Chapter
Nov 9, 2020
Construction Research Congress 2020

Exploring Project Management Practices in the U.S. Transportation Agencies: A Literature Review

Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts

ABSTRACT

On any given day, transportation agencies have hundreds of projects underway. Besides, many of these projects face limited budgets and several other constraints during the project delivery process. Therefore, transportation agencies are experiencing unprecedented pressure to deliver projects successfully. Project success greatly depends on how the project has been managed and controlled. Since the successful delivery of transportation projects has great impacts on the public, it is important to investigate project management practices as a tool to improve project success. The objectives of this study include (1) reviewing the project management practices in transportation projects through reviewing the existing literature in this regard; (2) evaluating the existing project management practices and procedures in state departments of transportation to understand the available tools as well as the existing gaps; and (3) providing a comparative analysis of the project management best practices in different states. This study identified a list of twelve project management practices in transportation projects, including time management, cost management, quality control, environmental process, right-of-way, safety, outsourcing, value engineering, change orders, type of contraction, workforce qualification, and operation and maintenance. The results showed a lack of proper guidelines for quality control, outsourcing, workforce qualification, and operation and maintenance regarding project management best practices. The findings of this study could help researchers, project managers, and transportation agencies to enhance their understanding of the best practices on transportation project management.

Get full access to this article

View all available purchase options and get full access to this chapter.

ACKNOWLEDGMENT

This research was supported by the Louisiana Transportation Research Center (LTRC) Grant (LTRC Project No. 19-3PF, SIO No. DOTLT1000288 Southeast Transportation Consortium). Any opinions, findings, and conclusions or recommendations expressed in this paper are those of the authors and do not necessarily reflect the views of LTRC.

