ABSTRACT

According to the Federal Highway Administration of the U.S. Department of Transportation, there are more than 4.1 million miles of road in total length, making it the world’s longest and biggest road network with millions of culverts hidden underneath road in the United States. Trenchless technologies rehabilitation employ innovative methods, materials, and equipment that require minimum surface excavation and access. Trenchless technologies can be used when other conventional methods, such as open-cut methods are not applicable or cost-effective. Life-cycle cost analysis (LCCA) is an analytical method used to evaluate long-term investment options, and facilitate the associated costs which consists of three main modules as construction, environmental, and social costs. The objective of this paper is to develop a framework for LCCA for trenchless renewal methods for large diameter culverts and to identify and categorize the potential factors which contribute to LCCA with the help of literature review. It is found that host pipe length and diameter, rehab material, rehab thickness, and rehab design life were the key factors to construction cost. Also, material components, volume of materials, material transportation, project duration and location, and installation equipment were the main influencing factors to environmental cost. Last but not least, study shows that the location and duration of the project, type of traffic control, traffic peak, average annual daily traffic (AADT), pavement restoration cost, and noise indicator were the major potential factors to social cost. It can be concluded that many quantifiable factors are involving to have comprehensive evaluation of LCCA as an essential element when considering trenchless renewal of large diameter culverts. This framework can be utilized to evaluate LCCA in large diameter culverts for different trenchless renewal projects.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Alinizzi, M. F. (2013). “A Framework for Coordinating Water Distribution System and Pavement Infrastructure M&R Based on LCCA.” Master of Science Thesis, Purdue University, 2013.
ASCE. (2019). Guidelines for the Sustainable Design of Pipelines. Reston, VA (Under Print).
ASCE. (2010). Trenchless Renewal of Culverts and Storm Sewers., Reston, VA.
Beaudet, B. A., Tobey, B., and Harder, S. (2019). “Life Cycle Cost Analysis for Decision Making in Collection System Rehabilitation.” Proc. NASTT No-Dig Show, Chicago, IL, Mar 17-20, 2019.
CUIRE. (2008). An Asset Management Approach for Drainage Infrastructure and Culverts. The University of Texas, Arlington, Texas. USA.
Gangavarapu, B., and Najafi, M. (2003). “Quantitative Analysis and Comparison of Traffic Disruption Using Open-Cut and Trenchless Methods of Pipe Installation.” Journal ASCE Pipeline.
Hashemi, B., Iseley, T., & Raulston, J. (2011). “Water Pipeline Renewal Evaluation Using AWWA Class IV CIPP, Pipe Bursting, and Open-cut.” Proc. International Conference on Pipelines and Trenchless Technology 2011 October 26-29, 2011.
Jain, A. (2010). Evaluation of Trenchless Renewal Methods for Potable Water Distribution Pipes. Master’s Thesis. The University of Texas at Arlington. Arlington, Texas, USA.
Kaushal, V., Najafi, M., and Serajiantehrani, R. (2019). Environmental Impacts of Conventional Open-cut Pipeline Installation and Trenchless Technology Methods: A State-of-the-Art Review. Journal of Pipeline Systems Engineering and Practice, ASCE.
Kaushal, V. (2019). Comparison of Environmental and Social Costs of Trenchless Cured-in-Place Pipe Renewal Method with Open-Cut Pipeline Replacement for Sanitary Sewers. Ph.D.’s Dissertation. The University of Texas at Arlington. Arlington, Texas, USA.
Kaushal, V., Najafi, M., and Serajiantehrani, R. (2020). A Comparison of Construction Cost of Trenchless Cured-in-Place Pipe Renewal Method with Open-Cut Pipeline Replacement for Sanitary Sewers. The Third European and Mediterranean Structural Engineering and Construction Conference, Limassol, Cyprus, June 22-27.
Lee, H., Najafi, M., & Matthys, J. (2007). “Cost comparison of pipeline asset replacement: Open-cut and Pipe-bursting.” Proc. ASCE Pipelines 2007, Boston, Massachusetts.
Lueke, S. J., Matthews, C. J., Stowe, R., Lamont, C. (2015). “Comparing Carbon Footprints of Trenchless Water Main Renewal Technologies.” Proc. NASTT No-Dig Show.
Matthews, J. C., Allouche, E. N., & Sterling, R. L. (2015). “Social Cost Impact Assessment of Pipeline Infrastructure Projects.” Proc. Environmental Impact Assessment Review, 50, 196-202.
Matthews, j. C., and Allouche, E. N. (2010). “A Social Cost Calculator for Utility Construction Projects.” Proc. NASTT No-Dig Show.
MNDOT. (2015). Minnesota Drainage Maintenance Data Summary.
Najafi, M. (2013). Trenchless Technology: Planning, Equipment, and Methods. New York, McGraw-Hill.
Najafi, M. (2011). Pipeline Rehabilitation Systems for Service Life Extension-Chapter 10. University of Texas at Arlington, USA.
Najafi, M., and Kim, K. (2004). Life-Cycle-Cost Comparison of Trenchless and Conventional Open-Cut Pipeline Construction Projects. Michigan State University.
RSMeans (2019) Heavy Construction Cost Data, 33th Annual Edition, Reed Construction Data.
Serajiantehrani, M., Najafi, M., Janbaz, S., Korky, S., Malek Mohammadi, M., (2019). “Impact of Advance Rate of Microtunnel Boring Machines to Project Duration.” Proc. ASCE Pipelines.
Serajiantehrani, R. (2020). Development of a Machine Learning-based Prediction Model for Construction and Environmental Costs of Trenchless Spray-applied Pipe Linings, Cured-in-place Pipe, and Sliplining Methods in Large Diameter Culverts. Ph.D.’s Dissertation. The University of Texas at Arlington. Arlington, Texas, USA.
Tavakoli, R., Najafi, M., Tabesh, A., and Ashoori, T. (2017). “Comparison of Carbon Footprint of Trenchless and Open-Cut Methods for Underground Freight Transportation.” Proc. ASCE Pipelines.
Tymkowicz, S., (1995). Pipe Rebabilitatioh with Polyetbylere Pipe Lirers Construction Report for Iowa Highway Rese, Arch Board Project Br-370, March 1995.
Zhao, J. Q. and Rajani, B. (2002). Construction and Rehabilitation Costs for Buried Pipe with a Focus on Trenchless Technologies. Institute for Research in Construction National Research Council Canada, Ottawa, Canada. Concrete Pressure Pipe (CPP). CUIRE, Arlington, TX.

