The Few, the Proud: The Challenge to Upgrade Infrastructure on Active Military Installations and How One Utility Overcame

Publication: Pipelines 2011: A Sound Conduit for Sharing Solutions

Abstract

Replace, rehabilitate, or simply eliminate? Utilities often struggle to determine the best approach to upgrade existing infrastructure. The approach becomes more complex when the existing infrastructure is located on fully operating Military installations adjacent to wetlands and water bodies. This paper provides an overview of the approach used to improve wastewater assets acquired by the Beaufort-Jasper Water & Sewer Authority (BJWSA) on two local Military installations. Additionally, the paper will provide an overview of why and how the BJWSA acquired aging infrastructure on the Military bases, and the effects the Military's constraints had on selecting the "best" approaches. As part of a federal utility privatization initiative, the BJWSA competed for and acquired water and wastewater systems located on four Military installations. Consequently, the BJWSA completed an Initial System Modification (ISM) assessment defining projects to be funded by the Utility Privatization (UP) Contract so that the assets are brought up to an acceptable condition. Since being awarded the UP Contract, the BJWSA has implemented a design and construction program for a number of ISM projects that includes strict adherence to each Military installation's security, safety, environmental, and cultural resources protection requirements. Jacobs Engineering Group, Inc. performed pipe rehabilitation services about of 40,000 linear feet (LF) of sewer at the Marine Corps Recruiting Depot at Parris Island (MCRD-PI) and 3,000 LF of sewer at the Naval Hospital. Services included sewer cleaning, smoke testing, CCTV inspection and defect identification, manhole inspection and evaluation. A computerized assessment program was implemented to help manage the data. The sewers at the Naval Hospital have been re-lined using cured-in-place pipe (CIPP) and the sewers at MCRD-PI are slated to be rehabilitated using multiple methods, including CIPP and pipe bursting, beginning in spring, 2011. However, the sewer rehabilitation project represents just one part of an overall ISM program that is anticipated to cost about $14 million and be completed by late 2011. A key point of this paper is that the BJWSA's acquisition of the MCRD-PI Military installation not only improved aging wastewater assets on the bases, but did so without disruption to the day-to-day operations

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2011
Pipelines 2011: A Sound Conduit for Sharing Solutions
Pages: 589 - 595

History

Published online: Apr 26, 2012

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

O. O. Flynn [email protected]
P.E.
Jacobs Engineering Group Inc., 4000 Faber Place Drive, Suite 210, North Charleston, SC, 29405.E-mail: [email protected]
C. T. Sexton, Jr. [email protected]
P.E.
Beaufort-Jasper Water & Sewer Authority, 6 Snake Road, Okatie, SC, 29909.E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share