How Innovative and Adaptive Solutions Were Used to Solve Challenges Faced by Contra Costa Water District’s Canal Replacement Project

Publication: Pipelines 2020

ABSTRACT

Contra Costa Water District (District) has worked since 2006 to replace approximately 21,000 ft of unlined canal with a 10-foot diameter concrete pipeline. Drivers for the project include increased flood protection and public safety, as well as protection of water quality from groundwater intrusion. If constructing a 10-ft diameter pipeline wasn’t challenging enough, this project faced a number of technical and logistical challenges encountered along the way, including stringent regulatory requirements, unsuitable soft ground conditions, and large material import requirements. Leveraging the broad experience of project partners and applying adaptive approaches to project challenges, the first four of the project’s five segments have been successfully constructed, totaling approximately 13,000 ft.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2020
Pipelines 2020
Pages: 210 - 218
Editors: J. Felipe Pulido, OBG, Part of Ramboll and Mark Poppe, Brown and Caldwell
ISBN (Online): 978-0-7844-8320-6

History

Published online: Aug 6, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Colin Dudley [email protected]
P.E.
Brown and Caldwell, Walnut Creek, CA. Email: [email protected]
Peter Bellows [email protected]
P.E.
Brown and Caldwell, Walnut Creek, CA. Email: [email protected]
Peter Stabb
P.E.
Contra Costa Water District, Concord, CA.
Sarah La Vallee
P.E.
Contra Costa Water District, Concord, CA.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$130.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$130.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share