Linear Scheduling Optimization Model for Planning Repetitive Construction Projects

Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts

ABSTRACT

Scheduling of repetitive construction projects is more complex and challenging due to large number of decision variables, constraints, and tradeoffs between time and cost. Traditional time-driven scheduling techniques such as critical path method (CPM) are inefficient in scheduling repetitive construction projects since they do not maintain crew work continuity. The present study focuses on developing an exact linear optimization model for scheduling repetitive construction projects with multiple crews and multiple options of construction methods for each activity. The optimization model is developed in three steps: (1) identifying decision variables; (2) formulating objective function and constraints; and (3) implementing model computations. Decision variables are identified to model start time of each activity at each unit, number of crews, idle time of crews, and construction methods. The objective function is designed to minimize the project total cost including the direct cost of activities, cost of additional crews for activities, and idle cost of crews during the entire project. Additionally, several constraints are integrated in the model to ensure practicality of the identified solution. Finally, the model computations are executed using the problem-based optimization modeling of MATLAB 2019a and mixed integer linear programming (MILP) solver in Gurobi. The performance of the developed model and its capabilities were tested on a case study of 100 repetitive units with nine activities to complete each unit. The optimization model identified the optimal schedule of the project while complying with specified duration. The results show the developed optimization model is capable of identifying optimal schedule of repetitive projects that can lead to minimum project cost while maintaining crew work continuity.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFRERENCES

Abdallah, M., and Alshahri, A. (2018). “Optimizing Planning of Build Operate Transfer Projects to Maximize Investor Profit.” Canadian Journal of Civil Engineering, NRC Research Press.
Berthaut, F., Pellerin, R., Perrier, N., and Hajji, A. (2014). “Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes.” International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, 6(3), 215–236.
El-Rayes, K., and Jun, D. H. (2009). “Optimizing Resource Leveling in Construction Projects.” Journal of Construction Engineering and Management, 135(11), 1172–1180.
El-Rayes, K., and Moselhi, O. (2002). “Optimizing Resource Utilization for Repetitive Construction Projects.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 127(1), 18–27.
Erengüç, S. S., Tufekci, S., and Zappe, C. J. (1993). “Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition.” Naval Research Logistics, 40, 25–50.
Gurobi Optimization. (2019). “Mixed-Integer Programming (MIP) – A Primer on the Basics.” MIP Basics, <https://www.gurobi.com/resource/mip-basics/>.
Gwak, H.-S., Son, S.-H., Park, Y.-J., and Lee, D.-E. (2016). “Exact Time–Cost Tradeoff Analysis in Concurrency-Based Scheduling.” Journal of Construction Engineering and Management, 142(10), 04016054.
Huang, Y., Zou, X., and Zhang, L. (2016). “Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic.” Journal of Management in Engineering, 32(4), 04016002.
Ioannou, P. G., and Yang, I.-T. (2016). “Repetitive scheduling method: Requirements, modeling, and implementation.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 142(5), 4016002.
Ipsilandis, P. G. (2007). “Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 133(6), 417–424.
Jun, D. H., and El-Rayes, K. (2011). “Multiobjective optimization of resource leveling and allocation during construction scheduling.” Journal of Construction Engineering and …, (December), 1080–1088.
Khalafallah, A., and El-Rayes, K. (2008). “Minimizing Construction-Related Security Risks during Airport Expansion Projects.” Journal of Construction Engineering and Management, 134(1), 40–48.
Khoueiry, Y., Srour, I., and Yassine, A. (2013). “An optimization-based model for maximizing the benefits of fast-track construction activities.” Journal of the Operational Research Society, Taylor & Francis, 64(8), 1137–1146.
Kim, J.-L. (2012). “Hybrid Genetic Algorithm Parameter Effects for Optimization of Construction Resource Allocation Problem.” Construction Research Congress 2012, American Society of Civil Engineers, Reston, VA, 1560–1569.
Klanšek, U. (2016). “Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs.” Journal of Construction Engineering and Management, 142(3), 04015088.
Kostogryzov, A., Krylov, V., Nistratov, A., Nistratov, G., Popov, V., and Stepanov, P. (2011). “Mathematical Models and Applicable Technologies to Forecast, Analyze, and Optimize Quality and Risks for Complex Systems.” ICTIS 2011, American Society of Civil Engineers, Reston, VA, 845–854.
Liu, S.-S., and Wang, C.-J. (2007). “Optimization model for resource assignment problems of linear construction projects.” Automation in Construction, 16(4), 460–473.
Lucko, G. (2009). “Productivity scheduling method: Linear schedule analysis with singularity functions.” Journal of Construction Engineering and Management, American Society of Civil Engineers, 135(4), 246–253.
Shrestha, K. K., and Shrestha, P. P. (2016). “Optimization of Project Schedule Crashing.” Construction Research Congress 2016, American Society of Civil Engineers, Reston, VA, 708–717.
Terry, S. B., and Lucko, G. (2012). “Algorithm for Time-Cost Tradeoff Analysis in Construction Projects by Aggregating Activity-Level Singularity Functions.” Construction Research Congress 2012, American Society of Civil Engineers, Reston, VA, 226–235.
Vanhoucke, M. (2006). “Work Continuity Constraints in Project Scheduling.” Journal of Construction Engineering and Management, 132(1), 14–25.
Zhang, L. (2015). Repetitive project scheduling: Theory and methods. Elsevier.
Zou, X., Fang, S.-C., Huang, Y.-S., and Zhang, L.-H. (2016). “Mixed-integer linear programming approach for scheduling repetitive projects with time-cost trade-off consideration.” Journal of computing in civil engineering, American Society of Civil Engineers, 31(3), 6016003.

Information & Authors

Information

Published In

Go to Construction Research Congress 2020
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 1129 - 1138
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9

History

Published online: Nov 9, 2020
Published in print: Nov 9, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Shahryar Monghasemi [email protected]
Dept. of Civil Engineering, Univ. of Colorado Denver, Denver, CO. E-mail: [email protected]
Moatassem Abdallah [email protected]
Dept. of Civil Engineering, Univ. of Colorado Denver, Denver, CO (corresponding author). E-mail: [email protected]
Caroline Clevenger [email protected]
Construction Engineering and Management, Dept. of Civil Engineering, Univ. of Colorado Denver, Denver, CO. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share