Automated Mining of Construction Schedules for Easy and Quick Assembly of 4D BIM Simulations
Publication: Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation
ABSTRACT
Over the past two decades, hundreds of studies have been published that demonstrate the benefits of 4D building information modeling (BIM) for optimizing construction planning and scheduling. Nonetheless to date, 4D BIM has only been adopted by 35–40% of top engineering news-record (ENR) companies and only used on a small fraction of their projects. The longevity of using 4D BIM also rarely outlasts the pre-construction phase. While the value associated with using 4D BIMs during the construction phase is well documented, the level of effort required to create them has significantly impacted perceptions about their return of investment (ROI) and limited their adoption. To address these inefficiencies, this paper presents a new method—comprised of text mining and machine learning (ML) techniques. Our method parses the description of construction schedule activities, assembles a breakdown structure of work locations/areas, and maps each activity to its corresponding 3D BIM element. Our method also labels each activity to a project phase such that these activities can be animated with different visual cues. Experiment results on 10 real-world construction projects show that the method achieved 89% accuracy in the parsing task. The benefits of the proposed method are discussed in detail.
Get full access to this article
View all available purchase options and get full access to this chapter.
ACKNOWLEDGEMENT
This work was supported by the National Science Foundation through grant CMMI-1446765. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.
REFERENCES
Akbas, R., Fischer, M., & Kunz, J. (2001). Formalizing domain knowledge for construction zone generation. Proceedings of the CIB-W78 International Conference IT in Construction in Africa, 30-1 to 30-16.
Akinci, B., Fischer, M., Kunz, J., & Levitt, R. (2002). Representing Work Spaces Generically in Construction Method Models. Journal of Construction Engineering and Management, 128(4), 296–305.
Altun, M., & Akcamete, A. (2019). A Method for Facilitating 4D Modeling by Automating Task Information Generation and Mapping. In Advances in Informatics and Computing in Civil and Construction Engineering (pp. 479-486). Springer, Cham.
Amer, F. & Golparvar-Fard, M. (in press). Formalizing Construction Sequencing Knowledge and Mining Company-Specific Best Practices from Past Project Schedules. International Conference on Computing in Civil Engineering, I3CE, June 2019, Atlanta, Georgia.
Ciribini, A. L. C., Ventura, S. M., & Paneroni, M. (2016). Implementation of an interoperable process to optimise design and construction phases of a residential building: A BIM Pilot Project. Automation in Construction, 71, 62-73.
Fischer, M., & Kunz, J. (2004). The Scope and Role of Information Technology in Construction. CIFE Technical Report, (156), 1–17.
Gao, J., Fischer, M., Tollefsen, T., & Haugen, T. (2005). Experiences with 3D and 4D CAD on building construction projects: benefits for project success and controllable implementation factors. Information Technology in Construction, (2002), 225–34. Retrieved from http://itc.scix.net/data/works/att/w78-2005-D3-1-Gao.pdf
Hartmann, T., & Fischer, M. (2009). A process view on end user resistance during construction it implementations. Electronic Journal of IT in Construction, 14(June), 353–365.
Kassem, M., Brogden, T., & Dawood, N. (2012). BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption. KICEM Journal of Construction Engineering and Project Management, 2(4), 1–10.
Koo, B., & Fischer, M. (1999). Feasibility Study of 4D CAD in Commercial Construction, 126(May), 92–99.
Montaser, A., & Moselhi, O. (2015, June). Methodology for automated generation of 4d bim. In 5th International/iith Construction Specialty Conference, Vancouver, British Columbia.
Park, J., & Cai, H. (2017). WBS-based dynamic multi-dimensional BIM database for total construction as-built documentation. Automation in Construction, 77, 15–23.
Russell, A., Staub-French, S., Tran, N., & Wong, W. (2009). Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction, 18(2), 219–236.
Siami-Irdemoosa, E., Dindarloo, S. R., & Sharifzadeh, M. (2015). Work breakdown structure (WBS) development for underground construction. Automation in Construction, 58, 85–94.
Information & Authors
Information
Published In
Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation
Pages: 432 - 438
Editors: Yong K. Cho, Ph.D., Georgia Institute of Technology, Fernanda Leite, Ph.D., University of Texas at Austin, Amir Behzadan, Ph.D., Texas A&M University, and Chao Wang, Ph.D., Louisiana State University
ISBN (Online): 978-0-7844-8242-1
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Jun 13, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.