ABSTRACT
The city of Brantford constructed a curved microtunnel in challenging soil conditions to upgrade the existing Greenwich sanitary trunk sewer (STS) in 2018. The new sewer provides additional capacity for future growth in the downtown core and for a new recreational facility jointly developed by the city, the YMCA, and Laurier University. Identified in the 2014 City of Brantford Master Servicing Plan for sanitary sewers, and subsequently confirmed with the city’s sewer modelling consultant, this project includes upgrades to the existing sanitary trunk sewer between Clarence Street South and the Greenwich Street sewage pumping station. The existing Greenwich sanitary trunk sewer (STS) in the city of Brantford was upgraded to provide additional capacity for future growth in the downtown core. The new sanitary trunk sewer was installed via microtunnel construction on a curved alignment (radius 970 m) and crossing an active rail corridor. The final installed length of microtunnel was 430 m proceeding through mixed-face ground conditions. Robinson Consultants Inc., together with Aldea Engineering Services Ltd., prepared the design for the microtunnel that was subsequently constructed by Ward & Burke Microtunnelling. This paper explores the challenges faced during design and construction, and the innovative solutions developed by the contractor and the project team to successfully complete the project on time and within budget. The paper also evaluates the application of a geotechnical baseline report (GBR) in the form of GBR sheets to establish the contractual ground conditions, and how the actual ground conditions were reflected in the data logs recorded by the microtunnel boring machine (MTBM).
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
BluePlan Engineering Consultants Limited (2014). “City of Brantford 2014 Master Servicing Plan (MSP) for Water, Sanitary and Stormwater Services.” Brantford, Ontario, Canada.
GM BluePlan Engineering Limited (2016). “Greenwich Sanitary Trunk Sewer Upgrade Capital Project – Hydraulic Modelling Analysis, and Engineering Services Assignment.” Brantford, Ontario, Canada.
Aldea Engineering Services Ltd. (2018). “Greenwich Sanitary Sewer Project WW1501 Microtunnel Summary Report.” Brantford, Ontario, Canada.
Ward & Burke Microtunnelling Ltd. (2017). “Tunnelling Proposal and Methodology involving the Microtunnelling Technique.” Brantford, Ontario, Canada.
Herrenknecht, AG (2006). “Technical Data Sheet, AVN 250 XC – AVN 700 XC.” Schwanau, Germany.
Tunnel Business Magazine (2014). “Featured Story: Advanced Microtunneling.” Brecksville, Ohio.
ASCE (American Society of Civil Engineers) (2007), “Geotechnical Baseline Reports for Construction: Suggested Guidelines, Second Edition.” Reston, Virginia.
Information & Authors
Information
Published In
Pipelines 2019: Condition Assessment, Construction, and Rehabilitation
Pages: 616 - 624
Editors: Jeffrey W. Heidrick, Burns & McDonnell and Mark S. Mihm, HDR
ISBN (Online): 978-0-7844-8249-0
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Jul 18, 2019
Published in print: Jul 18, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.