Key Risk Factors Identification for PPP Waste-to-Energy Incineration Projects
Publication: ICCREM 2021
ABSTRACT
With the increasing contradiction between economic development and resource constraints, using waste-to-energy (WTE) incineration can generate good economic and environmental benefits. However, due to the longer concession period and high-external uncertainties, the risk events of public-private-partnership (PPP) WTE incineration projects frequently occur, resulting in serious negative impacts on current social and economic development. Therefore, it is vitally important to identify the key risk factors of PPP WTE incineration projects. First, based on work-breakdown-structure (WBS) and organization-breakdown-structure (OBS), the project life cycle risk list of PPP WTE incineration projects was constructed. Then, the expert scoring method was used to evaluate the influence of risk factors. Finally, combining fuzzy and DEMATEL methods, the endogenous relationships among the risk factors were found, and the key risk factors of PPP WTE incineration projects were identified, which provides a reference for risk management of PPP WTE incineration projects.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Chen, C., Wang, L., and Fan, M. H. (2018). “On the risk-oriented audit of PPP waste-to-energy incineration project.” Monthly Accounting Journal, (16), 159–164. (in Chinese).
Denison, R. A., and Silbergeld, E. K. (1988). “Risks of municipal solid waste incineration: An environmental perspective.” Risk Analysis, 8(3), 343–355.
Qiang, M. W., Shang, D. F., and Lu, M. (2019). “Life cycle safety risk identification system of utility tunnel.” Journal of Civil Engineering and Management, 36(05), 40–44+55. (in Chinese).
Song, J. B., Song, D. R., and Yan, S. (2012). “Key risks of BOT waste-to-energy incineration projects: a multi-case study.” Management Review, 24(09), 40–48. (in Chinese).
Wang, L. G., and Zhan, X. Q. (2017). “Critical risk factors in PPP waste-to-energy incineration projects.” International Journal of Architecture, Engineering and Construction, 6(2), 55–69.
Wei, H. M., and Lu, W. (2018). “Discussion on the treatment fee pricing of PPP waste-to-energy incineration projects-quantitative analysis based on risk management.” Accounting Monthly, 7(16), 91–97. (in Chinese).
Wu, W. W., and Lee, Y. T. (2007). “Developing global managers’ competencies using the fuzzy DEMATEL method.” Expert Systems with Applications, 32(2), 499–507.
Wu, Y., Xu, C., and Li, L. (2018). “A risk assessment framework of PPP waste-to-energy incineration projects in China under 2-dimension linguistic environment.” Journal of Cleaner Production, 183(10), 602–617.
Xiang, M. D., Yang L., and Yu, Y. J. (2019). “Site selection of waste-to-energy incineration plant based on health risk assessment.” China Environmental Science, 33(01), 165–171. (in Chinese).
Zhao, R., Cai, B. Y., Wang, X. Q., and Yang, Q. Y. (2018). “Research on public risk perception of waste-to-energy incineration project in operation period.” Journal of Southwest Jiaotong University (Social Science Edition), 19(04), 116–121. (in Chinese).
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Published online: Dec 9, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.