Virtual Reality Supported Site Layout Planning for Modular Integrated Construction of High-Rise Buildings
Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
ABSTRACT
Site layout planning (SLP) is a classical assignment problem in determining the location of temporary facilities and site logistics. However, current research on SLP could not well fit in high-rise buildings using modular integrated construction (MiC) that is a game-changing construction practice transforming fragmented site activities into integrated module-driven construction. Therefore, this paper aims to develop an innovative SLP tool for high-rise modular buildings using virtual reality (VR) technology. First, a comprehensive literature review is conducted to identify the differences between conventional construction and MiC practices in terms of on-site activities, and analyze the previous methods on SLP and the features of VR technology. Second, the system architecture and functions of the VR-supported tool for SLP are designed. Third, the tool is developed with Unity3D and demonstrated using a real-life MiC project in Hong Kong. The demonstration reveals that the developed tool could help optimize the construction layout and module installation sequence through the provided functions of location tracking, overlapping area analysis, collision detection, simulation of different module installation scenarios, and lifting cost calculation. It proves that SLP assisted with VR technology can help construction planners identify the optimized facility locations to further secure the construction safety and increase the efficiency of module installation.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCE
Abdelhameed, W. A. (2012).“Virtual reality applications in project management scheduling.” Computer-Aided Design and Applications, 9(1), 71–78.
Bouchlaghem, D., Shang, H., Whyte, J., and Ganah, A. (2005).“Visualisation in architecture, engineering and construction (AEC).” Automation in Construction, 14(3), 287–295.
Gibb, A. G. F. (1999). Off-Site Fabrication: prefabrication, preassembly, and modularisation. Whittles Publishing.
Huang, C., Wong, C. K., and Tam, C. M. (2011).“Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming.” Automation in Construction, 20(5), 571–580.
Lawson, R. M., Ogden, R. G., and Bergin, R. (2012).“Application of Modular Construction in High-Rise Buildings.” Journal of Architectural Engineering, 18(2), 148–154.
Li, H., Chan, N. K. Y., Huang, T., Skitmore, M., and Yang, J. (2012).“Virtual prototyping for planning bridge construction.” Automation in Construction, 27, 1–10.
Pan, W., and Hon, C. K. (2018).“Modular integrated construction for high-rise buildings.” Proceedings of the Institution of Civil Engineers-Municipal Engineer, 1–12.
Pan, W., Yang, Y., Zhang, Z., and Chan, S. (2019). Modularisation for Modernisation: A Strategy Paper Rethinking Hong Kong Construction. HKU CICID, Hong Kong.
Pan, W., Zhan, W., Zhao, X., Wang, J., and Lam, J. C. (2016).“Cost paradigms of future building.” Symposium on Cost Management for Mega Projects.
Sacks, R., Perlman, A., and Barak, R. (2013).“Construction safety training using immersive virtual reality.” Construction Management and Economics, 31(9), 1005–1017.
Setareh, M., Bowman, D. A., and Kalita, A. (2005).“Development of a virtual reality structural analysis system.” Journal of architectural engineering, 11(4), 156–164.
Shiratuddin, M. F., Thabet, W., and Bowman, D. (2004).“Evaluating the Effectiveness of Virtual Environment Displays for Reviewing Construction 3D Models.” Proceedings of CONVR 2004, 87–98.
Sugimoto, Y., Seki, H., Samo, T., and Nakamitsu, N. (2016).“4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plants.” Automation in Construction, 71, 87–98.
Taghaddos, H., Eslami, A., Hermann, U., AbouRizk, S., and Mohamed, Y. (2019).“Auction-based Simulation for Industrial Crane Operations.” Automation in Construction, 104, 107–119.
Tantisevi, K., and Akinci, B. (2008).“Simulation-based identification of possible locations for mobile cranes on construction sites.” Journal of Computing in Civil Engineering, 22(1), 21–30.
Wang, G. G. (2002).“Definition and Review of Virtual Prototyping.” Journal of Computing and Information Science in Engineering, 2(3), 232.
Whyte, J., Bouchlaghem, N., Thorpe, A., and McCaffer, R. (2000).“From CAD to virtual reality: Modelling approaches, data exchange and interactive 3D building design tools.” Automation in construction, 10(1), 43–45.
Younes, A., and Marzouk, M. (2018).“Tower cranes layout planning using agent-based simulation considering activity conflicts.” Automation in Construction, 93, 348–360.
Zhang, P., Harris, F. C., Olomolaiye, P. O., and Holt, G. D. (1999).“Location optimization for a group of tower cranes.” Journal of construction engineering and management, 125(2), 115–122.
Zhang, Z., Pan, W. (2019). Virtual reality (VR) supported lift planning for modular integrated construction (MiC) of high-rise buildings. HKIE Transactions, 26(3). In Press.
Information & Authors
Information
Published In
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 339 - 347
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9
Copyright
© 2020 American Society of Civil Engineers.
History
Published online: Nov 9, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.