Chapter
Apr 26, 2012

Isolation Piles Protection Research of the Tianning Tower in the Construction of the Shield Tunnel of Ningbo Metro Line 1

Publication: ICPTT 2011: Sustainable Solutions For Water, Sewer, Gas, And Oil Pipelines

Abstract

The interval tunnel between the Ximen station and the Drum Tower station of Ningbo metro line 1 goes through the national reserve cultural relics of Tianning tower. This interval tunnel is constructed by shield method. To ensure the safety of the Tianning tower, the impact of shield construction on the tower should be evaluated. Two kinds of FEM software are used in the safety assessment to analyze the additional deformation of the Tianning tower caused by shield construction. In order to reduce the differential settlement and incline of the tower, the isolation piles protection is considered to use as protection method. For the different calculation schemes of pile location, pile length and pile diameter, the protective effect is analyzed and the measures are proposed.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to ICPTT 2011
ICPTT 2011: Sustainable Solutions For Water, Sewer, Gas, And Oil Pipelines
Pages: 1856 - 1863

History

Published online: Apr 26, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Yanming Yao [email protected]
Ningbo Urban Rail Transit Management Department, Ningbo, Zhejiang 315000, China.E-mail: [email protected]
Shijun Wang [email protected]
Guangzhou Metro Design and Research Institute, Guangzhou, Guangdong 510010, China.E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share