15th Triennial International Conference
Wharf Improvements for New Panamax Size Vessels
Publication: Ports 2019: Port Engineering
ABSTRACT
Recently completed improvements to South Carolina Ports Authority’s (SCPA) Wando Welch Terminal’s (WWT) 3,800-foot (1,158 m) wharf repaired and upgraded waterfront infrastructure to accommodate larger container vessels. As a result, the Wando Welch Terminal went from accommodating 8,000 twenty-foot equivalent (TEU) container vessels to 14,000 TEU vessels. Improvements included the following items: replacing crane rail beams, crane rails, bollards, fender systems, pin sockets, and crane tie-downs for ship-to-shore (STS) cranes, adding new concrete foundation piles, and existing pile repairs. Construction phasing was incorporated to maintain vessel operations and accommodate the arrival of STS cranes during construction. The work was performed over 33 months and showed that with proper planning, the improvements could be made while maintaining berth operations and accommodating other concurrent capital projects. This paper presents the design and operational considerations, as well as the construction challenges, of improving the WWT wharf infrastructure.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
ASCE (American Society of Civil Engineers). (2006) Minimum Design Loads for Buildings and Other Structures, Standard ASCE/SEI 7-05. Third printing. ASCE, Reston, VA
ASCE (American Society of Civil Engineers). (2013) Minimum Design Loads for Buildings and Other Structures, Standard ASCE/SEI 7-10. Third printing. ASCE, Reston, VA
F.E.M. (European Materials Handing Federation - Federation Europeenne De La Manutention) (1998). Rules for the Design of Hoisting Appliances, Standard F.E.M. 1.001.
Stehmeyer, E.H., Canivan, G.J., Camp, W.M. (2016). “In Situ Dynamic Pile Testing to Realize Wharf Renovation Saving.”, Proceedings of the Ports 2016 Conference, New Orleans, LA, ASCE, Reston, VA, 577-586.
United States Army Corps of Engineers (2015). “Charleston Harbor Post 45 - Final Integrated Feasibility Report and E.I.S.”, U.S. Army Corps of Engineers – Charleston District. http://www.sac.usace.army.mil/Missions/CivilWorks/CharlestonHarborPost45.aspx
Information & Authors
Information
Published In
Ports 2019: Port Engineering
Pages: 784 - 795
Editors: Pooja Jain, Moffatt & Nichol and William S. Stahlman III, America's Central Port
ISBN (Online): 978-0-7844-8261-2
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Sep 12, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.