Chapter
Aug 3, 2017

Optimizing Utility Investigations on Large Design-Build Projects

Publication: Pipelines 2017

Abstract

Existing utilities can present large risks to projects of every kind, including design-build projects. One need not look any further than recent news releases to get a sense of the cost and time issues that can happen. The Honolulu Star-Advertiser states: “Years before utility line clearances posed the “most significant risk” to Honolulu rail, key project consultants downplayed Hawaiian Electric Co.’s warnings of a potential problem and stated that the plans they were developing should be OK.” ENR states “The I-405 expansion was Caltrans’ first design-build project. … utility maps for the Sepulveda Pass caused some of the delays on I-405.” There have also been some successes in managing utility risks. Given the wide range of practices for managing utility risks on projects, ASCE, NSPE, and ACEC in 2016 updated their EJCDC Design-Build master contract document set to include guidance on contractual language for utility investigations. This contractual language includes as a basic engineering service the projects’ use of ASCE 38, Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data. When coupled with an understanding of successful utility coordination processes and project sequencing, these two documents form a good framework for conducting utility investigations on design-build projects. This paper will illustrate how the use and sequencing of utility investigations as delineated in EJCDC contracts and ASCE 38 assists in reducing utility risks on design-build projects through examination of several large projects: Seattle’s Alaska Way Viaduct project, the North Tarrant Express and LBJ Managed Lanes Projects, and Houston’s Grand Parkway Project.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2017
Pipelines 2017
Pages: 148 - 159

History

Published online: Aug 3, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

James H. Anspach, F.ASCE [email protected]
Licenses Retired, Director, Cardno, Inc., Utility Market and Practice Development, P.O. Box 5994, Bend, OR 97708. E-mail: [email protected]
Robert E. Ramsey, M.ASCE
P.E.
Branch Manager, Cardno, Inc., Phoenix, AZ 85027.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$114.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$114.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share