Chapter
Jun 25, 2013
San Francisco Public Utilities Commission's Water System Improvement Program, Bay Division Pipelines 3 & 4 Crossovers Facilities Project, New Construction Methods and Focused Coordination Resulting in a Successful Project
Authors: LuAnn McVicker, Ph.D. [email protected], Johanna Wong [email protected], Bryan Dessaure [email protected], Bill Princeton Wong [email protected], Heather Manders [email protected], and Alan Johanson [email protected]Author Affiliations
Publication: Pipelines 2013: Pipelines and Trenchless Construction and Renewals—A Global Perspective
Abstract
The San Francisco Bay Area's primary water supply system, the Bay Division Pipelines, is highly vulnerable to seismic damage from the nearby San Andreas and Hayward fault zones. The San Francisco Public Utilities Commission's (SFPUC) $4.6B Water System Improvement Program (WSIP) consists of 81 projects to improve the seismic and delivery reliability to its customers. The Bay Division Pipelines (BDPLs 3 and 4) are two major SFPUC water transmission pressurized pipelines that extend 34 miles from Fremont to Redwood City in California, serving the heavily populated South Bay and southern Peninsula customers. BDPL 3 is a 72-inch diameter, welded steel and reinforced concrete pipe, depending on location. BDPL 4 is a 90-inch diameter, welded steel and pre-stressed concrete cylinder pipe, also depending on location. The BDPLs also convey the majority of San Francisco's water and replenish reservoirs in the Peninsula, enabling the SFPUC to meet peak summer demands.
Get full access to this article
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Published online: Jun 25, 2013
Permissions
Request permissions for this article.
Authors
Affiliations
Deputy Regional Construction Manager/Project Construction Manager, Jacobs Engineering, 160 Spear St., Suite 330, San Francisco, CA 94105 USA. E-mail: [email protected]
Regional Project Manager, San Francisco Public Utilities Commission, Project Management Bureau, 525 Golden Gate, 9th Floor, San Francisco, CA 94102. E-mail: [email protected]
Project Manager, San Francisco Public Utilities Commission, 525 Golden Gate, Project Management Bureau, 9th Floor, San Francisco, CA 94102. E-mail: [email protected]
Project engineer, San Francisco Public Utilities Commission, Engineering Management Bureau, 525 Golden Gate, 11th Floor, San Francisco, CA 94102. E-mail: [email protected]
Project engineer, San Francisco Public Utilities Commission, Engineering Management Bureau, 525 Golden Gate, 11th Floor, San Francisco, CA 94102. E-mail: [email protected]
P.E.
Deputy Director of WSIP Construction, San Francisco Public Utilities Commission, 525 Golden Gate, 6th Floor, San Francisco, CA 94102. E-mail: [email protected]
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.