REFERENCES

Abdel-Wahab, M. S., Dainty, A. R., Ison, S. G., Bowen, P., and Hazlehurst, G. (2008). “Trends of skills and productivity in the UK construction industry.” Engineering, Construction and Architectural Management, 15(4), 372-382.
Aggor, K. K. (2017). “Relationship between budget and project success factors in the Ghanaian building construction sector.” Walden University.
Alias, Z., Zawawi, E., Yusof, K., and Aris, N. (2014). “Determining critical success factors of project management practice: A conceptual framework.” Procedia-Social and Behavioral Sciences, 153, 61-69.
Alnuaimi, A. S., Taha, R. A., Al Mohsin, M., and Al-Harthi, A. S. (2009). “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.” J. of Cons. Eng. and Management, 136(5), 615-622.
Amekudzi, A., and Meyer, M. D. (2006). “Considering the environment in transportation planning: Review of emerging paradigms and practice in the United States.” Journal of Urban Planning and Development, 132(1), 42-52.
Battikha, M. (2006). “Scheduling bridge and highway inspection/test activities with QUALITIME.” Applications of Advanced Technology in Transportation.
Chan, A. P., Scott, D., and Chan, A. P. (2004). “Factors affecting the success of a construction project.” J. of Cons. Eng. and Management, 130(1), 153-155.
Cheah, C. Y., and Ting, S. K. (2005). “Appraisal of value engineering in construction in Southeast Asia.” International J. of Project Management, 23(2), 151-158.
Chen, L., and Luo, H. (2014). “A BIM-based construction quality management model and its applications.” Automation in Construction, 46, 64-73.
Chong, H. Y., Lopez, R., Wang, J., Wang, X., and Zhao, Z. (2016). “Comparative analysis on the adoption and use of BIM in road infrastructure projects.” Journal of Management in Engineering, 32(6), 05016021.
Costin, A., Adibfar, A., Hu, H., and Chen, S. S. (2018). “Building Information Modeling (BIM) for transportation infrastructure–literature review, applications, challenges, and recommendations.” Automation in Cons.
Crossett, J., and Hines, L. (2007). “Comparing state DOTs' construction project cost & schedule performance: 28 best practices from 9 states.” AASHTO.
Deis, D. R., Watson, E., and Wilmot, C. G. (2002). “Designing a comprehensive model to evaluate outsourcing of Louisiana DOTD functions and activities.”
Durdyev, S., and Mbachu, J. (2011). “On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures.” Construction Economics and Building, 11(3), 18-33.
Ellis, R. D., and Thomas, H. R. "The root causes of delays in highway construction." Proc., Transportation Research Board: 82nd Annual Meeting, Citeseer.
Fanning, B., Clevenger, C. M., Ozbek, M. E., and Mahmoud, H. (2014). “Implementing BIM on infrastructure: Comparison of two bridge construction projects.” Practice Periodical on Structural Design and Construction, 20(4), 04014044.
Frangopol, D. M., and Liu, M. (2007). “Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost.” Structure and Infrastructure Engineering, 3(1), 29-41.
Gambatese, J., and Hinze, J. (1999). “Addressing construction worker safety in the design phase: Designing for construction worker safety.” Automation in Cons.
Ghavamifar, K., and Touran, A. (2008). “Alternative project delivery systems: Applications and legal limits in transportation projects.” Journal of Professional Issues in Engineering Education and Practice, 134(1), 106-111.
Hamilton, R. B., and Hyman, W. A. (2006). “Maintenance and operations of transportation facilities: 2005 strategic vision.” TRB.
Hunter, K. (2014). “Estimating preconstruction services costs for highway projects.” Master thesis, Iowa State University, Ames, IA.
Ismail, S. (2011). “Comparing in-house staff and consultant costs for highway design and construction.” Caltrans Division of Research and Innovation.
Karji, A., Woldesenbet, A., and Rokooei, S. "Integration of augmented reality, building information modeling, and image processing in construction management: A content analysis." Proc., AEI 2017, ASCE, 983-992.
Kermanshachi, S., Anderson, S. D., Goodrum, P., and Taylor, T. R. (2017). “Project scoping process model development to achieve on-time and on-budget delivery of highway projects.” Transportation Research Record: Journal of the Transportation Research Board (2630), 147-155.
Ketcham, S., Minsk, L. D., Blackburn, R. R., and Fleege, E. J. (1996). “Manual of practice for an effective anti-icing program: A guide for highway winter maintenance personnel.” United States. Federal Highway Administration.
Louisiana DOTD (2013). “Project delivery manual.” Louisiana Department of Transportation and Development, Baton Rouge, Louisiana.
McKim, R., Hegazy, T., and Attalla, M. (2000). “Project performance control in reconstruction projects.” J. of Cons. Eng. and Management, 126(2), 137-141.
McMinimee, J. C., Schaftlein, S., Warne, T. R., Detmer, S. S., Lester, M. C., Mroczka, G. F., Nichols, D. B., Taylor, J. N., Teikari, A. T., and Yew, C. (2009). “Best practices in project delivery management.”
Moore, A. T., Segal, G. F., and McCormally, J. (2000). “Infrastructure outsourcing: Leveraging concrete, steel and asphalt with public-private partnerships.”
Nasirzadeh, F., and Nojedehi, P. (2013). “Dynamic modeling of labor productivity in construction projects.” International J. of Project Management, 31(6), 903-911.
Navon, R. (2005). “Automated project performance control of construction projects.” Automation in construction, 14(4), 467-476.
Park, J., and Cai, H. (2017). “WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation.” Automation in Cons., 77, 15-23.
Project Management Institute (2007). Construction extension to a guide to the project management body of knowledge, Project Management Institute, Inc., Pennsylvania, USA.
Quiroga, C., and Pina, R. (2003). “Utilities in highway right-of-way: Data needs and modeling.” Transportation Research Record, 1851(1), 133-142.
Reese, C. D., and Eidson, J. V. (2006). Handbook of OSHA construction safety and health, CRC Press.
Safapour, E., Kermanshachi, S., and Ramaji, I. (2018). “Entity-based investigation of project complexity impact on size and frequency of construction phase change orders.” Proceedings of CRC, 2-4.
Shane, J. S., Molenaar, K. R., Anderson, S., and Schexnayder, C. (2009). “Construction project cost escalation factors.” J. of Management in Eng., 25(4), 221-229.
Sharrard, A. L., Matthews, H. S., and Ries, R. J. (2008). “Estimating construction project environmental effects using an input-output-based hybrid life-cycle assessment model.” Journal of Infrastructure Systems, 14(4), 327-336.
Taghi Nezhad Bilandi, A. (2018). “Costs and benefits of flood mitigation in Louisiana.” Doctoral dissertation, Louisiana State University, Baton Rouge.
Texas DOT (2017). “Project development process manual.” Texas DOT, Austin, Texas.
Warne, T. R. (2003). “State DOT outsourcing and private-sector utilization: A synthesis of highway practice.” NCHRP, Washington, D.C.
Williams, R. L. (1996). Longitudinal occupancy of controlled access right-of-way by utilities.
Wilmot, C. G. (1995). “Investigation into the cost-effectiveness of using consultants versus in-house staff in providing professional engineering services for Louisiana’s Department of Transportation and Development.” Louisiana Transportation Research Center, Baton Rouge, LA.
Wilmot, C. G., Deis, D. R., Schneider, H., and Coates, C. H. (1999). “In-house versus consultant design costs in state departments of transportation.” Transportation Research Record, 1654(1), 153-160.
Wilmot, C. G., and Mei, B. (2005). “Neural network modeling of highway construction costs.” J. of Cons. Eng. and Management, 131(7), 765-771.

Information & Authors

Information

Published In

Go to Construction Research Congress 2020
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 1375 - 1384
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9

History

Published online: Nov 9, 2020
Published in print: Nov 9, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Arash Taghinezhad [email protected]
Bert S. Turner Dept. of Construction Management, Louisiana State Univ., Baton Rouge, LA. E-mail: [email protected]
Amirhosein Jafari [email protected]
Bert S. Turner Dept. of Construction Management, Louisiana State Univ., Baton Rouge, LA. E-mail: [email protected]
Sharareh Kermanshachi [email protected]
Dept. of Civil Engineering, Univ. of Texas at Arlington, Arlington, TX. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share