Chapter
Aug 3, 2017

A Trenchless Approach to Lift Station Elimination

Publication: Pipelines 2017

Abstract

Initially in 2004, the City of Garland, Texas, approached Freese and Nichols, Inc. (FNI), about decommissioning a small lift station that was becoming a maintenance problem for the City staff. The City did not want to expend effort or funds into rehabilitating or replacing the lift station; it has preferred to eliminate lift stations, if possible, throughout the City. FNI conducted a study of the lift station service area, the gravity collection system in proximity of the lift station, and the topography of the immediate area surrounding the lift station site. The results of the study determined that it would require trench cuts in excess of 50-ft to install a gravity line by open-cut methods to the downstream system, and at the time the trenchless technology was not advanced enough to install a gravity wastewater line at grade for the lengths required for connecting to the existing collection system. FNI recommended to rehabilitate or replace the lift station due to the excessive expense and risk involved in attempting to run a new gravity line to eliminate the lift station. The City opted to wait, and attempted to maintain the existing lift station. Fast forward to 2014. The City of Garland contacted FNI to reinvestigate the same lift station and collection system. After 10 more years of use and maintenance, the lift station was even more of a problem for the City maintenance staff. FNI reviewed the 2004 study and determined that improvements in trenchless technology capabilities made it feasible to install a new gravity line at grade. The new line would enable the City to eliminate the lift station and connect the existing collection system to the service area of the existing lift station. This project would require over 3,500 ft of pipe to be installed by trenchless methods on a grade of approximately 0.01 ft/ft grade. The project was successfully installed and was put in service in the Spring of 2016 as designed. Now that trenchless technologies are making it more feasible to eliminate lift stations, this paper will give utility owners a greater understanding of what trenchless installation entails and what to consider when making that decision. The paper will show the audience how the City of Garland team researched, designed and constructed the project. It will describe the installation options that the project team explored, the precautions they took during design, and the measures they implemented to minimize risks. The paper will also discuss construction issues and challenges that trenchless projects may encounter, as well as lessons learned and other guidance for utility owners.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2017
Pipelines 2017
Pages: 144 - 156

History

Published online: Aug 3, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

Scott Maughn [email protected]
P.E.
Freese and Nichols, Inc., 2711 North Haskell 33rd Floor, Dallas, TX 75204. E-mail: [email protected]
Daniel Huffines [email protected]
P.E.
Freese and Nichols, Inc., 2711 North Haskell 33rd Floor, Dallas, TX 75204. E-mail: [email protected]
Lindy Higginbotham [email protected]
P.E.
City of Allen, 305 Century Parkway, Allen, TX 75013. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$112.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$112.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share