Chapter
Apr 4, 2017
Achieving Column-Free Platforms—Design and Construction of Large Span Station Mezzanines on the Second Avenue Subway Project
Authors: Renée Grigson, M.ASCE [email protected], and Michael Voorwinde, M.ASCE [email protected]Author Affiliations
Publication: Structures Congress 2017
Abstract
Phase 1 of the Second Avenue Subway in Manhattan, New York, is nearing completion. There are two mined cavern stations and one cut-and-cover station in this phase. All three stations have reinforced concrete mezzanines of similar geometry, with a large single span beam and slab system. This configuration allows for the provision of unobstructed column-free spaces at platform level and large central penetrations for vertical transportation. Each mezzanine is integral with the varied station shell types, providing intermediate lateral support, but each mezzanine was built under separate construction contracts. These factors required complex modelling of each system. The contrasting behavior of each station shell type and their respective construction staging results in significant differences in forces applied to the mezzanines, and in detailing, for both station types. Maintaining a consistent architectural feel between all stations required a unique structural design approach. This paper will discuss the design process, construction methodology and construction sequencing for each of the mezzanines, and review the similarities and differences in the design forces and subsequent structural design details for each. Special design considerations for large spans will also be explored. As construction of the mezzanines is now complete, the paper will review the final construction methodologies adopted and how these impacted the design. Attendees will gain an insight into the design of intermediate permanent lateral supporting systems in underground structures with large penetrations, and an understanding of the degree to which construction techniques and construction contract packaging can drive the design and detailing of structural members.
Get full access to this article
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Copyright
© 2017 American Society of Civil Engineers.
History
Published online: Apr 4, 2017
Permissions
Request permissions for this article.
Authors
Affiliations
CP.Eng.
AECOM, 125 Broad St., 14th Floor, New York, NY 10004. E-mail: [email protected]
P.E.
AECOM, 125 Broad St., 16th Floor, New York, NY 10004. E-mail: [email protected]
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.