15th Triennial International Conference
Filling a Freshwater Lake—Sediment Remediation Considering Net Environmental Benefit for Multiple Stakeholder Goals
Publication: Ports 2019: Port Planning and Development
ABSTRACT
Multi-season sediment remedial actions began in June 2017 at Lora Lake, part of a larger Port of Seattle (Port) Model Toxics Control Act (MTCA) Cleanup Site managed by the Washington State Department of Ecology (Ecology) and will be completed in October 2019. The site is located on Port property within the secured area of Seattle-Tacoma International Airport, in a U.S. Army Corps of Engineers (USACE)-managed mitigation area, and within the Federal Emergency Management Agency (FEMA) 100-year floodplain. The site remedy includes placing 56,000 cubic yards of carbon-amended sand cap throughout the 3-acre manmade lake to return it to its native wetland condition. This remedial action was selected through a net environmental benefit approach that considered the goals of multiple agencies and stakeholders. Considerations included compliance with the U.S. Federal Aviation Administration rules for runway protection zones, reduction of aircraft navigation dangers from bird strikes, limitation of disturbance to surrounding USACE-managed mitigation areas, and water quality improvements to downstream Miller Creek, a salmon-bearing stream with local government and community interest. The collaborative remedial design effort included: remedy selection based on consideration of benefits and impacts to the surrounding ecosystem and airport; strategic coordination with local, state, and federal agencies regarding these short- and long-term impacts; and design incorporation of hydrogeologic groundwater flow and engineering floodplain analyses.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
ESA. (2016a) Lora Lake Parcel Remedial Action Mitigation Plan. Prepared for the Port of Seattle.
ESA. (2016b) Lora Lake Remedial Action—Engineering Floodplain Analysis Memorandum from Eleanor Bartolomeo and Curtis Loeb, ESA, to Robert Duffner and Don Robbins, Port of Seattle.
Floyd|Snider. (2015) Port of Seattle Lora Lake Apartments Site Remedial Investigation/ Feasibility Study. Prepared for the Port of Seattle.
Floyd|Snider. (2016) Update to Substantive Compliance with City of SeaTac Local Permits Memorandum from Jessi Massingale and Megan King, Floyd|Snider, to Sunny Becker, Ecology.
Parametrix, Inc. (2001) Natural Resources Mitigation Plan: Seattle-International Airport Master Plan Update Improvements. Prepared for the Port of Seattle.
Port of Seattle. (2005) Wildlife Hazard Management Plan: Seattle-Tacoma International Airport.
Port of Seattle. (2011) 2010 Wetland Mitigation Monitoring Report: Port of Seattle MPU Natural Resource Mitigation.
Port of Seattle. (2012) Lora Lake Remediation: Preliminary Wetland Impacts and Mitigation Analysis.
Port of Seattle. (2016) Lora Lake Remedial Action and Wetland Rehabilitation Project Permit Application.
Port of Seattle. (2018a) Letter from Bob Duffner, Port of Seattle, to Frank Nichols, USACE, re: Notification of Phase 2 Design Modifications.
Port of Seattle. (2018b) Letter from Bob Duffner, Port of Seattle, to Ali Shasti, City of SeaTac, re: Update to Substantive Compliance with City of SeaTac Local Permits—Port of Seattle.
State of Washington. (2015) Consent Decree Re: Lora Lake Apartments Site, Burien, Washington.
Information & Authors
Information
Published In
Ports 2019: Port Planning and Development
Pages: 33 - 43
Editors: Pooja Jain, Moffatt & Nichol and William S. Stahlman III, America's Central Port
ISBN (Online): 978-0-7844-8262-9
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Sep 12, 2019
Published in print: Sep 12, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.