Information & Authors

Information

Published In

Go to Pipelines 2020
Pipelines 2020
Pages: 309 - 320
Editors: J. Felipe Pulido, OBG, Part of Ramboll and Mark Poppe, Brown and Caldwell
ISBN (Online): 978-0-7844-8319-0

History

Published online: Aug 6, 2020
Published in print: Aug 6, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Ramtin Serajiantehrani, Ph.D., A.M.ASCE [email protected]
Postdoctoral Research Associate, Center for Underground Infrastructure Research and Education, Dept. of Civil Engineering, Univ. of Texas at Arlington, Arlington, TX. Email: [email protected]
Mohammad Najafi, Ph.D., F.ASCE [email protected]
P.E.
Professor and Director, Center for Underground Infrastructure Research and Education, Dept. of Civil Engineering, Univ. of Texas at Arlington, Arlington, TX. Email: [email protected]
Mohammadreza Malek Mohammadi, Ph.D., S.M.ASCE [email protected]
Engineer in Training III, Alan Plummer Associate, Inc., Fort Worth, TX. Email: [email protected]
Vinayak Kaushal, Ph.D., A.M.ASCE [email protected]
Adjunct Professor and Postdoctoral Research Fellow, Center for Underground Infrastructure Research and Education, Dept. of Civil Engineering, Univ. of Texas at Arlington, Arlington, TX. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$96.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$96.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share