Information Exchange for Supporting BIM to Robotic Construction
Publication: Construction Research Congress 2022
ABSTRACT
In the past, the construction industry has been slow to adopt new technology. There has been a rapid expansion of technologies, often referred to as Industry 4.0, to aid in the use of automation. One challenge paralleling these new technologies is implementing how a robot interprets design information, specifically information from a Building Information Model (BIM). This paper presents a method for identifying and transforming information from BIM to support robotic material placement on the construction site. This research will include a review of what information can be directly extracted from the model and what must be supplemented to the model for the robot to perform defined tasks within a construction site. The construction sites’ dynamic nature poses multiple challenges that must be addressed for the information extracted from a model to be used by a robot in daily construction operations. This research also identifies barriers and limitations based upon current practice, such as different levels of development or model content as well as needed precision within the information provided for a mobile robot to complete a defined task.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
About the Construction sector. (2020). Retrieved from https://www.bls.gov/iag/tgs/iag23.htm.
Barbosa, F., Woetzel, J., Mischke, J., João Ribeirinho, M., Sridhar, M., Parsons, M., Bertram, N., and Brown, S. (2017). REINVENTING CONSTRUCTION: A ROUTE TO HIGHER PRODUCTIVITY. Retrieved from https://www.mckinsey.com/~/media/McKinsey/Industries/CapitalProjectsandInfrastructure/OurInsights/Reinventing construction through a productivityrevolution/MGI-Reinventing-construction-A-route-to-higher-productivity-Full-report.ashx.
Bedrick, J., Reinhardt, J., and Ikerd, W. (2020, December). Level of Development Specification. BIMForum. https://bimforum.org/lod/.
Bock, T. (2015). The future of construction automation: Technological disruption and the upcoming ubiquity of robotics. Automation in Construction, 59, 113–121.
BuildingSMART®International. “Information Delivery Manual Guide to Components and Development Methods,” Ver.1.2,[online]2010Available at: https://standards.building smart.org/documents/IDM/IDM_guide-CompsAndDevMethods-IDMC_004-v1_2.pdf.
Employment by major industry sector. (2019, September 4). Retrieved from https://www.bls.gov/emp/tables/employment-by-major-industry-sector.htm\.
Eastman, C. M., Jeong, Y. S., Sacks, R., and Kaner, I. (2010). Exchange model and exchange object concepts for implementation of national BIM standards. Journal of Computing in Civil Engineering, 24(1), 25–34.
Everett, J. G., and Slocum, A. H. (1994). Automation and robotics opportunities: construction versus manufacturing. Journal of construction engineering and management, 120(2), 443–452.
Follini, C., Magnago, V., Freitag, K., Terzer, M., Marcher, C., Riedl, M., Giusti, A., and Matt, D. T. (2021). BIM-Integrated Collaborative Robotics for Application in Building Construction and Maintenance. Robotics, 10(1), 2.
Karimi, S., Iordanova, I., and St-Onge, D. (2021). An ontology-based approach to data exchanges for robot navigation on construction sites.
Kim, S., Peavy, M., Huang, P. C., and Kim, K. (2021). Development of BIM-integrated construction robot task planning and simulation system. Automation in Construction, 127, 103720.
Lasi, H., Fettke, P., Kemper, H. G., Feld, T., and Hoffmann, M. (2014). Industry 4.0. Business & information systems engineering, 6(4), 239–242.
Messner, J., Anumba, C., Dubler, C., Goodman, S., Kasprzak, C., Kreider, R., Leicht, R., Saluja, C., Zikic, N., and Bhawani, S. (2021, March 17). BIM Project Execution Planning Guide, Version 3.0. BIM Project Execution Planning Guide Version 30. https://psu.pb.unizin.org/bimprojectexecutionplanning/.
Pinheiro, S., Wimmer, R., O’Donnell, J., Muhic, S., Bazjanac, V., Maile, T., Frisch, J., and van Treeck, C. (2018). MVD based information exchange between BIM and building energy performance simulation. Automation in Construction, 90, 91–103.
Ramaji, I. J., and Memari, A. M. (2015). Information exchange standardization for BIM application to multi-story modular residential buildings. In AEI 2015 (pp. 13–24).
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., and Gao, X. (2020). BIM assisted Building Automation System information exchange using BACnet and IFC. Automation in Construction, 110, 103049.
Information & Authors
Information
Published In
History
Published online: Mar 7, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.