Chapter
Nov 9, 2020
Construction Research Congress 2020

Planning BIM-Based Design Projects: A Product-Process Framework

Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts

ABSTRACT

The design phase of construction projects is a crucial stage that impacts the entire project’s lifecycle. Shape, constructability, serviceability, functionality, as well as the maintainability of the facility are all decided at this phase. While several studies have targeted the management of the execution phase of construction projects, monitoring and controlling of the design phase is still under-studied. Although the iterative and ill-structured nature of design complicate the management of design projects, a loosely controlled design process can lead to substantial project’s delays and overall project’s value loss. In this regard, this study develops a new framework that combines the product and process aspects of BIM-based design projects under a unified project management umbrella. A new definition of design tasks is introduced, and a practical design planning framework is developed accordingly. The findings show that the developed framework correlates between design activities and BIM model development, enables the systematic definition of design work packages across the duration of the project, enhances the representation of design process activities and corresponding information dependencies, and captures the involved design iterations at each stage of the product development process.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Abou-Ibrahim, Hisham, and Farook Hamzeh. 2016. "Enabling Lean Design Management: an LOD-Based Framework." Lean Construction Journal (LCJ) 12-24.
Ahuja, H. N. 1984. Project Management Techniques in Planning and Controlling Construction Projects.Chichester: John Wiley and Sons.
Al Hattab, M., and F. Hamzeh. 2016. "Using social network theory and simulation to compare traditional versus BIM-lean practice for design error management." Automation in Construction 52: 59-69.
Al Hattab, M., and F. Hamzeh. 2013. "Information Flow Comparison Between Traditional and Bim-Based Projects in the Design Phase." Formoso, C.T. & Tzortzopoulos, P., 21th Annual Conference of the International Group for Lean Construction. Fortaleza, Brazil. 761-770.
Austin, Simon, Andrew Baldwin, Li Baizhan, and Paul Waskett. 1999. "Analytical Design Planning Technique: a model of the detailed building design process." Design Studies 20: 279-296.
Carrascosa, M., S. D. Eppinger, and D. E. Whitney. 1998. "Using the Design Structure Matrix to Estimate Product Development Time." Proceedings of DETC’98 ASME Design Engineering Technical Conferences. Atlanta, Georgia, USA. 13-16.
Chung, M. J., P. Kwon, and B.T. Pentland. 2002. "Making Process Visible: A Grammatical Approach to Managing Design Processes." Journal of Mechanical Design124: 364-374.
Clarkson, P. J., and J. R. Hamilton. 2001. "Signposting: A Parameter-driven Task-based Model of the Design Process." Research in Engineering Design2 (1): 18-38.
Cooper, K. G. 1993. "The Rework Cycle: How it Really Works and Reworks." PM-Network.
Dvir, D., T. Raz, and A. J. Shenhar. 2003. "n Empirical Analysis of the Relationship between Project Planning and Project Success." International Journal of Proejct Management21: 89-95.
Eastman, C., J. Lee, Y. Jeong, and J. Lee. 2009. "Automatic Rule-Based Checking of Building Designs." Elsevier, Automation in Construction18: 1011-1033.
Evans, B., J. Powell, and R. Talbot. 1982. Changing Design.Chichester: John Wiley and Sons.
Federal Information Processing Standards. 1993. Integration Definition for Function Modelling (IDEF0). Publication 183, Gaithersburg, MD, USA: National Institute of Standards and Technology.
Gonzalez, V., L.F. Alarcon, and F. Mundaca. 2008. "Investigating the relationship between planning reliability and project performance." Production Planning and Control19 (5): 461-474.
Hamzeh, F.R., G. Ballard, and I.D. Tommelein. 2009. "Is the Last Planner System Applicable to Design? A Case Study." Taipei, Taiwan: Proc. 17th Ann. Conf. Int’l. Group for Lean Constr., IGLC 17. 165-176.
Hevner, A. R., S. T. March, J. Park, and S. Ram. 2004. "Design science in information systems research." MIS Quarterly28 (1): 75-105.
Hooper, Martin. 2015. "Automated model progression scheduling using level of development." Construction Innovation15 (4): 428 - 448.
Kusiak, A., and H. Yang. 1993. "Modelling the Design Process with Petri Nets." In Concurrent Engineering: Contemporary Issues and Modern Design Tools, edited by HR Parsaei and WG Sullivan. Chapman and Hall.
Leite, F., A. Akcamete, B. Akinci, G. Atasoy, and S. Kiziltas. 2011. "Analysis of Modeling Effort and Impact of Different Levels of Detail in Building Information Models." Elsevier, Automation in Construction20: 601-609.
March, S. T., and G. F. Smith. 1995. "Design and natural science research on information technology." Decision Support Systems15: 251-266.
Pritsker, A.A.B. 1966. GERT: Graphical Evaluation and Review Technique.The RAND Corporation: RM-4973-NASA.
Rocha, CG, CT Formoso, P Tzortzopoulos Fazenda, LJ Koskela, and A. Tezel. 2012. "Design science research in lean construction : process and outcomes." Proceedings for the 20th Annual Conference of the International Group for Lean Construction.
The American Institute of Architects. 2013. Guide, Instructions and Commentary to the 2013 AIA Digital Practice Documents.
Uusitalo, Petteri, Olli Seppänen, Eelon Lappalainen, Antti Peltokorpi, and Hylton Olivieri. 2019. "Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design Management." Buildings 9 (109).
Weygant, R.S. 2011. BIM Content Development: Standards, Strategies and Best Practices.Wiley.
Wynn, David C., Claudia M. Eckert, and P. John Clarkson. 2007. "Modelling Iteration in Engineering Deisgn." International Conference on Engineering Design, ICED’07. Paris.

Information & Authors

Information

Published In

Go to Construction Research Congress 2020
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 758 - 767
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9

History

Published online: Nov 9, 2020
Published in print: Nov 9, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Hisham Abou-Ibrahim [email protected]
Assistant Professor, Dept. of Industrial Engineering and Engineering Management, Beirut Arab Univ., Beirut, Lebanon. E-mail: [email protected]
Farook Hamzeh [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Alberta, Edmonton, AB, Canada. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share