Pipelines 2018
Design and Construction of the South Hartford CSO Tunnel
Publication: Pipelines 2018: Planning and Design
ABSTRACT
The South Hartford CSO Tunnel (South Tunnel) project is a significant component of the Metropolitan District’s SSO/CSO control program in Hartford, CT. The South Tunnel is a 4-mi.-long, 18-ft internal diameter wet weather tunnel that will eliminate sanitary sewer overflows (SSOs) and control combined sewer overflows (CSOs). Sewer diversion structures will be constructed at each CSO and SSO to replicate or intercept overflows and divert them to near-surface consolidation sewers. These consolidation sewers will in turn, discharge to one of eight hydraulic tangential vortex drop shafts which will convey the flow to the deep rock tunnel. Once in the tunnel, the sewer overflows will be stored and then pumped to receive proper treatment. The project was split into five construction contracts totalling approximately $410 MM. Advanced utility relocation and electrical upgrades have been completed. Construction of the deep rock tunnel, shafts, and deep rock connector tunnels are underway. The 35-ft diameter launch shaft has been excavated. The 70-ft diameter pump station shaft has been excavated to 80 ft below grade. The tunnel boring machine (TBM) has arrived onsite and is being assembled. By July 2018, the launch shaft, pump station shaft, fifteen drilled shafts, and the starter and tail tunnels should all be excavated and the TBM should be beginning its journey. This paper and presentation will focus on the design basis, progress to date, and lessons learned.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Nasri, V.; Sullivan, J.; Pelletier, A. and McCarthy, B. 2013. Design of South Hartford Conveyance and Storage Tunnel, Rapid Excavation Tunneling Conference 2013, Washington, DC, June 23–26, 2013, pp. 546–556.
Bakhshi, M., and Nasri, V. (2017), Design of Steel Fiber-Reinforced Concrete Segmental Lining for the South Hartford CSO Tunnel. Rapid Excavation Tunneling Conference 2017, San Diego, CA, June 4–7, 2017, pp. 706–717.
Information & Authors
Information
Published In
Pipelines 2018: Planning and Design
Pages: 69 - 80
Editors: Christopher C. Macey, AECOM and Jason S. Lueke, Ph.D., Associated Engineering
ISBN (Online): 978-0-7844-8164-6
Copyright
© 2018 American Society of Civil Engineers.
History
Published online: Jul 11, 2018
Published in print: Jul 12, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.