Pipelines 2019
Crossing That Bridge Later: Installing a Critical Water Pipeline over an Existing Bridge without Modifications
Publication: Pipelines 2019: Condition Assessment, Construction, and Rehabilitation
ABSTRACT
The Diablo Water District (district) is located in the northeastern part of Contra Costa County (county), in Northern California. One of the largest areas of anticipated growth for the District is on Bethel Island, a 5.6 square-mile island in the San Francisco Bay Delta area that is expected to grow from its current population of 2,200 residents to over 7,000 residents by 2040. In 2009, the County rebuilt the single, aging bridge that connects Bethel Island to the mainland with a new 900 ft long concrete bridge. As part of the planning for the bridge, the county allowed the district to reserve space within the bridge structure for construction of a future water pipeline with one restriction—no modifications would be allowed to the bridge during future water line installation. Growth within the district is driven and funded by development; because development was not active on the island in 2009, the district could not support the full predesign of a future water pipeline and could only give conservative guidance to the county in preparation for a future pipeline. In 2013, the district began working with a land developer to plan for a new 500-unit development on the island. The development was to be connected to the District’s main distribution system via a new 18-inch water pipeline over the Bethel Island Bridge. This paper discusses the design conditions considered for the pipeline: thermal expansion and contraction of the pipeline, differential seismic displacements between the pipeline and bridge, ground settlement at the bridge abutments, pipeline stability and flexibility, and overall constructability—all of which had to comply with the county’s requirement of “no bridge modifications”. The paper concludes with some lessons learned during construction.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
1.
American Water Works Association (AWWA) (2004). “AWWA M-11, Steel Water Pipe – A Guide for Design and Installation”, Fourth Edition.
2.
Berlogar Geotechnical Consultants (2004). “Geotechnical Investigation Bethel Island Road, Water Line Extension, Contra Costa, California”, May 7.
3.
Berlogar Stevens & Associates (2014). “Geotechnical Investigation Delta Coves Offsite Water Line, Bethel Island Road, Contra Costa, California”, January 8.
4.
EBAA Iron, Inc. (2005). Force Balanced FLEX-TEND, Force Balanced Expansion Joint.
5.
EBAA Iron, Inc. (2005). EX-TEND, Expansion Joint for Water and Waste Water Pipelines.
6.
Young, W. and Budynas, R. (2001). Roark’s Formulas for Stress and Strain, Seventh Edition. McGraw-Hill. 637.
Information & Authors
Information
Published In
Pipelines 2019: Condition Assessment, Construction, and Rehabilitation
Pages: 445 - 455
Editors: Jeffrey W. Heidrick, Burns & McDonnell and Mark S. Mihm, HDR
ISBN (Online): 978-0-7844-8249-0
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Jul 18, 2019
Published in print: Jul 18, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.