A New PIANC Guideline for Managing Environmental Risks of Navigation Infrastructure Projects

Publication: Ports 2019: Port Planning and Development

ABSTRACT

A working group within the World Association for Waterborne Transport Infrastructure (PIANC) Environmental Commission is developing a standard of practice to support ports and other public and commercial navigation interests in managing environmental risks associated with navigation infrastructure projects. Decision making to manage these risks involves economic and environmental costs and is complicated by diverse policies, perspectives, risk attitudes, and personal values. The report will provide a robust, practical approach to managing environmental risks that considers physical, chemical, biological, and socioeconomic processes that can span broad spatial and temporal scales. Understanding and articulating uncertainties related to these processes is essential to developing projections regarding future risk management actions and adaptive management strategies. An overview will be provided of the structured management process through which actions for reducing environmental risks are identified, evaluated, selected, and implemented. Uncertainty (e.g., short-term infrastructure operations), long-range risks (e.g., climate change), residual risk, resiliency of natural features, and the role of sustainability and life-cycle analysis in risk management will be discussed. The approach is compatible with PIANC’s working with nature philosophy.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

AZ/NZS, 2009. ISO 31000:2009 Risk Management – Principles and Guidelines.
Bridges, T.S., Berry, W.J., Della Sala, S., Dorn, P.B., Ells, S.J., Gries, T.H., Ireland, D.S., Maher, E.M., Menzie, C.A., Porebski, L.M., and Stronkhorst, J., 2006. “A Framework for Assessing and Managing Risks from Contaminated Sediments.” Use of Sediment Quality Guidelines and Related Tools for the Assessment of Contaminated Sediments, ed. R.J. Wenning, G.E. Batley, C.G. Ingersoll and D.W. Moore, 227-266.
Bridges, T.S., Lillycrop, J., Wilson, J.R., Fredette, T.J., Suedel, B., Banks, C.J., and Russo, E.J. (2014). “Engineering with Nature Promotes Triple-Win Outcomes.” Terra Et Aqua. 135:17-23.
Bridges, T.S., Bourne, E.M., King, J.K., Kuzminski, H.K., Moyniham, E.B., and Suedel, B.C. (2018). Engineering with Nature®: An Atlas. ERDC/EL SR-18-8. Vicksburg, MS: U.S. Army Engineer Research and Development Center. https://doi.org/10.21079/11681/27929.
CEDA (Central Dredging Association). (2015). “Integrating Adaptive Environmental Management into Dredging Projects.” March 2015. https://dredging.org/media/ceda/org/documents/resources/cedaonline/2015-01-ceda_positionpaper-integrating_adaptive_environmental_management_into_dredging_projects.pdf.
De Vriend, H.J. and Van Koningsveld, M. (2012). “Building with Nature: Thinking, Acting and Interacting Differently.” EcoShape, Building with Nature, Dordrecht, the Netherlands.
Fischenich, C. and Vogt, C. et al. (2012). “The Application of Adaptive Management to Ecosystem Restoration Projects.” EBA Technical Notes Collection. ERDC TN-EMRRP-EBA-10. Vicksburg, MS: U.S. Army Engineer Research and Development Center.
Fredette, T.J., Foran, C.M., Brasfield, S.M. and Suedel, B.C. (2011). “Environmental Enhancements and Navigation Infrastructure: A Study of Existing Practices, Innovative Ideas, Impediments, and Research Needs.” ERDC/EL TR-11-7, U.S. Army Engineer Research and Development Center, Vicksburg, MS.
IADC (International Association of Dredging Companies). (2010). “Facts about Building with Nature.” IADC Information Update Number 3. http://www.iadc-dredging.com/index.php.
NRC (National Research Council). (2009). Science and Decisions: Advancing Risk Assessment. National Academy Press, Washington, DC.
Omenn, G.S., Kessler, A.C., Anderson, N.T., Chin, P.Y., Doull, J., Goldstein, B., Lederberg, J., McGuire, S., Rall, D., Weldon, V.V. (1997). Framework for Environmental Health Risk Management. The Presidential/Congressional Commission on Risk Assessment and Risk Management. Final Report, Volumes 1 & 2, Washington, D.C., http://www.riskworld.com.
PIANC. (2003). Guidelines for Sustainable Inland Waterways and Navigation. PIANC EnviCom WG 6. PIANC, Brussels, Belgium.
PIANC. (2006). Working Group EnviCom 10: Environmental Risk Assessment of Dredging and Disposal Operations. PIANC, Brussels, Belgium.
PIANC. (2008). Working with Nature. PIANC Position Paper. October 2008, Revised January 2011. PIANC, Brussels, Belgium.
PIANC. (2018). Working Group EnviCom 176: A Guide for Applying Working with Nature to Navigation Infrastructure Projects. PIANC, Brussels, Belgium.
Suedel, B.C., Fredette, T.J., and Corbino, J.M. (2014). “Island Building in the Atchafalaya River, Louisiana USA: An Engineering with Nature Demonstration Project.” World Dredging. 48(9/10):14-16.

Information & Authors

Information

Published In

Go to Ports 2019
Ports 2019: Port Planning and Development
Pages: 1 - 11
Editors: Pooja Jain, Moffatt & Nichol and William S. Stahlman III, America's Central Port
ISBN (Online): 978-0-7844-8262-9

History

Published online: Sep 12, 2019
Published in print: Sep 12, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Rebecca Gardner [email protected]
Principal Engineer, Anchor QEA, LLC, 720 Olive Way, Suite 1900, Seattle, WA 98101. E-mail: [email protected]
Burton C. Suedel [email protected]
Research Biologist, U.S. Army Corps of Engineers (USACE) Engineering Research and Development Center, 4155 Clay St., Vicksburg, MS 39183. E-mail: [email protected]
Senior Manager–Environment, North Queensland Bulk Ports Corporation, Level 1, Waterfront Place, Mulherin Dr., Mackay Harbour, QLD 4740, Australia. E-mail: [email protected]
David W. Moore [email protected]
Research Biologist, USACE Engineering Research and Development Center, 4155 Clay St., Vicksburg, MS 39183. E-mail: [email protected]
Kevin Allen [email protected]
Belfast Harbor Master, Port of Belfast, Belfast BT3 9AG, Ireland, U.K. E-mail: [email protected]
Engineer, Lally Consulting, LLC, 2811 Fairview Ave. E, #1004, Seattle, WA 98102. E-mail: [email protected]
Miran Vanwonterghem [email protected]
Project Engineer, Agency for Maritime and Coastal Services, Vrijhavenstraat 3, 8400 Oostende, Belgium. E-mail: [email protected]
Marine Scientist, 200 Broomielaw, Glasgow G1 4RU, U.K. E-mail: [email protected]
Todd S. Bridges [email protected]
Senior Scientist, USACE Engineering Research and Development Center, 4155 Clay St., Vicksburg, MS. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$126.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$126.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share