Research on the Pricing of PPP Project of Waste Incineration Power Generation
Publication: ICCREM 2021
ABSTRACT
Concession pricing research is an important part of concession decision-making for waste incineration power generation PPP projects. Therefore, based on the analysis of the factors influencing the pricing of such projects, this paper establishes a system dynamics model, calculates the pricing range of waste incineration treatment under the reasonable internal rate of return, and determines the satisfactory waste incineration pricing scheme of the government, social capital, and the public combined with the multi-objective optimization model. The model is applied to a waste incineration power generation PPP project to analyze the price adjustment scheme when the operation cost and waste treatment volume change. It is found that the change of waste treatment volume has a great impact on the unit price of waste treatment, which provides a basis for decision makers to determine the feasibility of the project and formulate a reasonable concession price of waste incineration power generation project.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Chen, R. Y. (2013). “Determination of price adjustment formula of treatment fee for BOT project of garbage power generation.” Energy Saving of Nonferrous Metallurgy, 4(03), 46–48. (in Chinese).
Chen, Q., Shen, G., Xue, F., and Xia, B. (2017). “Real options model of toll-adjustment mechanism in concession contracts of toll road projects.” Journal of Management in Engineering, 34(1), 04017040.
Kerf, M., Gray, R. D., Irwin, T., Levesque, C., Taylor, R., and Klein, M. (1998). Concessions for infrastructure: a guide to their design and award, The World Bank, Washington, D.C.
Lu, W. (2018) Study on Treatment Fee Pricing of Waste Incineration Power Generation PPP Project. Xi’an University of Architecture and Technology, Shanxi, China, 1–102. (in Chinese).
Song, J. B., Song, D. R., and Sun, Y. (2012). “Key risks of BOT project of waste incineration power generation: multi case study.” Management Review, 6(09), 40–48. (in Chinese).
Song, J. B., Jin, L. L., and Fu, Y. N. (2014). “Linkage adjustment decision between toll price and concession period of highway BOT project.” Systems Engineering-Theory & Practice, 5(08), 2045–2053. (in Chinese).
Wei, H. M., and Lu, W. (2018). “Discussion on treatment fee pricing of waste incineration power generation PPP project-quantitative analysis based on risk management.” Finance and Accounting Monthly, 2(16), 91–97. (in Chinese).
Xia, H. Y. (2020). Research on Pricing Mechanism of Waste Incineration Power Generation Project Based on PPP Mode. Zhengzhou University, Henan, China, 1–90. (in Chinese).
Yan, W. X., Xu, M., Hu, P., Ma, M. L., and Liu, Y. (2021). “Study on the price adjustment mechanism of PPP project franchise based on system dynamics.” Journal of Zhejiang Sci-tech University, 6, 1–9. (in Chinese).
Yao, Z. F., Xu, Y. L., and Gong, S. T. (2017). “Study on the concession pricing of PPP waste incineration power generation project: based on the theory of system dynamics.” Price: Theory & Practice, 4(04), 132–135. (in Chinese).
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Published online: Dec 9, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.