What’s in Your Pipe? Quality Management for 100-Year Life Raw Water Pipeline
Authors: Matt Gaughan [email protected], Robert Allen [email protected], Charles Cameron [email protected], Bill Fields [email protected], Shelly Hattan [email protected], Coy Veach [email protected], and Ed Weaver [email protected]Author Affiliations
Publication: Pipelines 2020
ABSTRACT
The Tarrant Regional Water District (TRWD) with the City of Dallas Water Utilities (DWU), are currently engaged in the planning, design, and implementation of a 350 MGD raw water transmission system, which will run across north central Texas from Lake Palestine to Lake Benbrook, with connections to Cedar Creek Reservoir, Richland Chambers Reservoir, and a Dallas delivery point. Collectively, the system consists of approximately 145 mi of 84- to 108-in. pipeline, a 5-mi 120-in. diameter tunnel, six 100-350 MGD pump stations, one 450 MG balancing reservoir, and ancillary facilities. The program developed by TRWD to accomplish these improvements is called the integrated pipeline project (IPL). The IPL program consists of dozens of projects from design phase to equipment pre-purchases and construction. To manage these myriad projects, a standard Quality Management approach was adopted to ensure individual projects meet overall program goals. Starting in 2013 and continuing to present, Phases 1 and 2 of IPL Construction consist of 17 construction contracts (80 mi of 84”–108” pipeline, three pressure reducing stations, two pump stations, a balancing reservoir, etc.) and nine equipment pre-purchase packages. This includes nine different contractors, 13 pipe and equipment suppliers and numerous subcontractors, design engineers, and consultants. To provide consistent, high quality finished product to the Owner, significant quality management measures were essential for this project. This paper will discuss quality management processes, decisions, and lessons learned focused on pipe design, manufacturing, and installation for this interesting project.
Get full access to this article
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Pipelines 2020
Pages: 309 - 321
Editors: J. Felipe Pulido, OBG, Part of Ramboll and Mark Poppe, Brown and Caldwell
ISBN (Online): 978-0-7844-8320-6
Copyright
© 2020 American Society of Civil Engineers.
History
Published online: Aug 6, 2020
Permissions
Request permissions for this article.
Authors
Affiliations
Plus Six Engineering, Grapevine, TX. Email: [email protected]
Freese and Nichols, Inc., Fort Worth, TX. Email: [email protected]
Caledonia Construction Management, Carrolton, TX. Email: [email protected]
Accurate Inspection, Inc., Thornton, CO. Email: [email protected]
Tarrant Regional Water District, Fort Worth, TX. Email: [email protected]
Freese and Nichols, Inc., Fort Worth, TX. Email: [email protected]
Tarrant Regional Water District, Fort Worth, TX. Email: [email protected]
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.