Chapter
Nov 9, 2020
Construction Research Congress 2020

Artificial Intelligence Framework for Developing a Critical Path Schedule Using Historical Daily Work Report Data

Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts

ABSTRACT

A considerable amount of literature has employed data mining and machine learning (DM & ML) algorithms such as artificial neural networks (ANNs) to predict the duration of a construction project. However, these studies were mostly applied in the planning phase. Highway agencies use the critical path method (CPM) as one of the primary methods for estimating construction time. In contrary with DM & ML prediction models, CPM allows users to leverage detailed information available at the end of the design in estimating construction time and adjust the time if necessary based on the effects of various constraints and influential factors. CPM, however, has limitations, and one of them is its dependency on the expertise of schedulers to produce a reliable estimate. CPM also requires a significant amount of time and efforts from the schedulers to prepare the forecast. With the aims of mitigating those limitations and supporting highway agencies in establishing construction time using CPM, this study proposes a framework that leverages historical digital daily work report (DWR) data to automatically create draft CPM schedules for new projects by exploiting the combined strengths of CPM and DM & ML algorithms. The proposed framework uses activity-level data for estimating construction time such as construction activities, their corresponding quantities, and their start and finish times that are available in DWR data. As a result, the framework can estimate activity production rates using DM & ML models and determine activity relationships using Sequential Pattern Mining algorithms. DWR data collected from a highway agency were used to demonstrate the main components of the framework.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

ADOT (2015). "Estimating Contract Time." Arizona Department of Transportation.
Agrawal, R., and Srikant, R. "Mining sequential patterns." Proc., The 11th International Conference on Data Engineering (ICDE’95), 3-14.
Bromilow, F. "Contract time performance expectations and the reality." Proc., Building Forum, 70-80.
Chand, C., Thakkar, A., and Ganatra, A. (2012). "Sequential pattern mining: Survey and current research challenges." International Journal of Soft Computing and Engineering, 2(1), 185-193.
Fournier-Viger, P., Lin, J. C.-W., Kiran, R. U., Koh, Y. S., and Thomas, R. (2017). "A survey of sequential pattern mining." Data Science and Pattern Recognition, 1(1), 54-77.
Gransberg, D. D., Jeong, H. D., Karaca, I., and Gardner, B. (2017). "Top-Down Construction Cost Estimating Model/Guide Using a Neural Network." Montana. Dept. of Transportation.
Hoffman, G. J., Thal, A. E., Webb, T. S., and Weir, J. D. (2007). "Estimating Performance Time for Construction Projects." Journal of Management in Engineering, 23(4), 193-199.
Irfan, M., Khurshid, M. B., Anastasopoulos, P., Labi, S., and Moavenzadeh, F. (2011). "Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type." International Journal of Project Management, 29(1), 78-92.
ITD (2011). "Contract Time Determination in Project Development." Idaho Transportation Department.
Khosrowshahi, F., and Kaka, A. P. (1996). "Estimation of project total cost and duration for housing projects in the U.K." Building and Environment, 31(4), 375-383.
Le, C., Le, T., Jeong, H. D., and Lee, E.-B. (2019). "Geographic Information System–Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items." Journal of Construction Engineering and Management, 145(8), 04019044.
Mabroukeh, N. R., and Ezeife, C. I. (2010). "A taxonomy of sequential pattern mining algorithms." ACM Computing Surveys, 43(1), 1-41.
Mackova, M., Kozlovska, M., Baskova, R., Spisakova, M., and Krajnikova, K. (2017). "Construction-duration prediction model for residential buildings in Slovak Republic based on computer simulation." International Journal of Applied Engineering Research, 12(13), 3590-3599.
Mensah, I., Adjei-Kumi, T., and Nani, G. (2016). "Duration determination for rural roads using the principal component analysis and artificial neural network." Engineering, Construction and Architectural Management, 23(5), 638-656.
Peško, I., Mučenski, V., Šešlija, M., Radović, N., Vujkov, A., Bibić, D., and Krklješ, M. (2017). "Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM." Complexity, 2017, 1-13.
Shrestha, K. J., Jeong, H. D., and Gransberg, D. D. (2017). "Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basket." Journal of Construction Engineering and Management, 143(8), 04017036.
Son, J., Khwaja, N., and Milligan Duane, S. (2019). "Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects." Journal of Construction Engineering and Management, 145(4), 04019018.
Wang, Y.-R., and Gibson, G. E. (2010). "A study of preproject planning and project success using ANNs and regression models." Automation in Construction, 19(3), 341-346.

Information & Authors

Information

Published In

Go to Construction Research Congress 2020
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 565 - 573
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9

History

Published online: Nov 9, 2020
Published in print: Nov 9, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Chau Le, S.M.ASCE [email protected]
Ph.D. Student, Interdisciplinary Engineering, Texas A&M Univ., College Station, TX. E-mail: [email protected]
H. David Jeong, A.M.ASCE [email protected]
Professor, Dept. of Construction Science, Texas A&M Univ., College Station, TX. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share