2021.
Mafakheri, F., Dai, L., Slezak, D., and Nasiri, F. (2007). “Project Delivery System Selection under Uncertainty: Multicriteria Multilevel Decision Aid Model.” Journal of Management in Engineering, 23(4), 200–206.
Mahdi, I. M., and Alreshaid, K. (2005). “Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP).” International Journal of Project Management, 23(7), 564–572.
Molenaar, K. R., and Songer, A. D. (1998). “Model for Public Sector Design-Build Project Selection.” Journal of Construction Engineering and Management, 124(6), 467–479.
McManus, M. (2017). “DBB, DB or PPP? How to Pick the Best Project Delivery Method.” SEH®, Text, http://www.sehinc.com/news/dbb-db-or-ppp-how-pick-best-project-delivery-method. Accessed January, 29, 2021.
Qiang, M., Wen, Q., Jiang, H., and Yuan, S. (2015). “Factors governing construction project delivery selection: A content analysis.” International Journal of Project Management, 33(8), 1780–1794.
Oyetunji, A. A., and Anderson, S. D. (2006). “Relative Effectiveness of Project Delivery and Contract Strategies.” Journal of Construction Engineering and Management, 132(1), 3–13.
Thanh Luu, D., Ng, S. T., and Eng Chen, S. (2003). “Parameters governing the selection of procurement system – an empirical survey.” Engineering, Construction and Architectural Management, 10(3), 209–218.
Touran, A., Gransberg, D. D., Molenaar, K. R., and Ghavamifar, K. (2011). “Selection of Project Delivery Method in Transit: Drivers and Objectives.” Journal of Management in Engineering, 27(1), 21–27.
Tran, D. Q., Harper, C. M., Molenaar, K. R., Haddad, N. F., and Scholfield, M. M. (2013). “Project Delivery Selection Matrix for Highway Design and Construction.” Transportation Research Record: Journal of the Transportation Research Board, 2347(1), 3–10.
Xia, B., Molenaar, K., Chan, A., Skitmore, M., and Zuo, J. (2013). “Determining Optimal Proportion of Design in Design-Build Request for Proposals.” Journal of Construction Engineering and Management, 139(6), 620–627.

Information & Authors

Information

Published In

Go to Construction Research Congress 2022
Construction Research Congress 2022
Pages: 244 - 253

History

Published online: Mar 7, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Ruqaya Alameri, A.M.ASCE [email protected]
1Graduated Master Student, Dept. of Civil, Environmental, and Infrastructure Engineering, George Mason Univ., Fairfax, VA. Email: [email protected]
Behzad Esmaeili, Aff.M.ASCE [email protected]
2Assistant Professor, Dept. of Civil, Environmental, and Infrastructure Engineering, George Mason Univ., Fairfax, VA. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Data-Driven Analysis of Progressive Design Build in Water and Wastewater Infrastructure Projects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13824, 150, 1, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share