A Framework for Automated Daily Construction Progress Monitoring Leveraging Unordered Site Photographs
Publication: Computing in Civil Engineering 2021
ABSTRACT
The exponential growth of on-site visual data and the advent of computer vision techniques have invigorated automated construction progress monitoring. However, the state-of-the-art automated progress monitoring methods are still insufficient for the daily monitoring of construction activities. As-built 3D point clouds at the construction site are captured on a specific time interval and require a considerable amount of processing time. Between the intervals, the daily site progress status is often not recorded. Additionally, existing methods report the progress status of any building element in binary form (i.e., completed or not completed) without reporting partial completion percentages. In the construction phase, although BIM models created can help progress monitoring, some schedule activities are usually not modeled in BIM. Automated progress monitoring of these activities is still challenging. To overcome these methodological challenges, this study proposes a novel framework for automated daily construction progress monitoring incorporating image localization and deep learning-based semantic segmentation. The preliminary results show that the framework can successfully detect daily progress with a partial completion percentage.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Braun, A., Tuttas, S., Borrmann, A., and Stilla, U. (2015a). “A concept for automated construction progress monitoring using BIM-based geometric constraints and photogrammetric point clouds.” Journal of Information Technology in Construction, 20(January), 68–79.
Braun, A., Tuttas, S., Borrmann, A., and Stilla, U. (2015b). “Automated progress monitoring based on photogrammetric point clouds and precedence relationship graphs.” 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings.
Braun, A., Tuttas, S., Borrmann, A., and Stilla, U. (2020). “Improving progress monitoring by fusing point clouds, semantic data and computer vision.” Automation in Construction, Elsevier, 116(May), 103210.
Golparvar-Fard, M., Peña-Mora, F., and Savarese, S. (2011). “Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry.” Journal of Construction Engineering and Management, 137(12), 1099–1116.
Golparvar Fard, M., Feniosky, P. M., and Savarese, S. (2009). “D4AR-A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication.” Electronic Journal of Information Technology in Construction, 14(June), 129–153.
Han, K., Degol, J., and Golparvar-Fard, M. (2018). “Geometry- and Appearance-Based Reasoning of Construction Progress Monitoring.” Journal of Construction Engineering and Management, 144(2), 04017110.
Han, K. K., and Golparvar-Fard, M. (2015). “Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs.” Automation in Construction, Elsevier B.V., 53, 44–57.
Hardin, B., and McCool, D. (2015). BIM and Construction Management: Proven Tools, Methods, and Workflows. Wiley.
Hui, L., Park, M.-W., and Brilakis, I. (2015). “Automated Brick Counting for Façade Construction Progress Estimation.” Journal of Computing in Civil Engineering, 29(6), 04014091.
Kim, C., Kim, C., and Son, H. (2013). “Automated construction progress measurement using a 4D building information model and 3D data.” Automation in Construction, Elsevier B.V., 31, 75–82.
Kopsida, M., and Brilakis, I. (2020). “Real-Time Volume-to-Plane Comparison for Mixed Reality–Based Progress Monitoring.” Journal of Computing in Civil Engineering, 34(4), 04020016.
Kropp, C., Koch, C., and König, M. (2018). “Interior construction state recognition with 4D BIM registered image sequences.” Automation in Construction, Elsevier, 86(November 2017), 11–32.
Lin, J. J., Lee, J. Y., and Golparvar-Fard, M. (2019). “Exploring the Potential of Image-Based 3D Geometry and Appearance Reasoning for Automated Construction Progress Monitoring.” Computing in Civil Engineering 2019, 162–170.
Martinez, P., Barkokebas, B., Hamzeh, F., Al-Hussein, M., and Ahmad, R. (2021). “A vision-based approach for automatic progress tracking of floor paneling in offsite construction facilities.” Automation in Construction, Elsevier B.V., 125(August 2020), 103620.
Puri, N., and Turkan, Y. (2020). “Bridge construction progress monitoring using lidar and 4D design models.” Automation in Construction, Elsevier, 109(September 2019), 102961.
Rahimian, F. P., Seyedzadeh, S., Oliver, S., Rodriguez, S., and Dawood, N. (2020). “On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning.” Automation in Construction, Elsevier, 110(November 2019), 103012.
Sarlin, P. E., Cadena, C., Siegwart, R., and Dymczyk, M. (2019). “From coarse to fine: Robust hierarchical localization at large scale.” Proceedings of the IEEE Computer Society Conference on Computer Vision and Pattern Recognition, IEEE, 2019-June, 12708–12717.
Son, H., Kim, C., and Kim, C. (2012). “Automated Color Model–Based Concrete Detection in Construction-Site Images by Using Machine Learning Algorithms.” Journal of Computing in Civil Engineering, 26(3), 421–433.
Son, H., Kim, C., and Kwon Cho, Y. (2017). “Automated Schedule Updates Using As-Built Data and a 4D Building Information Model.” Journal of Management in Engineering, 33(4), 04017012.
Turkan, Y., Bosche, F., Haas, C. T., and Haas, R. (2012). “Automated progress tracking using 4D schedule and 3D sensing technologies.” Automation in Construction, Elsevier B.V., 22, 414–421.
Wang, Z., Zhang, Q., Yang, B., and Wu, T. (2021). “Vision-Based Framework for Automatic Progress Monitoring of Precast Walls by Using Surveillance Videos during the Construction Phase.” 35(1).
Yang, J., Park, M. W., Vela, P. A., and Golparvar-Fard, M. (2015). “Construction performance monitoring via still images, time-lapse photos, and video streams: Now, tomorrow, and the future.” Advanced Engineering Informatics, Elsevier Ltd, 29(2), 211–224.
Yuan, L., Guo, J., and Wang, Q. (2020). “Automation in Construction Automatic classification of common building materials from 3D terrestrial laser scan data.” Automation in Construction, Elsevier, 110(July 2019), 103017.
Information & Authors
Information
Published In
History
Published online: May 24, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.