Optimal Selection of Integrated Project Procurement Strategies
Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
ABSTRACT
Identifying an appropriate procurement strategy is vital for the success of construction projects. Several researchers have developed models for identifying elements of a project procurement strategy, but most of these models have failed to consider all elements of an integrated strategy. This research develops a comprehensive decision support system that provides a full solution for an integrated procurement strategy. The strategy includes 1) the procurement route, 2) contractual arrangements, 3) contract type, 4) tender method, and 5) preferred financial document. The developed system identifies the most suitable procurement strategy according to 1) project characteristics and 2) owner preferences. Two decision support tools were developed and compared as part of this research; case based reasoning (CBR) and decision trees (DT). A total of 37 cases of project procurement were collected from interviews with five subject matter experts. The cases were subsequently fed into the CBR and DT systems. Validation was undertaken using seven cases to compare between the outcomes of the system and the chosen procurement strategy. Results showed predictive accuracy of 91% for CBR and 89% for DT. The findings of the research indicate that both the CBR and DT provide reasonable predictive accuracy when supplied with sufficient training cases. The outcome of the research can be used as a guide for owners and project management consultants in the construction industry to enable more effective selection of integrated procurement strategies for new projects.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Alhazmi, T., McCaffer, R. (2000). “Project procurement system selection model”. Journal of Construction Engineering and Management. 126, 176-184
Al-Jawhar, Rezouki (2001), “Identification of Procurement System Selection Criteria in the Construction Industry in Iraq by Using Delphi Method”. Proceedings of 2012 International Conference on Mangement Technology and Science.
Ambrose, Tucker (1999), “Matching a procurement system to client and project needs: a procurement system evaluator”. Proceedings: Customer Satisfaction: A Focus for Research and Practice in Construction, University of Cape Town, South Africa,. 280–288.
Barati, K., Shiran, G. R., & Sepasgozar, S. M. (2015). “Selecting optimal project delivery system for infrastructural projects using analytic hierarchy process”. American Journal of Civil Engineering and Architecture, 3(6), 212-217.
Chan, CTW 2007. “Fuzzy procurement selection model for construction”. Construction Management and Economics, vol. 25, no. 6, pp. 611-618.
Cheung, S.-O, Lam, TI & Leung, MY (2001), “An analytical hierarchy process based procurement selection method”. Construction Management and Economics, vol. 19, no. 4, pp. 427-437.
CICE (1982). “Contractual arrangements (report a-7)”. Business Roundtable, New York.
Contractual Arrangements (Report A-7). (1982). Business Roundtable, New York.
El-Sayegh. (2008). “Evaluating the effectiveness of project delivery methods”. Journal of Construction Management and Economics. 23. 457-465.
Love, M. Skitmore & G. Earl (1997). “Selecting a suitable procurement method for a building project”. Construction Management and Economics, 16:2, 221-233,
Office of Government Commerce (2007). “Procurement and Contract Strategies”. Achieving Excellence in Construction Procurement Guide 06.
Pishdad, P. and Beliveau, Y., (2010). “Analysis of existing project delivery and contracting strategy (PDCS) selection tools with a look towards emerging technology”, Journal of Construction Engineering and Management, Vol. 132 (1).
Rajeh, Mohammed. (2013). “Procurement Selection Model: Development of a Conceptual Model Based on Transaction Costs”. Australasian Journal of Construction Economics and Building. 2. 56-63.
Salah, A. (2019) Optimal selection of project procurement strategies. M.Sc. thesis. Cairo University, Egypt.
Shiyamini, R., Rameezdeen, R., Amaratunga, D.G., & Shanmugam, M. (2007). “Selection of suitable procurement systems in construction: a multi-criteria decision support model” Journal of Built Environment, 7 (2), 43-53.
Information & Authors
Information
Published In
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 1064 - 1072
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9
Copyright
© 2020 American Society of Civil Engineers.
History
Published online: Nov 9, 2020
Published in print: Nov 9, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.