Study on Strategy of Risk Redistribution of Tender Offer
Publication: ICCREM 2021
ABSTRACT
Considering the importance of the construction and management of the project by the contractor of the bidding quotation team, first, on the basis of identifying the contractor’s redistribution risk list, conduct a questionnaire survey on the risk factors in the contractor’s redistribution risk list; then, the contractor’s possible impact on the importance of the risk and the frequency of risk occurrence are evaluated, and the quadrant distribution diagram of the contractor’s redistribution risk importance degree is drawn; finally, the risk control flow chart is used to describe the contractor’s risk control process during the construction process. The risk in tender offer is a constantly changing factor, only theoretical research and model-building analysis is far from enough. Through empirical analysis combined with data, this paper objectively evaluates the influence degree of each factor that affects the risk redistribution of tender offer, and then puts forward corresponding countermeasures and suggestions, so as to minimize the risk of contractor’s tender offer to a certain extent.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
ANDI. (2006). “The importance and allocation of risks in Indonesian construction projects.” Construction Management and Economics, 24, 69–80.
Liu, J. (2006). “Quantitative study on comprehensive unit price risk.” Sichuan Building Science Research, 04, 187–189. (in Chinese).
Ren, Y. L., and Tang, D. H. (2006). “Research on the support vector machine method for determining the high rate of bid quotation.” Science and Technology Management Research, 11, 237–241. (in Chinese).
Wang, J. Y., and Liu, D. (2012). “Risk management analysis and countermeasures of overseas EPC general contracting project.” Power Plant Systems Engineering, 1, 65–66. (in Chinese).
Yu, J., and Li, W. Q. (2009). “Risk analysis of bid quotation under bill of quantity mode.” Journal of Southwest Normal University (Natural Science Edition), 06, 170–173. (in Chinese).
Yu, J., and Li, W. Q. (2009). “Risk analysis of bid quotation under bill of quantity mode.” Journal of Southwest Normal University (Natural Science Edition), 06, 170–173. (in Chinese).
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Published online: Dec 9, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.